메뉴 건너뛰기




Volumn 15, Issue 8, 2011, Pages 1319-1328

Quantitative approach for project performance measurement on building construction in South Korea

Author keywords

building construction; key performance indicator; metrics; quantitative analysis

Indexed keywords

BUILDING CONSTRUCTION; COMPARATIVE ANALYSIS; CONSTRUCTION PROJECTS; EVALUATION CRITERIA; KEY PERFORMANCE INDICATORS; LEVEL OF SATISFACTION; METRICS; PERFORMANCE ASSESSMENT METHODOLOGY; PERFORMANCE INDICATORS; PERFORMANCE LEVEL; PERFORMANCE MEASUREMENT SYSTEM; PROJECT CONTROL SYSTEMS; PROJECT GOALS; PROJECT PERFORMANCE; PROJECT STAKEHOLDERS; QUANTITATIVE APPROACH; RESIDENTIAL BUILDING; SOUTH KOREA; STANDARD PROCEDURES;

EID: 80355144849     PISSN: 12267988     EISSN: 19763808     Source Type: Journal    
DOI: 10.1007/s12205-011-1323-5     Document Type: Article
Times cited : (44)

References (18)
  • 1
    • 0001386480 scopus 로고    scopus 로고
    • Modeling project performance for decision making
    • Alarcon, L. F. and Ashley, D. B. (1996). "Modeling project performance for decision making." ASCE J. Constr. Eng. Manage., Vol. 122, No. 3, pp. 265-273.
    • (1996) ASCE J. Constr. Eng. Manage. , vol.122 , Issue.3 , pp. 265-273
    • Alarcon, L.F.1    Ashley, D.B.2
  • 2
    • 80355141267 scopus 로고    scopus 로고
    • Developing measurement system for key performance indicators on building construction projects
    • Cha, H. and Kim, T. (2008). "Developing measurement system for key performance indicators on building construction projects." KICEM J. of Constr. Mgmt., Vol. 9, No. 4, pp. 120-130 (in Korean).
    • (2008) KICEM J. Of Constr. Mgmt. , vol.9 , Issue.4 , pp. 120-130
    • Cha, H.1    Kim, T.2
  • 3
    • 33745297161 scopus 로고    scopus 로고
    • Characteristics for leveraging value management processes on capital facility projects
    • Cha, H. and O'Connor, J. T. (2006). "Characteristics for leveraging value management processes on capital facility projects." ASCE J. of Mgmt Engr. Vol. 22, No. 3, pp. 135-147.
    • (2006) ASCE J. Of Mgmt Engr. , vol.22 , Issue.3 , pp. 135-147
    • Cha, H.1    O'Connor, J.T.2
  • 4
    • 13944265046 scopus 로고    scopus 로고
    • Factors affecting the success of a construction project
    • Chan, A. P. C., Scott, D., and Chan, A. P. L. (2004). "Factors affecting the success of a construction project." ASCE J. Constr. Eng. Manage., Vol. 130, No. 1, pp. 153-155.
    • (2004) ASCE J. Constr. Eng. Manage. , vol.130 , Issue.1 , pp. 153-155
    • Chan, A.P.C.1    Scott, D.2    Chan, A.P.L.3
  • 5
    • 80355141268 scopus 로고    scopus 로고
    • Constructing Excellence, London, U.K.: CE
    • Constructing Excellence (CE) (2006). Industry performance report 2006, CE, London, U. K.
    • (2006) Industry Performance Report 2006
  • 6
  • 8
    • 77956330475 scopus 로고    scopus 로고
    • Performance measurement system for benchmarking in the construction industry
    • LO-School, Elsinore, Denmark
    • Costa, D. B., Formoso, C. T., Kagioglou, M., and Alarcon, L. F. (2004). "Performance measurement system for benchmarking in the construction industry." Proc. 12th IGLC Conf., LO-School, Elsinore, Denmark, pp. 451-463.
    • (2004) Proc. 12th IGLC Conf , pp. 451-463
    • Costa, D.B.1    Formoso, C.T.2    Kagioglou, M.3    Alarcon, L.F.4
  • 9
    • 13944268320 scopus 로고    scopus 로고
    • Management's perception of key performance indicators for construction
    • Cox, R. F., Issa, R. R. A., and Ahrens, D. (2003) "Management's perception of key performance indicators for construction." ASCE J. Constr. Eng. Manage., Vol. 129, pp. 2, pp. 142-151.
    • (2003) ASCE J. Constr. Eng. Manage. , vol.129 , pp. 2
    • Cox, R.F.1    Issa, R.R.A.2    Ahrens, D.3
  • 11
    • 77049091120 scopus 로고    scopus 로고
