메뉴 건너뛰기




Volumn 19, Issue 1, 2004, Pages 303-308

A Reliability-Based Approach to Transmission Maintenance Planning and Its Application in BC Hydro System

Author keywords

Reliability centered maintenance; Transmission maintenance; Transmission planned outage; Transmission reliability

Indexed keywords

COMPUTER SIMULATION; DEREGULATION; ELECTRIC LOADS; MONTE CARLO METHODS; OPTIMIZATION; OUTAGES; PREVENTIVE MAINTENANCE; RELIABILITY; RISK ASSESSMENT;

EID: 0346076729     PISSN: 08858977     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRD.2003.820183     Document Type: Article
Times cited : (69)

References (14)
  • 1
    • 0021422665 scopus 로고
    • Generation unit maintenance scheduling for single and interconnected systems
    • May
    • F. A. El-Sheikhi and R. Billinton, "Generation unit maintenance scheduling for single and interconnected systems," IEEE Trans. Power App. Syst., vol. PAS-103, pp. 1038-1044, May 1984.
    • (1984) IEEE Trans. Power App. Syst. , vol.PAS-103 , pp. 1038-1044
    • El-Sheikhi, F.A.1    Billinton, R.2
  • 2
    • 0026203507 scopus 로고
    • Optimal generating unit scheduling for multi-area system with network constrains
    • Aug.
    • L. Chen and J. Toyoda, "Optimal generating unit scheduling for multi-area system with network constrains," IEEE Trans. Power Syst., vol. 6, pp. 1168-1174, Aug. 1991.
    • (1991) IEEE Trans. Power Syst. , vol.6 , pp. 1168-1174
    • Chen, L.1    Toyoda, J.2
  • 3
    • 0026155671 scopus 로고
    • Power plant maintenance scheduling: Optimizing economics and reliability
    • May
    • R. Mukerji and J. H. Parker, "Power plant maintenance scheduling: Optimizing economics and reliability," IEEE Trans. Power Syst., vol. 6, pp. 476-483, May 1991.
    • (1991) IEEE Trans. Power Syst. , vol.6 , pp. 476-483
    • Mukerji, R.1    Parker, J.H.2
  • 4
    • 0026868528 scopus 로고
    • A decomposition approach to unit maintenance scheduling
    • May
    • J. Yellen et al., "A decomposition approach to unit maintenance scheduling," IEEE Trans. Power Syst., vol. 7, pp. 726-733, May 1992.
    • (1992) IEEE Trans. Power Syst. , vol.7 , pp. 726-733
    • Yellen, J.1
  • 5
    • 0032204113 scopus 로고    scopus 로고
    • A practical maintenance scheduling program: Mathematical model and case study
    • Nov.
    • D. Chattopadhyay, "A practical maintenance scheduling program: Mathematical model and case study," IEEE Trans. Power Syst., vol. 13, pp. 1475-1480, Nov. 1998.
    • (1998) IEEE Trans. Power Syst. , vol.13 , pp. 1475-1480
    • Chattopadhyay, D.1
  • 6
    • 0034186789 scopus 로고    scopus 로고
    • Generation maintenance scheduling considering transmission constraints
    • May
    • E. L. De Silva et al., "Generation maintenance scheduling considering transmission constraints," IEEE Trans. Power Syst., vol. 15, pp. 838-843, May 2000.
    • (2000) IEEE Trans. Power Syst. , vol.15 , pp. 838-843
    • De Silva, E.L.1
  • 7
    • 0013431382 scopus 로고    scopus 로고
    • Maintenance consideration in applied substation reliability assessment
    • Vancouver, BC, Canada, Sept. 21-25
    • G. Nourbakhsh and G. Stapleton, "Maintenance consideration in applied substation reliability assessment," in Proc. 5th Int. Conf. Probabilistic Method Appl. to Power Syst., Vancouver, BC, Canada, Sept. 21-25, 1997, pp. 391-395.
    • (1997) Proc. 5th Int. Conf. Probabilistic Method Appl. to Power Syst. , pp. 391-395
    • Nourbakhsh, G.1    Stapleton, G.2
  • 8
    • 0013421723 scopus 로고    scopus 로고
    • Assessment of maintenance policies for transformer tap changers - An application of the maintenance planning advisor (AMP) program
    • Vancouver, BC, Canada, Sept. 21-25
    • G. J. Anders et al., "Assessment of maintenance policies for transformer tap changers - an application of the maintenance planning advisor (AMP) program," in Proc. 5th Int. Conf. Probabilistic Method Appl to Power Syst., Vancouver, BC, Canada, Sept. 21-25, 1997, pp. 397-401.
    • (1997) Proc. 5th Int. Conf. Probabilistic Method Appl to Power Syst. , pp. 397-401
    • Anders, G.J.1
  • 9
    • 0031121412 scopus 로고    scopus 로고
    • Reliability centered maintenance for transmission systems
    • Apr.
    • M. E. Beehler, "Reliability centered maintenance for transmission systems," IEEE Trans. Power Delivery, vol. 12, pp. 1023-1028, Apr. 1997.
    • (1997) IEEE Trans. Power Delivery , vol.12 , pp. 1023-1028
    • Beehler, M.E.1
  • 11
    • 0026154722 scopus 로고
    • A hybrid approach for reliability evaluation of composite generation and transmission systems using monte carlo simulation and enumeration techniques
    • May
    • _, "A hybrid approach for reliability evaluation of composite generation and transmission systems using monte carlo simulation and enumeration techniques," Proc. Inst. Elect. Eng. C, vol. 138, no. 3, pp. 233-241, May 1991.
    • (1991) Proc. Inst. Elect. Eng. C , vol.138 , Issue.3 , pp. 233-241
  • 12
    • 0029306711 scopus 로고
    • Applications of transmission reliability assessment in probabilistic planning of BC hydro Vancouver south system
    • May
    • W. Li, Y. Mansour, J. K. Korczynski, and B. J. Mills, "Applications of transmission reliability assessment in probabilistic planning of BC hydro Vancouver south system," IEEE Trans. Power Syst., vol. 10, pp. 946-970, May 1995.
    • (1995) IEEE Trans. Power Syst. , vol.10 , pp. 946-970
    • Li, W.1    Mansour, Y.2    Korczynski, J.K.3    Mills, B.J.4
  • 13
    • 0032204987 scopus 로고    scopus 로고
    • Incorporation of voltage stability operation limits in composite system adequacy assessment: BC hydro's experience
    • Nov.
    • W. Li, Y. Mansour, E. Vaahedi, and D. N. Pettet, "Incorporation of voltage stability operation limits in composite system adequacy assessment: BC hydro's experience," IEEE Trans. Power Syst., vol. 13, pp. 1279-1284, Nov. 1998.
    • (1998) IEEE Trans. Power Syst. , vol.13 , pp. 1279-1284
    • Li, W.1    Mansour, Y.2    Vaahedi, E.3    Pettet, D.N.4
  • 14
    • 0032641692 scopus 로고    scopus 로고
    • Determining number and timing of substation spare transformers using a probabilistic cost analysis approach
    • July
    • W. Li, E. Vaahedi, and Y. Monsour, "Determining number and timing of substation spare transformers using a probabilistic cost analysis approach," IEEE Trans. Power Delivery, vol. 14, pp. 934-939, July 1999.
    • (1999) IEEE Trans. Power Delivery , vol.14 , pp. 934-939
    • Li, W.1    Vaahedi, E.2    Monsour, Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.