메뉴 건너뛰기




Volumn 3, Issue 3, 2008, Pages 298-323

Sensitivity analysis of a preventive maintenance scheduling model

Author keywords

Gantt Charting; Maintenance; Maintenance cost; Maintenance scheduling; Operations; Sensitivity analysis; Shipping industry

Indexed keywords

MATHEMATICAL MODELS; OPERATING COSTS; SCHEDULING; SENSITIVITY ANALYSIS;

EID: 40749149087     PISSN: 17485037     EISSN: 17485045     Source Type: Journal    
DOI: 10.1504/IJISE.2008.017422     Document Type: Article
Times cited : (12)

References (18)
  • 1
    • 33947099918 scopus 로고    scopus 로고
    • An intelligent condition-based maintenance scheduling model
    • Baek, J.G. (2007) 'An intelligent condition-based maintenance scheduling model', International Journal of Quality and Reliability Management Vol. 24, No. 3, pp.312-327.
    • (2007) International Journal of Quality and Reliability Management , vol.24 , Issue.3 , pp. 312-327
    • Baek, J.G.1
  • 2
    • 0035546218 scopus 로고    scopus 로고
    • A genetic approach to the scheduling of preventive maintenance tasks on a single product manufacturing production line
    • Cavory, G., Dupas, R. and Goncalves, G. (2002) 'A genetic approach to the scheduling of preventive maintenance tasks on a single product manufacturing production line', International Journal of Production Economics, Vol. 74, Nos. 1-3, pp. 135-146.
    • (2002) International Journal of Production Economics , vol.74 , Issue.1-3 , pp. 135-146
    • Cavory, G.1    Dupas, R.2    Goncalves, G.3
  • 4
    • 33947162394 scopus 로고    scopus 로고
    • Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches
    • Dahal, K.P. and Chakpitak, N. (2007) 'Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches', Electric Power Systems Research, Vol. 77, No. 7, pp.771-779.
    • (2007) Electric Power Systems Research , vol.77 , Issue.7 , pp. 771-779
    • Dahal, K.P.1    Chakpitak, N.2
  • 5
    • 33846381038 scopus 로고    scopus 로고
    • Machine scheduling performance with maintenance and failure
    • Guo, Y., Lim, A., Rodrigues, B. and Yu, S. (2007) 'Machine scheduling performance with maintenance and failure', Mathematical and Computer Modelling, Vol. 45, Nos. 9/10, pp.1067-1080.
    • (2007) Mathematical and Computer Modelling , vol.45 , Issue.9-10 , pp. 1067-1080
    • Guo, Y.1    Lim, A.2    Rodrigues, B.3    Yu, S.4
  • 6
    • 33749681702 scopus 로고    scopus 로고
    • Single-machine scheduling with periodic maintenance to minimize makespan
    • Ji, M., He, Y. and Cheng, T.C.E. (2007) 'Single-machine scheduling with periodic maintenance to minimize makespan', Computers and Operations Research, Vol. 34, No. 6, pp. 1764-1770.
    • (2007) Computers and Operations Research , vol.34 , Issue.6 , pp. 1764-1770
    • Ji, M.1    He, Y.2    Cheng, T.C.E.3
  • 7
    • 40749102685 scopus 로고    scopus 로고
    • Safety and reliability optimisation of captive power plants using intelligent maintenance scheduling
    • Mohanta, D.K., Sadhu, K.P. and Chakrabarti, R. (2006) 'Safety and reliability optimisation of captive power plants using intelligent maintenance scheduling', International Journal of Reliability and Safety, Vol. 1, Nos. 1/2, pp. 155-167.
    • (2006) International Journal of Reliability and Safety , vol.1 , Issue.1-2 , pp. 155-167
    • Mohanta, D.K.1    Sadhu, K.P.2    Chakrabarti, R.3
  • 8
    • 33746924022 scopus 로고    scopus 로고
    • Due-date assignment and maintenance activity scheduling problem
    • Mosheiov, G. and Oron, D. (2006) 'Due-date assignment and maintenance activity scheduling problem', Mathematical and Computer Modelling, Vol. 44, Nos. 11/12, pp. 1053-1057.
    • (2006) Mathematical and Computer Modelling , vol.44 , Issue.11-12 , pp. 1053-1057
    • Mosheiov, G.1    Oron, D.2
  • 9
    • 31144443602 scopus 로고    scopus 로고
    • Maintenance scheduling: Description, status, and future directions
