-
1
-
-
0036833065
-
Quality improvement and setup reduction in the joint economic lot size model
-
DOI 10.1016/S0377-2217(01)00308-3, PII S0377221701003083
-
J.F. Affisco, M.J. Paknejad, and F. Nasri Quality improvement and setup reduction in the joint economic lot size model European Journal of Operational Research 142 3 2002 497 508 (Pubitemid 34863167)
-
(2002)
European Journal of Operational Research
, vol.142
, Issue.3
, pp. 497-508
-
-
Affisco, J.F.1
Paknejad, M.J.2
Nasri, F.3
-
2
-
-
44949283405
-
AI approaches to production management
-
S. Arff, G. Hasle, G. Stokke, and J.C. Gjerløw AI approaches to production management Expert Systems with Applications 3 2 1991 229 239
-
(1991)
Expert Systems with Applications
, vol.3
, Issue.2
, pp. 229-239
-
-
Arff, S.1
Hasle, G.2
Stokke, G.3
Gjerløw, J.C.4
-
3
-
-
70349443216
-
An integrated approach for logistic and vendor managed inventory in supply chain
-
V. Arora, F.T.S. Chan, and M.K. Tiwari An integrated approach for logistic and vendor managed inventory in supply chain Expert Systems with Applications 37 1 2010 39 44
-
(2010)
Expert Systems with Applications
, vol.37
, Issue.1
, pp. 39-44
-
-
Arora, V.1
Chan, F.T.S.2
Tiwari, M.K.3
-
4
-
-
0035906315
-
The economic production quantity (EPQ) with shortage derived algebraically
-
DOI 10.1016/S0925-5273(00)00068-2, PII S0925527300000682
-
L.E. Cárdenas-Barrón The economic production quantity (EPQ) with shortage derived algebraically International Journal of Production Economics 70 2001 289 292 (Pubitemid 32272157)
-
(2001)
International Journal of Production Economics
, vol.70
, Issue.3
, pp. 289-292
-
-
Cardenas-Barron, L.E.1
-
5
-
-
0026116409
-
Economic order quantity model with demand-dependent unit production cost and imperfect production processes
-
T.C.E. Cheng An economic order quantity model with demand-dependent unit production cost and imperfect production processes IIE Transactions 23 1991 23 28 (Pubitemid 21651734)
-
(1991)
IIE Transactions (Institute of Industrial Engineers)
, vol.23
, Issue.1
, pp. 23-28
-
-
Cheng, T.C.E.1
-
6
-
-
33748316522
-
Optimal replenishment policies for the case of a demand function with product-life-cycle shape in a finite planning horizon
-
DOI 10.1016/j.eswa.2005.11.019, PII S0957417405003088
-
C.-K. Chen, C. Liao, and T.-C. Weng Optimal replenishment policies for the case of a demand function with product-life-cycle shape in a finite planning horizon Expert Systems with Applications 32 1 2007 65 76 (Pubitemid 44322039)
-
(2007)
Expert Systems with Applications
, vol.32
, Issue.1
, pp. 65-76
-
-
Chen, C.-K.1
Liao, C.2
Weng, T.-C.3
-
7
-
-
80053281930
-
Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework
-
(in press) doi:10.1002/cnm.1369
-
Chiu, S. W.; Chen, K.-K.; & Lin, H.-D. (in press). Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework. International Journal for Numerical Methods in Biomedical Engineering. doi:10.1002/cnm.1369.
