-
1
-
-
4143106122
-
State of implementation of TPM in SMIs: A survey study in Malaysia
-
Ahmed, S., Hassan, M.H. and Taha, Z. (2004) 'State of implementation of TPM in SMIs: a survey study in Malaysia', Journal of Quality in Maintenance Engineering, Vol. 10, No. 2, pp.93-106.
-
(2004)
Journal of Quality in Maintenance Engineering
, vol.10
, Issue.2
, pp. 93-106
-
-
Ahmed, S.1
Hassan, M.H.2
Taha, Z.3
-
2
-
-
41149180896
-
An assessment of maintenance management initiatives in the Indian manufacturing industry
-
DOI 10.1504/IJTPM.2008.017664
-
Ahuja, I.P.S. and Khamba, J.S. (2008a) 'An assessment of maintenance management initiatives in the Indian manufacturing industry', Int. J. Technology, Policy and Management, Vol. 8, No. 3, pp.250-278. (Pubitemid 351434050)
-
(2008)
International Journal of Technology, Policy and Management
, vol.8
, Issue.3
, pp. 250-278
-
-
Ahuja, I.P.S.1
Khamba, J.S.2
-
3
-
-
40949128769
-
Total productive maintenance implementation in a manufacturing organisation
-
Ahuja, I.P.S. and Khamba, J.S. (2008b) 'Total productive maintenance implementation in a manufacturing organisation', Int. J. Productivity and Quality Management, Vol. 3, No. 3, pp.360-381.
-
(2008)
Int J. Productivity and Quality Management
, vol.3
, Issue.3
, pp. 360-381
-
-
Ahuja, I.P.S.1
Khamba, J.S.2
-
4
-
-
44849098073
-
Strategies and success factors for overcoming challenges in TPM implementation in Indian manufacturing industry
-
Ahuja, I.P.S. and Khamba, J.S. (2008c) 'Strategies and success factors for overcoming challenges in TPM implementation in Indian manufacturing industry', Journal of Quality in Maintenance Engineering, Vol. 14, No. 2, pp.123-147.
-
(2008)
Journal of Quality in Maintenance Engineering
, vol.14
, Issue.2
, pp. 123-147
-
-
Ahuja, I.P.S.1
Khamba, J.S.2
-
5
-
-
49149086860
-
Total productive maintenance: Literature review and directions
-
Ahuja, I.P.S. and Khamba, J.S. (2008d) 'Total productive maintenance: literature review and directions', Int. J. Quality and Reliability Management, Vol. 25, No. 7, pp.709-756.
-
(2008)
Int J. Quality and Reliability Management
, vol.25
, Issue.7
, pp. 709-756
-
-
Ahuja, I.P.S.1
Khamba, J.S.2
-
6
-
-
60549118171
-
Investigation of manufacturing performance achievements through strategic total productive maintenance initiatives
-
Ahuja, I.P.S. and Khamba, J.S. (2009) 'Investigation of manufacturing performance achievements through strategic total productive maintenance initiatives' Int. J. Productivity and Quality Management, Vol. 4, No. 2, pp.129-152.
-
(2009)
Int J. Productivity and Quality Management
, vol.4
, Issue.2
, pp. 129-152
-
-
Ahuja, I.P.S.1
Khamba, J.S.2
-
7
-
-
70249150079
-
A case study of total productive maintenance implementation at precision tube mills
-
Ahuja, I.P.S. and Kumar, P. (2009) 'A case study of total productive maintenance implementation at precision tube mills', Journal of Quality in Maintenance Engineering, Vol. 15, No. 3, pp.241-258.
