-
1
-
-
34547332043
-
Enhancing the capability of rapid bridge replacement after extreme events
-
Bai, Y., Kim, S. H. and Burkett, W. R. (2007). "Enhancing the Capability of Rapid Bridge Replacement after Extreme Events, " Engineering, Construction and Architectural Management, Vol. 14, No. 4, pp 375-386.
-
(2007)
Engineering, Construction and Architectural Management
, vol.14
, Issue.4
, pp. 375-386
-
-
Bai, Y.1
Kim, S.H.2
Burkett, W.R.3
-
3
-
-
0028378716
-
Performance of optical flow techniques
-
Baron, J. L., Fleet D. J. and Beauchemin, S.S (1994). "Performance of Optical Flow Techniques, " International Journal of Computer Vision, 12 (1), pp 43-77.
-
(1994)
International Journal of Computer Vision
, vol.12
, Issue.1
, pp. 43-77
-
-
Fleet, D.J.1
Baron, J.L.2
Beauchemin, S.3
-
4
-
-
69949107802
-
Situation based modeling for construction productivity
-
San Diego, California
-
Eldon, C., and Janaka Y. R., (2005). "Situation Based Modeling for Construction Productivity, " 2005 CRC Proceedings, San Diego, California, Vol. 183, No. 40754.
-
(2005)
2005 CRC Proceedings
, vol.183
, pp. 40754
-
-
Janaka, Y.R.1
Eldon, C.2
-
5
-
-
33947287360
-
A moving objects detection approach for smart sensor
-
Dalian, China
-
Lin, Hong-Wen, Yang, Shao-Qing, Xia, Zhi-Jun, and Kang, Chun-Yu (2006). "A Moving Objects Detection Approach for Smart Sensor". International Conference on Machine Learning and Cybernetics, Dalian, China, pp 3751-3754.
-
(2006)
International Conference On Machine Learning and Cybernetics
, pp. 3751-3754
-
-
Lin, H.-W.1
Yang, S.-Q.2
Xia, Z.-H.3
Kang, C.-Y.4
-
6
-
-
27144487010
-
A hybrid neural network for predicting construction labour productivity
-
No. 40794
-
Dissanayake, M., Aminah R. F., Russell, A.D., and Pedrycz, W., et al. (2005). "A Hybrid Neural Network for Predicting Construction Labour Productivity, " ASCE International Conference on Computing in CE, Vol. 179, No. 40794.
-
(2005)
ASCE International Conference on Computing in CE
, vol.179
-
-
Aminah, R.F.1
Dissanayake, M.2
Russell, A.D.3
Pedrycz, W.4
-
7
-
-
0034298443
-
Estimating labor productivity using probability inference neural network
-
Ming, L., S. M. Abou Rizk, et al. (2000). "Estimating Labor Productivity Using Probability Inference Neural Network, " J. of Computing in CE, 14 (4), 241-248.
-
(2000)
J. of Computing in CE
, vol.14
, Issue.4
, pp. 241-248
-
-
Ming, L.1
Rizk, S.M.A.2
-
8
-
-
0021391789
-
-
New York, ACM
-
Zhang, T. Y. and C. Y. Suen (1984). "A Fast Parallel Algorithm for Thinning Digital Patterns, " New York, ACM, 27(3), pp 236-239.
-
(1984)
A Fast Parallel Algorithm for Thinning Digital Patterns
, vol.27
, Issue.3
, pp. 236-239
-
-
Zhang, T.Y.1
Suen, C.Y.2
-
9
-
-
13944281377
-
Can labor inputs be measured and controlled automatically?
-
Navon, R., and Goldschmidt, E. (2003). "Can Labor Inputs be Measured and Controlled Automatically?" J. of Constr. Eng. Manage., 129(4), 437-445.
-
(2003)
J. of Constr. Eng. Manage.
, vol.129
, Issue.4
, pp. 437-445
-
-
Navon, R.1
Goldschmidt, E.2
-
10
-
-
15944411816
-
Field Experiments in Automated Monitoring of Road Construction
-
DOI 10.1061/(ASCE)0733-9364(2005)131:4(487)
-
Navon, R., and Shpatnitsky, Y. (2005). "Field Experiments in Automated Monitoring of Road Construction." J. of Constr. Eng. Manage., 131(4), pp 487-493. (Pubitemid 40430145)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.4
, pp. 487-493
-
-
Navon, R.1
Shpatnitsky, Y.2
-
11
-
-
13244265795
-
Application of integrated GPS and GIS technology for reducing construction waste and improving construction efficiency
-
Heng, Li., Zhen, C., Liang, Y. and S.C.W. Kong (2005 )"Application of integrated GPS and GIS technology for reducing construction waste and improving construction efficiency" International Conference for Construction Information Technology, 14 (3), pp 323-331.
-
(2005)
International Conference for Construction Information Technology
, vol.14
, Issue.3
, pp. 323-331
-
-
Heng, Li.1
Zhen, C.2
Liang, Y.A.3
Kong, S.C.W.4
|