1
-
-
0021422665
-
Generation unit maintenance scheduling for single and interconnected systems
-
May
-
F. A. El-Sheikhi and R. Billinton, "Generation unit maintenance scheduling for single and interconnected systems," IEEE Trans. Power App. Syst., vol. PAS-103, pp. 1038-1044, May 1984.
-
(1984)
IEEE Trans. Power App. Syst.
, vol.PAS-103
, pp. 1038-1044
-
-
El-Sheikhi, F.A.1
Billinton, R.2
-
2
-
-
0026203507
-
Optimal generating unit scheduling for multi-area system with network constrains
-
Aug.
-
L. Chen and J. Toyoda, "Optimal generating unit scheduling for multi-area system with network constrains," IEEE Trans. Power Syst., vol. 6, pp. 1168-1174, Aug. 1991.
-
(1991)
IEEE Trans. Power Syst.
, vol.6
, pp. 1168-1174
-
-
Chen, L.1
Toyoda, J.2
-
3
-
-
0026155671
-
Power plant maintenance scheduling: Optimizing economics and reliability
-
May
-
R. Mukerji and J. H. Parker, "Power plant maintenance scheduling: Optimizing economics and reliability," IEEE Trans. Power Syst., vol. 6, pp. 476-483, May 1991.
-
(1991)
IEEE Trans. Power Syst.
, vol.6
, pp. 476-483
-
-
Mukerji, R.1
Parker, J.H.2
-
4
-
-
0026868528
-
A decomposition approach to unit maintenance scheduling
-
May
-
J. Yellen et al., "A decomposition approach to unit maintenance scheduling," IEEE Trans. Power Syst., vol. 7, pp. 726-733, May 1992.
-
(1992)
IEEE Trans. Power Syst.
, vol.7
, pp. 726-733
-
-
Yellen, J.1
-
5
-
-
0032204113
-
A practical maintenance scheduling program: Mathematical model and case study
-
Nov.
-
D. Chattopadhyay, "A practical maintenance scheduling program: Mathematical model and case study," IEEE Trans. Power Syst., vol. 13, pp. 1475-1480, Nov. 1998.
-
(1998)
IEEE Trans. Power Syst.
, vol.13
, pp. 1475-1480
-
-
Chattopadhyay, D.1
-
6
-
-
0034186789
-
Generation maintenance scheduling considering transmission constraints
-
May
-
E. L. De Silva et al., "Generation maintenance scheduling considering transmission constraints," IEEE Trans. Power Syst., vol. 15, pp. 838-843, May 2000.
-
(2000)
IEEE Trans. Power Syst.
, vol.15
, pp. 838-843
-
-
De Silva, E.L.1
-
7
-
-
0013431382
-
Maintenance consideration in applied substation reliability assessment
-
Vancouver, BC, Canada, Sept. 21-25
-
G. Nourbakhsh and G. Stapleton, "Maintenance consideration in applied substation reliability assessment," in Proc. 5th Int. Conf. Probabilistic Method Appl. to Power Syst., Vancouver, BC, Canada, Sept. 21-25, 1997, pp. 391-395.
-
(1997)
Proc. 5th Int. Conf. Probabilistic Method Appl. to Power Syst.
, pp. 391-395
-
-
Nourbakhsh, G.1
Stapleton, G.2
-
8
-
-
0013421723
-
Assessment of maintenance policies for transformer tap changers - An application of the maintenance planning advisor (AMP) program
-
Vancouver, BC, Canada, Sept. 21-25
-
G. J. Anders et al., "Assessment of maintenance policies for transformer tap changers - an application of the maintenance planning advisor (AMP) program," in Proc. 5th Int. Conf. Probabilistic Method Appl to Power Syst., Vancouver, BC, Canada, Sept. 21-25, 1997, pp. 397-401.
-
(1997)
Proc. 5th Int. Conf. Probabilistic Method Appl to Power Syst.
, pp. 397-401
-
-
Anders, G.J.1
-
9
-
-
0031121412
-
Reliability centered maintenance for transmission systems
-
Apr.
-
M. E. Beehler, "Reliability centered maintenance for transmission systems," IEEE Trans. Power Delivery, vol. 12, pp. 1023-1028, Apr. 1997.
-
(1997)
IEEE Trans. Power Delivery
, vol.12
, pp. 1023-1028
-
-
Beehler, M.E.1
-
11
-
-
0026154722
-
A hybrid approach for reliability evaluation of composite generation and transmission systems using monte carlo simulation and enumeration techniques
-
May
-
_, "A hybrid approach for reliability evaluation of composite generation and transmission systems using monte carlo simulation and enumeration techniques," Proc. Inst. Elect. Eng. C, vol. 138, no. 3, pp. 233-241, May 1991.
-
(1991)
Proc. Inst. Elect. Eng. C
, vol.138
, Issue.3
, pp. 233-241
-
-
-
12
-
-
0029306711
-
Applications of transmission reliability assessment in probabilistic planning of BC hydro Vancouver south system
-
May
-
W. Li, Y. Mansour, J. K. Korczynski, and B. J. Mills, "Applications of transmission reliability assessment in probabilistic planning of BC hydro Vancouver south system," IEEE Trans. Power Syst., vol. 10, pp. 946-970, May 1995.
-
(1995)
IEEE Trans. Power Syst.
, vol.10
, pp. 946-970
-
-
Li, W.1
Mansour, Y.2
Korczynski, J.K.3
Mills, B.J.4
-
13
-
-
0032204987
-
Incorporation of voltage stability operation limits in composite system adequacy assessment: BC hydro's experience
-
Nov.
-
W. Li, Y. Mansour, E. Vaahedi, and D. N. Pettet, "Incorporation of voltage stability operation limits in composite system adequacy assessment: BC hydro's experience," IEEE Trans. Power Syst., vol. 13, pp. 1279-1284, Nov. 1998.
-
(1998)
IEEE Trans. Power Syst.
, vol.13
, pp. 1279-1284
-
-
Li, W.1
Mansour, Y.2
Vaahedi, E.3
Pettet, D.N.4
-
14
-
-
0032641692
-
Determining number and timing of substation spare transformers using a probabilistic cost analysis approach
-
July
-
W. Li, E. Vaahedi, and Y. Monsour, "Determining number and timing of substation spare transformers using a probabilistic cost analysis approach," IEEE Trans. Power Delivery, vol. 14, pp. 934-939, July 1999.
-
(1999)
IEEE Trans. Power Delivery
, vol.14
, pp. 934-939
-
-
Li, W.1
Vaahedi, E.2
Monsour, Y.3
|