-
(2009)
Journal of Quality in Maintenance Engineering
, vol.15
, Issue.3
, pp. 241-258
-
-
Ahuja, I.P.S.1
Kumar, P.2
-
8
-
-
41749119667
-
A methodology to enhance equipment performance using the OEE measure
-
DOI 10.1504/EJIE.2008.017690
-
Badiger, A.S., Gandhinathan, R. and Gaitonde, V.N. (2008) 'A methodology to enhance equipment performance using the OEE measure', European Journal of Industrial Engineering, Vol. 2, No. 3, pp.356-376. (Pubitemid 351486198)
-
(2008)
European Journal of Industrial Engineering
, vol.2
, Issue.3
, pp. 356-376
-
-
Badinger, A.1
Gandhinathan, R.2
Gaitonde, V.N.3
-
9
-
-
10444282169
-
Implementation of total productive maintenance: A case study
-
Chan, F.T.S., Lau, H.C.W., Ip, R.W.L., Chan, H.K. and Kong, S. (2005) 'Implementation of total productive maintenance: a case study', Int. J. Production Economics, Vol. 95, pp.71-94.
-
(2005)
Int J. Production Economics
, vol.95
, pp. 71-94
-
-
Chan, F.T.S.1
Lau, H.C.W.2
Ip, R.W.L.3
Chan, H.K.4
Kong, S.5
-
11
-
-
5044227167
-
Implementing total productive maintenance in Nigerian manufacturing industries
-
DOI 10.1016/j.apenergy.2004.01.007
-
Eti, M.C., Ogaji, S.O.T. and Probert, S.D. (2004) 'Implementing total productive maintenance in Nigerian manufacturing industries', Applied Energy, Vol. 79, pp.385-401. (Pubitemid 39338376)
-
(2004)
Applied Energy
, vol.79
, Issue.4
, pp. 385-401
-
-
Eti, M.C.1
Ogaji, S.O.T.2
Probert, S.D.3
-
12
-
-
33744509849
-
Managing commitment: increasing the odds for successful implementation of TQM, TPM or RCM
-
DOI 10.1108/02656710310500815
-
Hansson, J., Backlund, F. and Lycke, L. (2003) 'Managing commitment: increasing the odds for successful implementation of TQM, TPM or RCM', Int. J. Quality and Reliability Management, Vol. 20, No. 9, pp.993-1008. (Pubitemid 37422306)
-
(2003)
International Journal of Quality and Reliability Management
, vol.20
, Issue.9
, pp. 993-1008
-
-
Hansson, J.1
Backlund, F.2
Lycke, L.3
-
13
-
-
0034813753
-
A study of total productive maintenance implementation
-
DOI 10.1108/13552510110404495
-
Ireland, F. and Dale, B.G. (2001) 'A study of total productive maintenance implementation', Journal of Quality in Maintenance Engineering, Vol. 7, No. 3, pp.183-191. (Pubitemid 32914604)
-
(2001)
Journal of Quality in Maintenance Engineering
, vol.7
, Issue.3
, pp. 183-191
-
-
Ireland, F.1
Dale, B.G.2
-
14
-
-
39149139845
-
Total productive maintenance: Criteria for success
-
Ireland, F. and Dale, B.G. (2006) 'Total productive maintenance: criteria for success', Int. J. Productivity and Quality Management, Vol. 1, No. 3, pp.207-223.
-
(2006)
Int J. Productivity and Quality Management
, vol.1
, Issue.3
, pp. 207-223
-
-
Ireland, F.1
Dale, B.G.2
-
15
-
-
80053953955
-
Total productive maintenance experience: A case study
-
Khanna, V.K. (2008) 'Total productive maintenance experience: a case study', Int. J. Productivity and Quality Management, Vol. 3, No. 1, pp.12-32.
-
(2008)
Int J. Productivity and Quality Management
, vol.3
, Issue.1
, pp. 12-32
-
-
Khanna, V.K.1
-
16
-
-
0031651799
-
World-class maintenance using a computerized maintenance management system
-
Labib, A. (1998) 'World-class maintenance using a computerized maintenance management system', Journal of Quality in Maintenance Engineering, Vol. 4, No. 1, pp.66-75.
-
(1998)
Journal of Quality in Maintenance Engineering
, vol.4
, Issue.1
, pp. 66-75
-
-
Labib, A.1
-
17
-
-
0031383240
-
Statistical machine control: A practical approach to total productive maintenance of semiconductor equipment
-
Lavallart, F. (1997) 'Statistical machine control: a practical approach to total productive maintenance of semiconductor equipment', Electronics Manufacturing Technology Symposium, pp.81-87.
