Volumn 26, Issue 4, 2011, Pages 2171-2179

A reliability-centered approach to an optimal maintenance strategy in transmission systems using a genetic algorithm

Author keywords

Equipment state model; genetic algorithm (GA); modified semi Markov chain; reliability centered maintenance (RCM)

Indexed keywords

ELECTRIC FACILITIES; ELECTRICITY SUPPLY; EQUIPMENT STATE MODELS; EXPECTED COSTS; IEEE 118-BUS SYSTEM; LARGE CLASS; MAINTENANCE COST; MAINTENANCE SCENARIO; MAINTENANCE STRATEGIES; MODIFIED SEMI-MARKOV CHAINS; OPERATION COST; OPTIMAL MAINTENANCE; RELIABILITY-CENTERED MAINTENANCE; TRANSMISSION SYSTEMS;

EID: 80054085998     PISSN: 08858977     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRD.2011.2162752     Document Type: Article
Times cited : (89)

References (17)
  • 1
    • 0032058105 scopus 로고    scopus 로고
    • Reliability centered maintenance
    • PII S0951832097000926
    • M. Rausand, "Reliability centered maintenance," Rel. Eng. Syst. Safety, vol. 60, pp. 121-132, 1998. (Pubitemid 128639474)
    • (1998) Reliability Engineering and System Safety , vol.60 , Issue.2 , pp. 121-132
    • Rausand, M.1
  • 2
    • 0033117170 scopus 로고    scopus 로고
    • Joint redundancy and maintenance optimization for multistate series-parallel systems
    • Apr.
    • G. Levitin and A. Lisnianski, "Joint redundancy and maintenance optimization for multistate series-parallel systems," Rel. Eng. Syst. Safety, vol. 64, no. 1, Apr. 1999.
    • (1999) Rel. Eng. Syst. Safety , vol.64 , Issue.1
    • Levitin, G.1    Lisnianski, A.2
  • 3
    • 22444449190 scopus 로고    scopus 로고
    • Optimal maintenance policies under different operational schedules
    • DOI 10.1109/TR.2005.847255
    • S. D.Wu and Clements-Croome, "Optimal maintenance policies under different operational schedules," IEEE Trans. Rel., vol. 54, no. 2, pp. 338-346, Jun. 2005. (Pubitemid 41005036)
    • (2005) IEEE Transactions on Reliability , vol.54 , Issue.2 , pp. 338-346
    • Wu, S.1    Clements-Croome, D.2
  • 4
    • 0035007693 scopus 로고    scopus 로고
    • Reliability centered maintenance and risk assessment
    • Jan.
    • B. S. Hauge and D. C. Johnston, "Reliability centered maintenance and risk assessment," in Proc. Annu. Rel. Maintain. Symp., Jan. 2001, pp. 22-25.
    • (2001) Proc. Annu. Rel. Maintain. Symp. , pp. 22-25
    • Hauge, B.S.1    Johnston, D.C.2
  • 6
    • 0021422665 scopus 로고
    • Generation unit maintenance scheduling for single and interconnected systems
    • F. A. El-Sheikhi and R. Billinton, "Generation unit maintenance scheduling for single and interconnected systems," IEEE Trans. Power App. Syst., vol. PAS-103, no. 5, pp. 1038-1044, May 1984. (Pubitemid 14568672)
    • (1984) IEEE transactions on power apparatus and systems , vol.PAS-103 , Issue.5 , pp. 1038-1044
    • El-Sheikhi, F.A.1    Billinton, R.2
  • 7
    • 0034186789 scopus 로고    scopus 로고
    • Generation maintenance scheduling considering transmission constraints
    • May
    • E. L. da Silva, M. T. Schilling, and M. C. Rafael, "Generation maintenance scheduling considering transmission constraints," IEEE Trans. Power Syst., vol. 15, no. 2, pp. 838-843, May 2000.
    • (2000) IEEE Trans. Power Syst. , vol.15 , Issue.2 , pp. 838-843