-
International Journal for Numerical Methods in Biomedical Engineering
-
-
Chiu, S.W.1
Chen, K.-K.2
Lin, H.-D.3
-
9
-
-
72949118882
-
Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
-
Y.-S.P. Chiu, K.-K. Chen, F.-T. Cheng, and M.-F. Wu Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown Computers and Mathematics with Applications 59 2 2010 919 932
-
(2010)
Computers and Mathematics with Applications
, vol.59
, Issue.2
, pp. 919-932
-
-
Chiu, Y.-S.P.1
Chen, K.-K.2
Cheng, F.-T.3
Wu, M.-F.4
-
10
-
-
29144436069
-
Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries
-
DOI 10.1016/j.cor.2005.02.019, PII S0305054805000754
-
A. Diponegoro, and B.R. Sarker Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries Computers and Operations Research 33 8 2006 2387 2404 (Pubitemid 41802295)
-
(2006)
Computers and Operations Research
, vol.33
, Issue.8
, pp. 2387-2404
-
-
Diponegoro, A.1
Sarker, B.R.2
-
12
-
-
0028464619
-
Expected duration analysis of a two-stage transfer-line production system subject to inspection and rework
-
M.N. Gopalan, and S. Kannan Expected duration analysis of a two-stage transfer-line production system subject to inspection and rework Journal of Operational Research Society 45 7 1994 797 805
-
(1994)
Journal of Operational Research Society
, vol.45
, Issue.7
, pp. 797-805
-
-
Gopalan, M.N.1
Kannan, S.2
-
13
-
-
0017416997
-
Integrated inventory model for a single supplier-single customer problem
-
S.K. Goyal Integrated inventory model for a single supplier-single customer problem International Journal of Production Research 15 1977 107 111
-
(1977)
International Journal of Production Research
, vol.15
, pp. 107-111
-
-
Goyal, S.K.1
-
15
-
-
0032096710
-
Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions
-
M. Hariga, and M. Ben-Daya Note: The economic manufacturing lot-sizing problem with imperfect production processes: bounds and optimal solutions Naval Research Logistics 45 1998 423 433 (Pubitemid 128587344)
-
(1998)
Naval Research Logistics
, vol.45
, Issue.4
, pp. 423-433
-
-
Hariga, M.1
Ben-Daya, M.2
-
16
-
-
0030190937
-
Optimizing a production system with a fixed delivery schedule
-
R.M. Hill Optimizing a production system with a fixed delivery schedule Journal of Operational Research Society 47 1996 954 960 (Pubitemid 126576160)
-
(1996)
Journal of the Operational Research Society
, vol.47
, Issue.7
, pp. 954-960
-
-
Hill, R.M.1
-
18
-
-
3242701287
-
Optimal manufacturing batch size with rework process at a single- stage production system
-
A.M.M. Jamal, B.R. Sarker, and S. Mondal Optimal manufacturing batch size with rework process at a single- stage production system Computers and Industrial Engineering 47 2004 77 89
-
(2004)
Computers and Industrial Engineering
, vol.47
, pp. 77-89
-
-
Jamal, A.M.M.1
Sarker, B.R.2
Mondal, S.3
-
19
-
-
0037400725
-
Optimizing inventory decisions in a multi-stage multi-customer supply chain
-
DOI 10.1016/S1366-5545(02)00036-4
-
M. Khouja Optimizing inventory decisions in a multi-stage multi-customer supply chain Transportation Research Part E: Logistics and Transportation Review 39 3 2003 193 208 (Pubitemid 36302882)
-
(2003)
Transportation Research Part E: Logistics and Transportation Review
, vol.39
, Issue.3
, pp. 193-208
-
-
Khouja, M.1
-
20
-
-
0029632685
-
A one-vendor multi-buyer integrated inventory model
-
L. Lu A one-vendor multi-buyer integrated inventory model European Journal of Operational Research 81 2 2005 312 323
-
(2005)
European Journal of Operational Research
, vol.81
, Issue.2
, pp. 312-323
-
-
Lu, L.1
-
22
-
-
0004909888
-
Expert system for selecting priority rules in flexible manufacturing systems
-
H. Pierreval Expert system for selecting priority rules in flexible manufacturing systems Expert Systems with Applications 5 1-2 1992 51 57
-
(1992)
Expert Systems with Applications
, vol.5
, Issue.12
, pp. 51-57
-
-
Pierreval, H.1
-
23
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
M.J. Rosenblatt, and H.L. Lee Economic production cycles with imperfect production processes IIE Transactions 18 1986 48 55
-
(1986)
IIE Transactions
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
24
-
-
0033297229
-
Optimal batch size for a production system operating under periodic delivery policy
-
R.A. Sarker, and L.R. Khan Optimal batch size for a production system operating under periodic delivery policy Computers and Industrial Engineering 37 1999 711 730
-
(1999)
Computers and Industrial Engineering
, vol.37
, pp. 711-730
-
-
Sarker, R.A.1
Khan, L.R.2
-
26
-
-
0031245728
-
Modelling fuzzy production rules with fuzzy expert networks
-
PII S0957417497000298
-
E.C.C. Tsang, and D.S. Yeung Modelling fuzzy production rules with fuzzy expert networks Expert Systems with Applications 13 3 1997 169 178 (Pubitemid 127382737)
-
(1997)
Expert Systems with Applications
, vol.13
, Issue.3
, pp. 169-178
-
-
Tsang, E.C.C.1
Yeung, D.S.2
-
28
-
-
37849188598
-
A discussion on economic ordering policy of deteriorated item for vendor and buyer
-
DOI 10.1080/09537280600741913, PII L216537P4217H767
-
H.M. Wee, J.F. Jong, and P.C. Yang A discussion on economic ordering policy of deteriorated item for vendor and buyer Production Planning and Control 17 8 2006 792 795 (Pubitemid 44826020)
-
(2006)
Production Planning and Control
, vol.17
, Issue.8
, pp. 792-795
-
-
Wee, H.M.1
Jong, J.F.2
Yang, P.C.3
|