메뉴 건너뛰기




Volumn 22, Issue 7, 2011, Pages 870-890

An advanced overlapping production planning model in manufacturing supply chain

Author keywords

Finite capacity planning; Genetic algorithm (GA); Manufacturing industries; Overlapping production planning; Supply chain management; Supply chain planning

Indexed keywords

CAPACITY CONSTRAINTS; CAPACITY INFORMATION; CYCLE TIME; DESIGN/METHODOLOGY/APPROACH; FINITE CAPACITY; FLEXIBLE PRODUCTION; FLOW-SHOPS; MANUFACTURING ENVIRONMENTS; MANUFACTURING INDUSTRIES; MULTI-SITE; OVERLAPPING OPERATIONS; OVERLAPPING PRODUCTION; OVERLAPPING PRODUCTION PLANNING; PROCESS SELECTION; PRODUCTION PLANNING; PRODUCTION PLANS; PRODUCTION SCHEDULE; PRODUCTION SCHEDULING PROBLEMS; PRODUCTION STRATEGY; SEQUENTIAL CONSTRAINTS; SUPPLY AND DEMAND; SUPPLY CHAIN PLANNING; WORK SHIFTS;

EID: 80054883317     PISSN: 1741038X     EISSN: None     Source Type: Journal    
DOI: 10.1108/17410381111160942     Document Type: Article
Times cited : (7)

