-
1
-
-
77955687856
-
Requirements for building information modeling based lean production management systems for construction
-
R. Sacks, M. Radosavljevic, and R. Barak Requirements for building information modeling based lean production management systems for construction Automation in Construction 19 5 2010 641 655
-
(2010)
Automation in Construction
, vol.19
, Issue.5
, pp. 641-655
-
-
Sacks, R.1
Radosavljevic, M.2
Barak, R.3
-
2
-
-
77956320668
-
Assessment of direct work utilization at the workface in the U.S. construction industry (1972-2008)
-
ASCE Banff, Canada
-
J. Gong, J.D. Borcherding, and C.H. Caldas Assessment of direct work utilization at the workface in the U.S. construction industry (1972-2008) Construction Research Congress 2010 2 2010 ASCE Banff, Canada 960 969
-
(2010)
Construction Research Congress 2010
, vol.2
, pp. 960-969
-
-
Gong, J.1
Borcherding, J.D.2
Caldas, C.H.3
-
6
-
-
0033703954
-
Ladars for construction assessment and update
-
G.S. Cheok, W.C. Stone, R.R. Lipman, and C. Witzgall Ladars for construction assessment and update Automation in Construction 9 5-6 2000 463 477
-
(2000)
Automation in Construction
, vol.9
, Issue.56
, pp. 463-477
-
-
Cheok, G.S.1
Stone, W.C.2
Lipman, R.R.3
Witzgall, C.4
-
7
-
-
70350064472
-
Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control
-
F. Bosche, C.T. Haas, and B. Akinci Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control ASCE Journal of Computing in Civil Engineering 23 6 2009 311 318
-
(2009)
ASCE Journal of Computing in Civil Engineering
, vol.23
, Issue.6
, pp. 311-318
-
-
Bosche, F.1
Haas, C.T.2
Akinci, B.3
-
8
-
-
70350060197
-
Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapse photographs
-
M. Golparvar-Fard, F. Pena-Mora, C.A. Arboleda, and S.H. Lee Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapse photographs ASCE Journal of Computing in Civil Engineering 23 6 2009 391 404
-
(2009)
ASCE Journal of Computing in Civil Engineering
, vol.23
, Issue.6
, pp. 391-404
-
-
Golparvar-Fard, M.1
Pena-Mora, F.2
Arboleda, C.A.3
Lee, S.H.4
-
10
-
-
33845966046
-
Research in automated measurement of project performance indicators
-
DOI 10.1016/j.autcon.2006.03.003, PII S0926580506000136
-
R. Navon Research in automated measurement of project performance indicators Automation in Construction 16 2007 176 188 (Pubitemid 46053760)
-
(2007)
Automation in Construction
, vol.16
, Issue.2
, pp. 176-188
-
-
Navon, R.1
-
11
-
-
34250683114
-
Using hue, saturation, and value color space for hydraulic excavator idle time analysis
-
J. Zou, and H. Kim Using hue, saturation, and value color space for hydraulic excavator idle time analysis Journal of Computing in Civil Engineering 21 2007 238
-
(2007)
Journal of Computing in Civil Engineering
, vol.21
, pp. 238
-
-
Zou, J.1
Kim, H.2
-
13
-
-
0004011301
-
-
PhD Thesis, Dept. of Civil Engineering, University of Birmingham, Birmingham, U.K.
-
G. Ballard, The Last Planner System of Production Control, PhD Thesis, Dept. of Civil Engineering, University of Birmingham, Birmingham, U.K., 2000.