    • Performance metric development for pharmaceutical construction projects
    • Hwang, B., Thomas, S., and Caldas, C. (2010). "Performance metric development for pharmaceutical construction projects." Int. J. of Proj. Mgmt, Vol. 28, No. 3, pp. 265-274.
    • (2010) Int. J. Of Proj. Mgmt , vol.28 , Issue.3 , pp. 265-274
    • Hwang, B.1    Thomas, S.2    Caldas, C.3
  • 12
    • 80355130710 scopus 로고    scopus 로고
    • A proposal on the assessment criteria and conceptual methodology of performance measurement based on efficiency through construction project life cycle
    • Jung, S., Kim, Y., Jin, S. and Yoon, S. (2005). "A proposal on the assessment criteria and conceptual methodology of performance measurement based on efficiency through construction project life cycle." J. of Architectural Institute of Korea, Vol. 21, No. 7, pp. 139-148. (in Korean).
    • (2005) J. Of Architectural Institut. Of Korea , vol.21 , Issue.7 , pp. 139-148
    • Jung, S.1    Kim, Y.2    Jin, S.3    Yoon, S.4
  • 13
    • 29044442114 scopus 로고    scopus 로고
    • Using weibull analysis for evaluation of cost and schedule performance
    • Khaled, M. N., Hordur, G. G., and Mohamed, Y. H.(2005). "Using weibull analysis for evaluation of cost and schedule performance." ASCE J. Constr. Engrg. and Mgmt., Vol. 131, No. 12, pp. 1257-1262.
    • (2005) ASCE J. Constr. Engrg. And Mgmt. , vol.131 , Issue.12 , pp. 1257-1262
    • Khaled, M.N.1    Hordur, G.G.2    Mohamed, Y.H.3
  • 14
    • 80355127873 scopus 로고    scopus 로고
    • A study on the selection of post-evaluation factors for the building construction
    • Kim, W., Koo, K., and Hyun, C. (2003). "A study on the selection of post-evaluation factors for the building construction." J. of Architectural Institute of Korea, Vol. 19, No. 12, pp. 171-178. (in Korean).
    • (2003) J. Of Architectural Institut. Of Korea , vol.19 , Issue.12 , pp. 171-178
    • Kim, W.1    Koo, K.2    Hyun, C.3
  • 15
    • 13944258129 scopus 로고    scopus 로고
    • Project performance vs. use of technologies at the project- and phase-levels
    • O'Connor, J. T. and Yang, L. (2004). "Project performance vs. use of technologies at the project- and phase-levels." ASCE J. Constr. Eng. Manage., Vol. 130, No. 3, pp. 322-329.
    • (2004) ASCE J. Constr. Eng. Manage. , vol.130 , Issue.3 , pp. 322-329
    • O'Connor, J.T.1    Yang, L.2
  • 16
    • 80355122685 scopus 로고    scopus 로고
    • Performance measurement techniques and best practice in construction projects
    • Shin, Y., and Kim, H. (2004). "Performance measurement techniques and best practice in construction projects." J. of Architectural Institute of Korea, Vol. 20, No. 3, pp. 109-116. (in Korean).
    • (2004) J. Of Architectural Institut. Of Korea , vol.20 , Issue.3 , pp. 109-116
    • Shin, Y.1    Kim, H.2
  • 17
    • 80355130711 scopus 로고    scopus 로고
    • Quality performance management system for construction projects using quality performance indicators
    • Song, S., Lee, H., and Park, M. (2006). "Quality performance management system for construction projects using quality performance indicators." KICEM J. of Const. Mgmt., Vol. 7, No. 3, pp. 76-85. (in Korean).
    • (2006) KICEM J. Of Const. Mgmt. , vol.7 , Issue.3 , pp. 76-85
    • Song, S.1    Lee, H.2    Park, M.3
  • 18
    • 34250667136 scopus 로고    scopus 로고
    • Comparable performance measurement system for construction companies
    • Yu, I., Kim, K., Jung, Y. and Chin, S. (2007). "Comparable performance measurement system for construction companies." ASCE J. of Mgmt. Engr., Vol. 23, No. 3, pp. 131-139.
    • (2007) ASCE J. Of Mgmt. Engr. , vol.23 , Issue.3 , pp. 131-139
    • Yu, I.1    Kim, K.2    Jung, Y.3    Chin, S.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.