References (16)
  • 2
    • 0033894341 scopus 로고    scopus 로고
    • Overlapping production planning: A new approach of bounded capacity management
    • DOI 10.1016/S0925-5273(99)00031-6
    • Bahroun, Z., Campagne, J.P. and Moalla, M. (2000), "The overlapping production planning: a new approach of bounded capacity management", International Journal of Production Economics, Vol. 64 No. 1, pp. 21-36. (Pubitemid 30557640)
    • (2000) International Journal of Production Economics , vol.64 , Issue.1 , pp. 21-36
    • Bahroun, Z.1    Campagne, J.-P.2    Moalla, M.3
  • 3
    • 0026902990 scopus 로고
    • A DSS for optimizing the aggregate production planning at Monsanto Antwerp
    • Bloemen, R. and Maes, J. (1992), "A DSS for optimizing the aggregate production planning at Monsanto Antwerp", European Journal of Operational Research, Vol. 61 No. 1, pp. 30-40.
    • (1992) European Journal of Operational Research , vol.61 , Issue.1 , pp. 30-40
    • Bloemen, R.1    Maes, J.2
  • 4
    • 0002893158 scopus 로고
    • Resource deployment analysis of global manufacturing and distribution networks
    • Cohen, M.A. and Lee, H.L. (1989), "Resource deployment analysis of global manufacturing and distribution networks", Journal of Manufacturing and Operations Management, Vol. 2 No. 2, pp. 81-104.
    • (1989) Journal of Manufacturing and Operations Management , vol.2 , Issue.2 , pp. 81-104
    • Cohen, M.A.1    Lee, H.L.2
  • 5
    • 84904687670 scopus 로고
    • Genetic algorithm and evolution strategies: Similarities and differences
    • Hoffmeister, F. and Baeck, T. (1991), "Genetic algorithm and evolution strategies: similarities and differences", Lecture Notes in Computer Science, Vol. 496, pp. 455-69.
    • (1991) Lecture Notes in Computer Science , vol.496 , pp. 455-469
    • Hoffmeister, F.1    Baeck, T.2
  • 6
    • 49049098244 scopus 로고    scopus 로고
    • Overlapping production scheduling planning with multiple objectives - An ant colony approach
    • Huang, R.H. and Yang, C.L. (2008), "Overlapping production scheduling planning with multiple objectives - an ant colony approach", International Journal of Production Economics, Vol. 115, pp. 163-70.
    • (2008) International Journal of Production Economics , vol.115 , pp. 163-170
    • Huang, R.H.1    Yang, C.L.2
  • 7
    • 0034627935 scopus 로고    scopus 로고
    • Efficient methods for scheduling make-to-order assemblies under resource, assembly area and part availability constraints
    • DOI 10.1080/002075400189653
    • Kolisch, R. and Hess, K. (2000), "Efficient methods for scheduling make-to-order assemblies under resource, assembly area and part availability constraints", International Journal of Production Research, Vol. 38 No. 1, pp. 207-28. (Pubitemid 35393643)
    • (2000) International Journal of Production Research , vol.38 , Issue.1 , pp. 207-228
    • Kolisch, R.1    Hess, K.2
  • 8
    • 0036642595 scopus 로고    scopus 로고
    • Advanced planning and scheduling with outsourcing in manufacturing supply chain
    • DOI 10.1016/S0360-8352(02)00079-7, PII S0360835202000797
    • Lee, Y.H., Jeong, C.S. and Moon, C. (2002), "Advanced planning and scheduling with outsourcing in manufacturing supply chain", Computers & Industrial Engineering, Vol. 43 No. 3, pp. 351-74. (Pubitemid 34551917)
    • (2002) Computers and Industrial Engineering , vol.43 , Issue.1-2 , pp. 351-374
    • Lee, Y.H.1    Jeong, C.S.2    Moon, C.3
  • 9
    • 70249093672 scopus 로고    scopus 로고
    • Integration of production planning and scheduling: Overview, challenges and opportunities
    • Maravelias, C.T. and Sung, C. (2009), "Integration of production planning and scheduling: overview, challenges and opportunities", Computers & Chemical Engineering, Vol. 33, pp. 1919-30.
    • (2009) Computers & Chemical Engineering , vol.33 , pp. 1919-1930
    • Maravelias, C.T.1    Sung, C.2
  • 10
    • 0033889979 scopus 로고    scopus 로고
    • Dynamic relocation and phase-out of a hybrid, two-echelon plant/warehousing facility: A multiple objective approach
    • DOI 10.1016/S0377-2217(99)00166-6
    • Melachrinoudis, E. and Min, H. (2000), "The dynamic relocation and phase-out of a hybrid, two-echelon plant/warehousing facility: a multiple objective approach", European Journal of Operational Research, Vol. 123 No. 1, pp. 1-15. (Pubitemid 30575848)
    • (2000) European Journal of Operational Research , vol.123 , Issue.1 , pp. 1-15
    • Melachrinoudis, E.1    Min, H.2
  • 11
    • 0036642688 scopus 로고    scopus 로고
    • Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain
    • DOI 10.1016/S0360-8352(02)00078-5, PII S0360835202000785
    • Moon, C., Kim, J. and Hur, S. (2002), "Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain", Computers & Industrial Engineering, Vol. 43 No. 3, pp. 331-49. (Pubitemid 34551916)
    • (2002) Computers and Industrial Engineering , vol.43 , Issue.1-2 , pp. 331-349
    • Moon, C.1    Kim, J.2    Hur, S.3
  • 12
    • 41449093762 scopus 로고    scopus 로고
    • Integrated process planning and scheduling in a supply chain
    • DOI 10.1016/j.cie.2007.06.018, PII S0360835207001088
    • Moon, C., Lee, Y.H., Jeong, C.S. and Yun, Y.S. (2008), "Integrated process planning and scheduling in a supply chain", Computers & Industrial Engineering, Vol. 54, pp. 1048-61. (Pubitemid 351458373)
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.4 , pp. 1048-1061
    • Moon, C.1    Lee, Y.H.2    Jeong, C.S.3    Yun, Y.4
  • 14
    • 56549112491 scopus 로고    scopus 로고
    • Integration of process planning and scheduling -a modified genetic algorithm-based approach
    • Shao, X., Li, X., Gao, L. and Zhang, C. (2009), "Integration of process planning and scheduling -a modified genetic algorithm-based approach", Computers & Operations Research, Vol. 36, pp. 2081-96.
    • (2009) Computers & Operations Research , vol.36 , pp. 2081-2096
    • Shao, X.1    Li, X.2    Gao, L.3    Zhang, C.4
  • 15
    • 0037082299 scopus 로고    scopus 로고
    • Planning, scheduling and control systems: Why cannot they work together
    • DOI 10.1016/S0098-1354(01)00737-2, PII S0098135401007372
    • Shobrys, D.E. and White, D.C. (2002), "Planning, scheduling and control systems: why cannot they work together", Computers & Chemical Engineering, Vol. 26, pp. 149-60. (Pubitemid 34211481)
    • (2002) Computers and Chemical Engineering , vol.26 , Issue.2 , pp. 149-160
    • Shobrys, D.E.1    White, D.C.2
  • 16
    • 9244249675 scopus 로고    scopus 로고
    • An intelligent optimal production scheduling approach using constraint-based search and agent-based collaboration
    • Xue, D., Sun, J. and Norrie, D.H. (2001), "An intelligent optimal production scheduling approach using constraint-based search and agent-based collaboration", Computers in Industry, Vol. 46 No. 2, pp. 209-31.
    • (2001) Computers in Industry , vol.46 , Issue.2 , pp. 209-231
    • Xue, D.1    Sun, J.2    Norrie, D.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.