메뉴 건너뛰기




Volumn , Issue , 2009, Pages 11-20

Development of human pose analyzing algorithms for the determination of construction productivity in real-time

Author keywords

Computer vision; Construction; Neural network; Productivity; Real time

Indexed keywords

ANALYSIS RESULTS; AUTOMATIC DETERMINATION; BRIDGE CONSTRUCTIONS; CONSTRUCTION ACTIVITIES; CONSTRUCTION CREWS; CONSTRUCTION OPERATIONS; CONSTRUCTION PRODUCTIVITY; CONSTRUCTION WORKERS; HUMAN POSE; IMAGE PROCESSING TECHNIQUE; LABOR PRODUCTIVITY; MANUAL METHODS; PROJECT SITE; RAPID CONSTRUCTION; REAL TIME;

EID: 69949090406     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1061/41020(339)2     Document Type: Conference Paper
Times cited : (59)

References (11)
  • 1
    • 34547332043 scopus 로고    scopus 로고
    • Enhancing the capability of rapid bridge replacement after extreme events
    • Bai, Y., Kim, S. H. and Burkett, W. R. (2007). "Enhancing the Capability of Rapid Bridge Replacement after Extreme Events, " Engineering, Construction and Architectural Management, Vol. 14, No. 4, pp 375-386.
    • (2007) Engineering, Construction and Architectural Management , vol.14 , Issue.4 , pp. 375-386
    • Bai, Y.1    Kim, S.H.2    Burkett, W.R.3
  • 4
    • 69949107802 scopus 로고    scopus 로고
    • Situation based modeling for construction productivity
    • San Diego, California
    • Eldon, C., and Janaka Y. R., (2005). "Situation Based Modeling for Construction Productivity, " 2005 CRC Proceedings, San Diego, California, Vol. 183, No. 40754.
    • (2005) 2005 CRC Proceedings , vol.183 , pp. 40754
    • Janaka, Y.R.1    Eldon, C.2
  • 7
    • 0034298443 scopus 로고    scopus 로고
    • Estimating labor productivity using probability inference neural network
    • Ming, L., S. M. Abou Rizk, et al. (2000). "Estimating Labor Productivity Using Probability Inference Neural Network, " J. of Computing in CE, 14 (4), 241-248.
    • (2000) J. of Computing in CE , vol.14 , Issue.4 , pp. 241-248
    • Ming, L.1    Rizk, S.M.A.2
  • 9
    • 13944281377 scopus 로고    scopus 로고
    • Can labor inputs be measured and controlled automatically?
    • Navon, R., and Goldschmidt, E. (2003). "Can Labor Inputs be Measured and Controlled Automatically?" J. of Constr. Eng. Manage., 129(4), 437-445.
    • (2003) J. of Constr. Eng. Manage. , vol.129 , Issue.4 , pp. 437-445
    • Navon, R.1    Goldschmidt, E.2
  • 10
    • 15944411816 scopus 로고    scopus 로고
    • Field Experiments in Automated Monitoring of Road Construction
    • DOI 10.1061/(ASCE)0733-9364(2005)131:4(487)
    • Navon, R., and Shpatnitsky, Y. (2005). "Field Experiments in Automated Monitoring of Road Construction." J. of Constr. Eng. Manage., 131(4), pp 487-493. (Pubitemid 40430145)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.4 , pp. 487-493
    • Navon, R.1    Shpatnitsky, Y.2
  • 11
    • 13244265795 scopus 로고    scopus 로고
    • Application of integrated GPS and GIS technology for reducing construction waste and improving construction efficiency
    • Heng, Li., Zhen, C., Liang, Y. and S.C.W. Kong (2005 )"Application of integrated GPS and GIS technology for reducing construction waste and improving construction efficiency" International Conference for Construction Information Technology, 14 (3), pp 323-331.
    • (2005) International Conference for Construction Information Technology , vol.14 , Issue.3 , pp. 323-331
    • Heng, Li.1    Zhen, C.2    Liang, Y.A.3    Kong, S.C.W.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.