메뉴 건너뛰기




Volumn 39, Issue 2, 2012, Pages 2232-2235

Alternative approach for solving replenishment lot size problem with discontinuous issuing policy and rework

Author keywords

Discontinuous issuing policy; Imperfect EPQ model; Replenishment lot size; Rework; Scrap; Supply chains optimization

Indexed keywords

ALGEBRAIC APPROACHES; ALTERNATIVE APPROACH; CONVENTIONAL APPROACH; COST FORMULA; DISCONTINUOUS ISSUING POLICY; ECONOMIC ORDER QUANTITY; ECONOMIC PRODUCTION QUANTITY; EPQ MODELS; INTERNATIONAL JOURNALS; LOT SIZE; OPTIMAL LOT SIZE; OPTIMALITY; PRODUCTION COST; PRODUCTION SYSTEM; REWORK; SCRAP;

EID: 80054921487     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2011.08.030     Document Type: Conference Paper
Times cited : (46)

References (28)
  • 1
    • 0036833065 scopus 로고    scopus 로고
    • Quality improvement and setup reduction in the joint economic lot size model
    • DOI 10.1016/S0377-2217(01)00308-3, PII S0377221701003083
    • J.F. Affisco, M.J. Paknejad, and F. Nasri Quality improvement and setup reduction in the joint economic lot size model European Journal of Operational Research 142 3 2002 497 508 (Pubitemid 34863167)
    • (2002) European Journal of Operational Research , vol.142 , Issue.3 , pp. 497-508
    • Affisco, J.F.1    Paknejad, M.J.2    Nasri, F.3
  • 3
    • 70349443216 scopus 로고    scopus 로고
    • An integrated approach for logistic and vendor managed inventory in supply chain
    • V. Arora, F.T.S. Chan, and M.K. Tiwari An integrated approach for logistic and vendor managed inventory in supply chain Expert Systems with Applications 37 1 2010 39 44
    • (2010) Expert Systems with Applications , vol.37 , Issue.1 , pp. 39-44
    • Arora, V.1    Chan, F.T.S.2    Tiwari, M.K.3
  • 4
    • 0035906315 scopus 로고    scopus 로고
    • The economic production quantity (EPQ) with shortage derived algebraically
    • DOI 10.1016/S0925-5273(00)00068-2, PII S0925527300000682
    • L.E. Cárdenas-Barrón The economic production quantity (EPQ) with shortage derived algebraically International Journal of Production Economics 70 2001 289 292 (Pubitemid 32272157)
    • (2001) International Journal of Production Economics , vol.70 , Issue.3 , pp. 289-292
    • Cardenas-Barron, L.E.1
  • 5
    • 0026116409 scopus 로고
    • Economic order quantity model with demand-dependent unit production cost and imperfect production processes
    • T.C.E. Cheng An economic order quantity model with demand-dependent unit production cost and imperfect production processes IIE Transactions 23 1991 23 28 (Pubitemid 21651734)
    • (1991) IIE Transactions (Institute of Industrial Engineers) , vol.23 , Issue.1 , pp. 23-28
    • Cheng, T.C.E.1
  • 6
    • 33748316522 scopus 로고    scopus 로고
    • Optimal replenishment policies for the case of a demand function with product-life-cycle shape in a finite planning horizon
    • DOI 10.1016/j.eswa.2005.11.019, PII S0957417405003088
    • C.-K. Chen, C. Liao, and T.-C. Weng Optimal replenishment policies for the case of a demand function with product-life-cycle shape in a finite planning horizon Expert Systems with Applications 32 1 2007 65 76 (Pubitemid 44322039)
    • (2007) Expert Systems with Applications , vol.32 , Issue.1 , pp. 65-76
    • Chen, C.-K.1    Liao, C.2    Weng, T.-C.3
  • 7
    • 80053281930 scopus 로고    scopus 로고
    • Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework
    • (in press) doi:10.1002/cnm.1369
    • Chiu, S. W.; Chen, K.-K.; & Lin, H.-D. (in press). Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework. International Journal for Numerical Methods in Biomedical Engineering. doi:10.1002/cnm.1369.
    • International Journal for Numerical Methods in Biomedical Engineering
    • Chiu, S.W.1    Chen, K.-K.2    Lin, H.-D.3
  • 8
  • 9
    • 72949118882 scopus 로고    scopus 로고
    • Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
    • Y.-S.P. Chiu, K.-K. Chen, F.-T. Cheng, and M.-F. Wu Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown Computers and Mathematics with Applications 59 2 2010 919 932
    • (2010) Computers and Mathematics with Applications , vol.59 , Issue.2 , pp. 919-932
    • Chiu, Y.-S.P.1    Chen, K.-K.2    Cheng, F.-T.3    Wu, M.-F.4
  • 10
    • 29144436069 scopus 로고    scopus 로고
    • Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries
    • DOI 10.1016/j.cor.2005.02.019, PII S0305054805000754
    • A. Diponegoro, and B.R. Sarker Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries Computers and Operations Research 33 8 2006 2387 2404 (Pubitemid 41802295)
    • (2006) Computers and Operations Research , vol.33 , Issue.8 , pp. 2387-2404
    • Diponegoro, A.1    Sarker, B.R.2
  • 11
  • 12
    • 0028464619 scopus 로고
    • Expected duration analysis of a two-stage transfer-line production system subject to inspection and rework