    • Da Silva, E.L.1    Schilling, M.T.2    Rafael, M.C.3
  • 8
    • 0037505489 scopus 로고    scopus 로고
    • Maintenance scheduling of generation and transmission systems using fuzzy evolutionary programming
    • May
    • M. Y. El-Sharkh and A. A. El-Keib, "Maintenance scheduling of generation and transmission systems using fuzzy evolutionary programming," IEEE Trans. Power Syst., vol. 18, no. 2, pp. 862-866, May 2003.
    • (2003) IEEE Trans. Power Syst. , vol.18 , Issue.2 , pp. 862-866
    • El-Sharkh, M.Y.1    El-Keib, A.A.2
  • 9
    • 34548036523 scopus 로고    scopus 로고
    • Security-constrained optimal coordination of generation and transmission maintenance outage scheduling
    • DOI 10.1109/TPWRS.2007.901673
    • Y. Fu, M. Shahidehpour, and Z. Li, "Security-constrained optimal coordination of generation and transmission maintenance outage scheduling," IEEE Trans. Power Syst., vol. 22, no. 3, pp. 1302-1313, Aug. 2007. (Pubitemid 47278390)
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.3 , pp. 1302-1313
    • Fu, Y.1    Shahidehpour, M.2    Li, Z.3
  • 10
    • 0031121412 scopus 로고    scopus 로고
    • Reliability centered maintenance for transmission systems
    • M. E. Beehler, "Reliability centered maintenance for transmission systems," IEEE Trans. Power Del., vol. 12, no. 2, pp. 1023-1028, Apr. 1997. (Pubitemid 127762408)
    • (1997) IEEE Transactions on Power Delivery , vol.12 , Issue.2 , pp. 1023-1028
    • Beehler, M.E.1
  • 11
    • 0346076729 scopus 로고    scopus 로고
    • A reliability based approach to transmission maintenance planning and its application in BC hydro system
    • Jan.
    • W. Li and J. Korczynski, "A reliability based approach to transmission maintenance planning and its application in BC hydro system," IEEE Trans. Power Del., vol. 19, no. 1, pp. 303-308, Jan. 2004.
    • (2004) IEEE Trans. Power Del. , vol.19 , Issue.1 , pp. 303-308
    • Li, W.1    Korczynski, J.2
  • 13
    • 0242419890 scopus 로고    scopus 로고
    • Seoul Korea: Doo Yang Sa
    • B. R. Moon, Genetic Algorithm. Seoul, Korea: Doo Yang Sa, 2005, pp. 2-68.
    • (2005) Genetic Algorithm , pp. 2-68
    • Moon, B.R.1
  • 15
    • 78649540755 scopus 로고    scopus 로고
    • Maximizing power system loadability by optimal allocation of SVC using mixed integer linear programming
    • Minneapolis, MN
    • R. W. Chang and T. K. Saha, "Maximizing power system loadability by optimal allocation of SVC using mixed integer linear programming," presented at the Power Energy Soc. Gen. Meeting, Minneapolis, MN, 2010.
    • (2010) Power Energy Soc. Gen. Meeting
    • Chang, R.W.1    Saha, T.K.2
  • 16
    • 39949084313 scopus 로고    scopus 로고
    • Evaluation of available transfer capability using fuzzy multi-objective contingency-constrained optimal power flow
    • May
    • T. K. Hahn, M. K. Kim, D. Hur, J.-K. Park, and Y. T. Yoon, "Evaluation of available transfer capability using fuzzy multi-objective contingency-constrained optimal power flow," Elect. Power Syst. Res., vol. 78, no. 5, pp. 873-882, May 2008.
    • (2008) Elect. Power Syst. Res. , vol.78 , Issue.5 , pp. 873-882
    • Hahn, T.K.1    Kim, M.K.2    Hur, D.3    Park, J.-K.4    Yoon, Y.T.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.