메뉴 건너뛰기




Volumn 64, Issue 1, 2000, Pages 21-36

Overlapping production planning: A new approach of bounded capacity management

Author keywords

[No Author keywords available]

Indexed keywords

INVENTORY CONTROL; PROCESS CONTROL; RESOURCE ALLOCATION; SCHEDULING; STRATEGIC PLANNING;

EID: 0033894341     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(99)00031-6     Document Type: Article
Times cited : (9)

References (17)
  • 1
    • 0026902990 scopus 로고
    • A DSS for optimizing the aggregate production planning at Monsanto Antwerp
    • Bloemen R., Maes J. A DSS for optimizing the aggregate production planning at Monsanto Antwerp. European Journal of Operational Research. 61(1):1992;30-40.
    • (1992) European Journal of Operational Research , vol.61 , Issue.1 , pp. 30-40
    • Bloemen, R.1    Maes, J.2
  • 2
    • 0028374441 scopus 로고
    • Scheduling manufacturing systems with work-in-process inventory control: Multiple-part-type systems
    • Bai S.X., Gershwin S.B. Scheduling manufacturing systems with work-in-process inventory control. Multiple-part-type systems International Journal of Production Research. 32(2):1994;365-385.
    • (1994) International Journal of Production Research , vol.32 , Issue.2 , pp. 365-385
    • Bai, S.X.1    Gershwin, S.B.2
  • 3
    • 0028436977 scopus 로고
    • Finite capacity flow control in a multi-stage/multi-product environment
    • Hillion H., Proth J.M. Finite capacity flow control in a multi-stage/multi-product environment. International Journal of Production Research. 32(5):1994;1119-1136.
    • (1994) International Journal of Production Research , vol.32 , Issue.5 , pp. 1119-1136
    • Hillion, H.1    Proth, J.M.2
  • 4
    • 0022109204 scopus 로고
    • Planning lot sizes and capacity requirements in a single stage production system
    • Gunther H.O. Planning lot sizes and capacity requirements in a single stage production system. European Journal of Operational Research. 31(1):1987;223-231.
    • (1987) European Journal of Operational Research , vol.31 , Issue.1 , pp. 223-231
    • Gunther, H.O.1
  • 5
    • 0027555416 scopus 로고
    • A heuristic algorithm for master production schedule generation with finite capacity and sequence dependant setups
    • Arosio M., Sianesi M. A heuristic algorithm for master production schedule generation with finite capacity and sequence dependant setups. International Journal of Production Research. 31(3):1993;531-553.
    • (1993) International Journal of Production Research , vol.31 , Issue.3 , pp. 531-553
    • Arosio, M.1    Sianesi, M.2
  • 6
    • 0001346852 scopus 로고    scopus 로고
    • Modeling the load problem in master production scheduling for MRP systems
    • Adenzo-Diaz B., Laguna M. Modeling the load problem in master production scheduling for MRP systems. International Journal of Production Research. 34(2):1996;483-493.
    • (1996) International Journal of Production Research , vol.34 , Issue.2 , pp. 483-493
    • Adenzo-Diaz, B.1    Laguna, M.2
  • 7
    • 0001554098 scopus 로고
    • A mathematical programming approach toward optimized master production scheduling
    • Chu Sidney C.K. A mathematical programming approach toward optimized master production scheduling. International Journal of Production Economics. 38(2-3):1995;269-279.
    • (1995) International Journal of Production Economics , vol.38 , Issue.23 , pp. 269-279
    • Chu Sidney, C.K.1
  • 8
    • 0343859224 scopus 로고
    • Process/product integrated planning in a manufacturing system: A linear programming model
    • Ciancimino A., Lari I., Valant C. Process/product integrated planning in a manufacturing system. A linear programming model European Journal of Operational Research. 61(1):1992;311-319.
    • (1992) European Journal of Operational Research , vol.61 , Issue.1 , pp. 311-319
    • Ciancimino, A.1    Lari, I.2    Valant, C.3
  • 11
    • 0041833818 scopus 로고
    • A balancing method for load adjustement according to seasonal production
    • IFAC/IFIP/IFORS, Vienna
    • J.-P. Campagne, A. Legait. A balancing method for load adjustement according to seasonal production, Intelligent Manufacturing Systems, IFAC/IFIP/IFORS, Vienna, 1994.
    • (1994) Intelligent Manufacturing Systems
    • Campagne, J.-P.1    Legait, A.2
  • 12
    • 0020832935 scopus 로고
    • Mathematical programming approaches to capacity-constrained MRP systems: Review, formulation and problem reduction
    • Billington P.J., McClain J.O., Thomas J.L. Mathematical programming approaches to capacity-constrained MRP systems. Review, formulation and problem reduction Management Science. 29(10):1983;1126-1141.
    • (1983) Management Science , vol.29 , Issue.10 , pp. 1126-1141
    • Billington, P.J.1    McClain, J.O.2    Thomas, J.L.3
  • 14
    • 0041333227 scopus 로고
    • Une nouvelle approche de calcul des besoins à capacité finie
    • France
    • J.-P. Campagne, A. Legait. Une nouvelle approche de calcul des besoins à capacité finie, Actes du congrès GSI4, France, 1993.
    • (1993) Actes du Congrès GSI4
    • Campagne, J.-P.1    Legait, A.2
  • 17
    • 0342553545 scopus 로고
    • Order release planning using variable lead times based on a backward simulation model
    • Watson E.F., Medeiros D.J., Sadowski R.P. Order release planning using variable lead times based on a backward simulation model. International Journal of Production Research. 33(10):1995;2867-2888.
    • (1995) International Journal of Production Research , vol.33 , Issue.10 , pp. 2867-2888
    • Watson, E.F.1    Medeiros, D.J.2    Sadowski, R.P.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.