    • M.N. Gopalan, and S. Kannan Expected duration analysis of a two-stage transfer-line production system subject to inspection and rework Journal of Operational Research Society 45 7 1994 797 805
    • (1994) Journal of Operational Research Society , vol.45 , Issue.7 , pp. 797-805
    • Gopalan, M.N.1    Kannan, S.2
  • 13
    • 0017416997 scopus 로고
    • Integrated inventory model for a single supplier-single customer problem
    • S.K. Goyal Integrated inventory model for a single supplier-single customer problem International Journal of Production Research 15 1977 107 111
    • (1977) International Journal of Production Research , vol.15 , pp. 107-111
    • Goyal, S.K.1
  • 15
    • 0032096710 scopus 로고    scopus 로고
    • Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions
    • M. Hariga, and M. Ben-Daya Note: The economic manufacturing lot-sizing problem with imperfect production processes: bounds and optimal solutions Naval Research Logistics 45 1998 423 433 (Pubitemid 128587344)
    • (1998) Naval Research Logistics , vol.45 , Issue.4 , pp. 423-433
    • Hariga, M.1    Ben-Daya, M.2
  • 16
    • 0030190937 scopus 로고    scopus 로고
    • Optimizing a production system with a fixed delivery schedule
    • R.M. Hill Optimizing a production system with a fixed delivery schedule Journal of Operational Research Society 47 1996 954 960 (Pubitemid 126576160)
    • (1996) Journal of the Operational Research Society , vol.47 , Issue.7 , pp. 954-960
    • Hill, R.M.1
  • 18
    • 3242701287 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with rework process at a single- stage production system
    • A.M.M. Jamal, B.R. Sarker, and S. Mondal Optimal manufacturing batch size with rework process at a single- stage production system Computers and Industrial Engineering 47 2004 77 89
    • (2004) Computers and Industrial Engineering , vol.47 , pp. 77-89
    • Jamal, A.M.M.1    Sarker, B.R.2    Mondal, S.3
  • 19
    • 0037400725 scopus 로고    scopus 로고
    • Optimizing inventory decisions in a multi-stage multi-customer supply chain
    • DOI 10.1016/S1366-5545(02)00036-4
    • M. Khouja Optimizing inventory decisions in a multi-stage multi-customer supply chain Transportation Research Part E: Logistics and Transportation Review 39 3 2003 193 208 (Pubitemid 36302882)
    • (2003) Transportation Research Part E: Logistics and Transportation Review , vol.39 , Issue.3 , pp. 193-208
    • Khouja, M.1
  • 20
    • 0029632685 scopus 로고    scopus 로고
    • A one-vendor multi-buyer integrated inventory model
    • L. Lu A one-vendor multi-buyer integrated inventory model European Journal of Operational Research 81 2 2005 312 323
    • (2005) European Journal of Operational Research , vol.81 , Issue.2 , pp. 312-323
    • Lu, L.1
  • 22
    • 0004909888 scopus 로고
    • Expert system for selecting priority rules in flexible manufacturing systems
    • H. Pierreval Expert system for selecting priority rules in flexible manufacturing systems Expert Systems with Applications 5 1-2 1992 51 57
    • (1992) Expert Systems with Applications , vol.5 , Issue.12 , pp. 51-57
    • Pierreval, H.1
  • 23
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • M.J. Rosenblatt, and H.L. Lee Economic production cycles with imperfect production processes IIE Transactions 18 1986 48 55
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 24
    • 0033297229 scopus 로고    scopus 로고
    • Optimal batch size for a production system operating under periodic delivery policy
    • R.A. Sarker, and L.R. Khan Optimal batch size for a production system operating under periodic delivery policy Computers and Industrial Engineering 37 1999 711 730
    • (1999) Computers and Industrial Engineering , vol.37 , pp. 711-730
    • Sarker, R.A.1    Khan, L.R.2
  • 26
    • 0031245728 scopus 로고    scopus 로고
    • Modelling fuzzy production rules with fuzzy expert networks
    • PII S0957417497000298
    • E.C.C. Tsang, and D.S. Yeung Modelling fuzzy production rules with fuzzy expert networks Expert Systems with Applications 13 3 1997 169 178 (Pubitemid 127382737)
    • (1997) Expert Systems with Applications , vol.13 , Issue.3 , pp. 169-178
    • Tsang, E.C.C.1    Yeung, D.S.2
  • 28
    • 37849188598 scopus 로고    scopus 로고
    • A discussion on economic ordering policy of deteriorated item for vendor and buyer
    • DOI 10.1080/09537280600741913, PII L216537P4217H767
    • H.M. Wee, J.F. Jong, and P.C. Yang A discussion on economic ordering policy of deteriorated item for vendor and buyer Production Planning and Control 17 8 2006 792 795 (Pubitemid 44826020)
    • (2006) Production Planning and Control , vol.17 , Issue.8 , pp. 792-795
    • Wee, H.M.1    Jong, J.F.2    Yang, P.C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.