    • Oke, S.A. (2004) 'Maintenance scheduling: Description, status, and future directions', South African Journal of Industrial Engineering Vol. 15, No. 1, pp.101-117.
    • (2004) South African Journal of Industrial Engineering , vol.15 , Issue.1 , pp. 101-117
    • Oke, S.A.1
  • 11
    • 31144460304 scopus 로고    scopus 로고
    • A sensitivity analysis of an optimal Gantt charting maintenance scheduling model
    • Emerald, UK
    • Oke, S.A. and Charles-Owaba, O.E. (2006a) 'A sensitivity analysis of an optimal Gantt charting maintenance scheduling model', International Journal of Quality and Reliability Management, Emerald, UK, Vol. 23, No. 2, pp.197-229.
    • (2006) International Journal of Quality and Reliability Management , vol.23 , Issue.2 , pp. 197-229
    • Oke, S.A.1    Charles-Owaba, O.E.2
  • 12
    • 33646348744 scopus 로고    scopus 로고
    • Application of fuzzy logic control model to Gantt charting preventive maintenance scheduling
    • Emerald, UK
    • Oke, S.A. and Charles-Owaba, O.E. (2006b) 'Application of fuzzy logic control model to Gantt charting preventive maintenance scheduling', International Journal of Quality and Reliability Management, Emerald, UK, Vol. 23, No. 4, pp.441-459.
    • (2006) International Journal of Quality and Reliability Management , vol.23 , Issue.4 , pp. 441-459
    • Oke, S.A.1    Charles-Owaba, O.E.2
  • 13
    • 33751164384 scopus 로고    scopus 로고
    • A note on worst-case performance of heuristics for maintenance scheduling problems
    • Qi, X. (2007) 'A note on worst-case performance of heuristics for maintenance scheduling problems', Discrete Applied Mathematics, Vol. 155, No. 3, pp.416-422.
    • (2007) Discrete Applied Mathematics , vol.155 , Issue.3 , pp. 416-422
    • Qi, X.1
  • 14
    • 33750731956 scopus 로고    scopus 로고
    • Searching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithms
    • Quan, G., Greenwood, G.W., Liu, D. and Hu, S. (2007) 'Searching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithms', European Journal of Operational Research, Vol. 177, No. 3, pp.1969-1984.
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 1969-1984
    • Quan, G.1    Greenwood, G.W.2    Liu, D.3    Hu, S.4
  • 15
    • 33947227221 scopus 로고    scopus 로고
    • Genetic algorithms for total weighted expected tardiness integrated preventive maintenance planning and production scheduling for a single machine
    • Sortrakul, N.C. and Cassady, R. (2007) 'Genetic algorithms for total weighted expected tardiness integrated preventive maintenance planning and production scheduling for a single machine', Journal of Quality in Maintenance Engineering, Vol. 13, No. 1, pp.49-61.
    • (2007) Journal of Quality in Maintenance Engineering , vol.13 , Issue.1 , pp. 49-61
    • Sortrakul, N.C.1    Cassady, R.2
  • 16
    • 33750521911 scopus 로고    scopus 로고
    • A sequential approach for gas turbine power plant preventative maintenance scheduling
    • Zhao, Y., Volovoi, V., Waters, M. and Mavris, D. (2006) 'A sequential approach for gas turbine power plant preventative maintenance scheduling', Journal of Engineering for Gas Turbines and Power, Vol. 128, No. 4, pp.796-805.
    • (2006) Journal of Engineering for Gas Turbines and Power , vol.128 , Issue.4 , pp. 796-805
    • Zhao, Y.1    Volovoi, V.2    Waters, M.3    Mavris, D.4
  • 18
    • 33845605765 scopus 로고    scopus 로고
    • Reliability-centered predictive maintenance scheduling for a continuously monitored system subject to degradation
    • Zhou, X., Xi, L. and Lee, J. (2007) 'Reliability-centered predictive maintenance scheduling for a continuously monitored system subject to degradation', Reliability Engineering and System Safety, Vol. 92, No. 4, pp.530-534.
    • (2007) Reliability Engineering and System Safety , vol.92 , Issue.4 , pp. 530-534
    • Zhou, X.1    Xi, L.2    Lee, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.