-
(1997)
Electronics Manufacturing Technology Symposium
, pp. 81-87
-
-
Lavallart, F.1
-
19
-
-
0001302858
-
TPM: Planned and autonomous maintenance: Bridging the gap between practice and research
-
Mckone, K.E. and Weiss, E.N. (1998) 'TPM: planned and autonomous maintenance: bridging the gap between practice and research', Production an Operations Management, Vol. 7, No. 4, pp.335-351.
-
(1998)
Production An Operations Management
, vol.7
, Issue.4
, pp. 335-351
-
-
McKone, K.E.1
Weiss, E.N.2
-
20
-
-
34250835157
-
An AHP model for quantification of benefits of World-class Maintenance Systems
-
DOI 10.1504/IJISE.2007.011926
-
Mishra, R.P., Anand, G. and Kodali, R., (2007) 'An AHP model for quantification of benefits of world-class maintenance systems', Int. J. Industrial and Systems Engineering, Vol. 2, No. 2, pp.166-194. (Pubitemid 46978849)
-
(2007)
International Journal of Industrial and Systems Engineering
, vol.2
, Issue.2
, pp. 166-194
-
-
Mishra, R.P.1
Anand, G.2
Kodali, R.3
-
21
-
-
37849009983
-
A SWOT analysis of total productive maintenance frameworks
-
Mishra, R.P., Anand, G. and Kodali, R, (2008) 'A SWOT analysis of total productive maintenance frameworks', Int. J. Management Practice, Vol. 3, No. 1, pp.51-81.
-
(2008)
Int J. Management Practice
, vol.3
, Issue.1
, pp. 51-81
-
-
Mishra, R.P.1
Anand, G.2
Kodali, R.3
-
24
-
-
40749149087
-
Sensitivity analysis of a preventive maintenance scheduling model
-
DOI 10.1504/IJISE.2008.017422
-
Oke, S.A., Oluleye, A.E., Oyawale, F.A. and Charles-Owaba, O.E. (2008) 'Sensitivity analysis of a preventive maintenance scheduling model', Int. J. Industrial and Systems Engineering, Vol. 3, No. 3, pp.298-323. (Pubitemid 351385703)
-
(2008)
International Journal of Industrial and Systems Engineering
, vol.3
, Issue.3
, pp. 298-323
-
-
Charles-Owaba, O.E.1
Oluleye, A.E.2
Oyawale, F.A.3
Oke, S.A.4
-
25
-
-
33745074659
-
Integrating TPM and QFD for improving quality in maintenance engineering
-
DOI 10.1108/13552510610667174
-
Pramod, V.R., Devadasan, S.R., Muthu, S., Jagathyraj, V.P. and Moorthy G.D. (2006) 'Integrating TPM and QFD for improving quality in maintenance engineering', Journal of Quality in Maintenance Engineering, Vol. 12, No. 2, pp.150-171. (Pubitemid 43883169)
-
(2006)
Journal of Quality in Maintenance Engineering
, vol.12
, Issue.2
, pp. 150-171
-
-
Pramod, V.R.1
Devadasan, S.R.2
Muthu, S.3
Jagathyraj, V.P.4
Moorthy, G.D.5
-
26
-
-
37849034872
-
MQFD and its receptivity analysis in an Indian electronic switches manufacturing company
-
Pramod, V.R., Devadasan, S.R., Raj, V.P.J. and Murugesh, R. (2008) 'MQFD and its receptivity analysis in an Indian electronic switches manufacturing company', Int. J. Management Practice, Vol. 3, No. 1, pp.82-95.