-
(2000)
The Last Planner System of Production Control
-
-
Ballard, G.1
-
14
-
-
77956328382
-
Defining high-level project control data for visual information systems
-
ASCE Banff, Canada
-
N. Lee, and E.M. Rojas Defining high-level project control data for visual information systems Construction Research Congress 2010 1 2010 ASCE Banff, Canada 518 527
-
(2010)
Construction Research Congress 2010
, vol.1
, pp. 518-527
-
-
Lee, N.1
Rojas, E.M.2
-
15
-
-
0043275940
-
Linking time-lapse digital photography and dynamic scheduling of construction operations
-
J. Abeid, and D. Arditi Linking time-lapse digital photography and dynamic scheduling of construction operations Journal of Computing in Civil Engineering 16 2002 269
-
(2002)
Journal of Computing in Civil Engineering
, vol.16
, pp. 269
-
-
Abeid, J.1
Arditi, D.2
-
22
-
-
69949090406
-
Development of human pose analyzing algorithms for the determination of construction productivity in real-time
-
ASCE Seattle, WA
-
A. Peddi, L. Huan, Y. Bai, and S. Kim Development of human pose analyzing algorithms for the determination of construction productivity in real-time Construction Research Congress 2009 1 2009 ASCE Seattle, WA 11 20
-
(2009)
Construction Research Congress 2009
, vol.1
, pp. 11-20
-
-
Peddi, A.1
Huan, L.2
Bai, Y.3
Kim, S.4
-
23
-
-
77956322648
-
2D vision tracking methods' performance comparison for 3D tracking of construction resources
-
Banff, Canada
-
A. Makhmalbaf, M.-W. Park, J. Yang, I. Brilakis, and P.A. Vela 2D vision tracking methods' performance comparison for 3D tracking of construction resources Construction Research Congress 2010 1 2010 459 469 Banff, Canada
-
(2010)
Construction Research Congress 2010
, vol.1
, pp. 459-469
-
-
Makhmalbaf, A.1
Park, M.-W.2
Yang, J.3
Brilakis, I.4
Vela, P.A.5
-
25
-
-
77956335369
-
Automated Multiple Objects Tracking System (AMOTS)
-
ASCE Banff, Canada
-
T.I.P. Weerasinghe, and J.Y. Ruwanpura Automated Multiple Objects Tracking System (AMOTS) Construction Research Congress 1 2010 ASCE Banff, Canada 11 20
-
(2010)
Construction Research Congress
, vol.1
, pp. 11-20
-
-
Weerasinghe, T.I.P.1
Ruwanpura, J.Y.2
-
26
-
-
33847222202
-
Assessing research issues in automated project performance control (APPC)
-
R. Navon, and R. Sacks Assessing research issues in automated project performance control (APPC) Automation in Construction 16 4 2007 474 484
-
(2007)
Automation in Construction
, vol.16
, Issue.4
, pp. 474-484
-
-
Navon, R.1
Sacks, R.2
-
27
-
-
70249138274
-
Workforce tracking on construction sites using video cameras
-
J. Teizer, and P.A. Vela Workforce tracking on construction sites using video cameras Advanced Engineering Informatics 23 4 2009 452 462
-
(2009)
Advanced Engineering Informatics
, vol.23
, Issue.4
, pp. 452-462
-
-
Teizer, J.1
Vela, P.A.2
-
29
-
-
77956329005
-
Real-time data collection and visualization technology in construction
-
ASCE Banff, Canada
-
T. Cheng, and J. Teizer Real-time data collection and visualization technology in construction Construction Research Congress 2010 1 2010 ASCE Banff, Canada 339 348
-
(2010)
Construction Research Congress 2010
, vol.1
, pp. 339-348
-
-
Cheng, T.1
Teizer, J.2
-
30
-
-
77951219870
-
Computer vision-based video interpretation model for automated productivity analysis of construction operations
-
J. Gong, and C. Caldas Computer vision-based video interpretation model for automated productivity analysis of construction operations ASCE Journal of Computing in Civil Engineering 24 3 2010 223 324
-
(2010)
ASCE Journal of Computing in Civil Engineering
, vol.24
, Issue.3
, pp. 223-324
-
-
Gong, J.1
Caldas, C.2
-
35
-
-
21644463503
-
Real-time foreground-background segmentation using codebook model
-
DOI 10.1016/j.rti.2004.12.004, PII S1077201405000057, Video Object Processing
-
K. Kim, T.H. Chalidabhongse, D. Harwood, and L. Davis Real-time foreground-background segmentation using codebook model Real-Time Imaging 11 3 2005 172 185 (Pubitemid 40929458)
-
(2005)
Real-Time Imaging
, vol.11
, Issue.3
, pp. 172-185
-
-
Kim, K.1
Chalidabhongse, T.H.2
Harwood, D.3
Davis, L.4
-
39
-
-
4944221737
-
Video-based event recognition: Activity representation and probabilistic recognition methods
-
S. Hongeng, R. Nevatia, and F. Bremond Video-based event recognition: activity representation and probabilistic recognition methods Computer Vision and Image Understanding 96 2 2004 129 162
-
(2004)
Computer Vision and Image Understanding
, vol.96
, Issue.2
, pp. 129-162
-
-
Hongeng, S.1
Nevatia, R.2
Bremond, F.3
-
40
-
-
0000755808
-
Image analysis and rule-based reasoning for a traffic monitoring system
-
R. Cucchiara, M. Piccardi, and P. Mello Image analysis and rule-based reasoning for a traffic monitoring system Intelligent Transportation Systems 1 2 2002 119 130
-
(2002)
Intelligent Transportation Systems
, vol.1
, Issue.2
, pp. 119-130
-
-
Cucchiara, R.1
Piccardi, M.2
Mello, P.3
|