-
(2008)
Int J. Management Practice
, vol.3
, Issue.1
, pp. 82-95
-
-
Pramod, V.R.1
Devadasan, S.R.2
Raj, V.P.J.3
Murugesh, R.4
-
27
-
-
34447578641
-
Multicriteria decision making in maintenance quality function deployment through the analytical hierarchy process
-
DOI 10.1504/IJISE.2007.013189
-
Pramod, V.R., Sampath, K., Devadasan, S.R., Raj, V.P.J. and Moorthy, G.D. (2007) 'Multicriteria decision making in maintenance quality function deployment through the analytical hierarchy process', Int. J. Industrial and Systems Engineering, Vol. 2, No. 4, pp.454-478. (Pubitemid 47083113)
-
(2007)
International Journal of Industrial and Systems Engineering
, vol.2
, Issue.4
, pp. 454-478
-
-
Pramod, V.R.1
Sampath, K.2
Devadasan, S.R.3
Jagathy Raj, V.P.4
Dakshina Moorthy, G.5
-
28
-
-
44449118935
-
Generic approach for the customisation of the TPM programme: Using the process transformation model and reliability assessment tool
-
DOI 10.1504/EJIE.2008.018437
-
Rashid, M.M. and Ismail, H. (2008) 'Generic approach for the customisation of the TPM programme: using the process transformation model and reliability assessment tool', European Journal of Industrial Engineering, Vol. 2, No. 4, pp.401-427. (Pubitemid 351767066)
-
(2008)
European Journal of Industrial Engineering
, vol.2
, Issue.4
, pp. 401-427
-
-
Rashid, M.M.1
Ismail, H.2
-
29
-
-
33644598208
-
Manufacturing excellence through TPM implementation: A practical analysis
-
Sharma, K.R., Kumar, D. and Kumar, P. (2006) 'Manufacturing excellence through TPM implementation: a practical analysis', Industrial Management and Data Systems, Vol. 106, pp.256-280.
-
(2006)
Industrial Management and Data Systems
, vol.106
, pp. 256-280
-
-
Sharma, K.R.1
Kumar, D.2
Kumar, P.3
-
31
-
-
33746209248
-
Maintaining preventive maintenance and maintenance prevention: Analysing the dynamic implications of Total Productive Maintenance
-
DOI 10.1002/sdr.335
-
Thun, J-H. (2006) 'Maintaining preventive maintenance and maintenance prevention: analysing the dynamic implications of total productive maintenance', System Dynamics Review, Vol. 22, No. 2, Summer, pp.163-179. (Pubitemid 44088727)
-
(2006)
System Dynamics Review
, vol.22
, Issue.2
, pp. 163-179
-
-
Thun, J.-H.1
-
32
-
-
45849094059
-
Supporting total productive maintenance by mobile devices
-
Thun, J-H. (2008) 'Supporting total productive maintenance by mobile devices', Production Planning and Control, Vol. 19, No. 4, pp.430-434.
-
(2008)
Production Planning and Control
, vol.19
, Issue.4
, pp. 430-434
-
-
Thun, J.-H.1
-
34
-
-
33947206478
-
Implementation of total productive maintenance in food industry: A case study
-
DOI 10.1108/13552510710735087
-
Tsarouhas, P. (2007) 'Implementation of total productive maintenance in food industry: a case study', Journal of Quality in Maintenance Engineering, Vol. 13, No. 1, pp.5-18. (Pubitemid 46432519)
-
(2007)
Journal of Quality in Maintenance Engineering
, vol.13
, Issue.1
, pp. 5-18
-
-
Tsarouhas, P.1
-
35
-
-
0036449862
-
Total productive maintenance in a South African pulp and paper company: A case study
-
DOI 10.1108/09544780210447465
-
van der Wal, R.W.E. and Lynn, D. (2002) 'Total productive maintenance in a south African pulp and paper company-a case study', The TQM Magazine, Vol. 14, No. 6, pp.359-366. (Pubitemid 35443136)
-
(2002)
TQM Magazine
, vol.14
, Issue.6
, pp. 359-366
-
-
Van Der Wal, R.W.E.1
Lynn, D.2
-
36
-
-
33745349501
-
Evaluating the efficiency of implementing total productive maintenance
-
DOI 10.1080/14783360600588232, PII X2388637753
-
Wang, F-K. (2006) 'Evaluating the efficiency of implementing total productive maintenance', Total Quality Management, Vol. 17, No. 5, pp.655-667. (Pubitemid 43941147)
-
(2006)
Total Quality Management and Business Excellence
, vol.17
, Issue.5
, pp. 655-667
-
-
Wang, F.-K.1
|