메뉴 건너뛰기




Volumn 24, Issue 3, 2010, Pages 252-263

Computer vision-based video interpretation model for automated productivity analysis of construction operations

Author keywords

Analysis; Automated data collection; Computer applications; Computer vision; Construction management; Data collection; Imaging techniques; Monitoring; Pattern recognition; Productivity; Productivity analysis; Resource tracking; Video interpretation; Videotaping

Indexed keywords

ANALYSIS; AUTOMATED DATA COLLECTION; CONSTRUCTION MANAGEMENT; DATA COLLECTION; PRODUCTIVITY ANALYSIS; VIDEO INTERPRETATION;

EID: 77951219870     PISSN: 08873801     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CP.1943-5487.0000027     Document Type: Article
Times cited : (178)

References (29)
  • 1
    • 0043275940 scopus 로고    scopus 로고
    • Linking time-lapse digital photography and dynamic scheduling of construction operations
    • DOI 10.1061/(ASCE)0887-3801(2002)16:4(269)
    • Abeid, J., and Arditi, D. (2002). " Linking time-lapse digital photography and dynamic scheduling of construction operations.." J. Comput. Civ. Eng. JCCEE5 0887-3801, 16, 269-279. 10.1061/(ASCE)0887-3801(2002)16:4(269) (Pubitemid 40475483)
    • (2002) Journal of Computing in Civil Engineering , vol.16 , Issue.4 , pp. 269-279
    • Abeid, J.1    Arditi, D.2
  • 2
    • 0016928612 scopus 로고
    • Modeling method-productivity
    • JCCEAZ 0569-7948.
    • Adrian, J. J., and Boyer, L. T. (1976). " Modeling method-productivity.." J. Constr. Div. JCCEAZ 0569-7948, 102 (C01), 157-168.
    • (1976) J. Constr. Div. , vol.102 , Issue.C01 , pp. 157-168
    • Adrian, J.J.1    Boyer, L.T.2
  • 3
    • 0033980854 scopus 로고    scopus 로고
    • Trends in productivity improvement in the US construction industry
    • 10.1080/014461900370915 0144-6193
    • Arditi, D., and Krishna, M. (2000). " Trends in productivity improvement in the US construction industry.." Constr. Manag. Econ., 18, 15-27. 10.1080/014461900370915 0144-6193
    • (2000) Constr. Manag. Econ. , vol.18 , pp. 15-27
    • Arditi, D.1    Krishna, M.2
  • 6
    • 0033703954 scopus 로고    scopus 로고
    • Ladars for construction assessment and update
    • AUCOES 0926-5805, 10.1016/S0926-5805(00)00058-3
    • Cheok, G. S., Stone, W. C., Lipman, R. R., and Witzgall, C. (2000). " Ladars for construction assessment and update.." Autom. Constr. AUCOES 0926-5805, 9 (5-6), 463-477. 10.1016/S0926-5805(00)00058-3
    • (2000) Autom. Constr. , vol.9 , Issue.56 , pp. 463-477
    • Cheok, G.S.1    Stone, W.C.2    Lipman, R.R.3    Witzgall, C.4
  • 7
    • 0025404538 scopus 로고
    • Productivity improvement tool: Camcorders
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1990)116:1(100)
    • Eldin, N. N., and Egger, S. (1990). " Productivity improvement tool: Camcorders.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 116 (1), 100-111. 10.1061/(ASCE)0733-9364(1990)116:1(100)
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.1 , pp. 100-111
    • Eldin, N.N.1    Egger, S.2
  • 8
    • 77951230481 scopus 로고    scopus 로고
    • Construction tops trillion dollar annual pace
    • Engineering News Records (ENR).. "." ENREAU 0013-807X, (19).
    • Engineering News Records (ENR). (2004). " Construction tops trillion dollar annual pace.." Eng. News-Rec. ENREAU 0013-807X, 253 (19), 23.
    • (2004) Eng. News-Rec. , vol.253 , pp. 23
  • 9
    • 0043275938 scopus 로고    scopus 로고
    • Time-lapse video applications for construction project management
    • Everett, J. G., Halkali, H., and Schlaff, T. G. (1998). " Time-lapse video applications for construction project management.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 124 (3), 204-209. 10.1061/(ASCE)0733-9364(1998)124: 3(204) (Pubitemid 128562879)
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.3 , pp. 204-209
    • Everett, J.G.1    Halkali, H.2    Schlaff, T.G.3
  • 10
    • 84891310850 scopus 로고    scopus 로고
    • Application of visualization techniques for construction progress monitoring
    • ASCE, Reston, Va..
    • Fard, M. G., and Pena-Mora, F. (2007). " Application of visualization techniques for construction progress monitoring.." Proc., 2007 Int. Workshop on Computing in Civil Engineering, ASCE, Reston, Va., 216-223.
    • (2007) Proc., 2007 Int. Workshop on Computing in Civil Engineering , pp. 216-223
    • Fard, M.G.1    Pena-Mora, F.2
  • 11
    • 33749079344 scopus 로고
    • Photographic analysis for construction operations
    • JCCEAZ 0569-7948.
    • Fondahl, J. W. (1960). " Photographic analysis for construction operations.." J. Constr. Div. JCCEAZ 0569-7948, 86 (2), 9-25.
    • (1960) J. Constr. Div. , vol.86 , Issue.2 , pp. 9-25
    • Fondahl, J.W.1
  • 12
    • 2342443555 scopus 로고    scopus 로고
    • Partial factor productivity and equipment technology change at activity level in U.S. construction industry
    • DOI 10.1061/(ASCE)0733-9364(2002)128:6(463)
    • Goodrum, P. M., and Haas, C. T. (2002). " Partial factor productivity and equipment technology change at activity level U.S. construction industry.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 128 (6), 463-472. 10.1061/(ASCE)0733-9364(2002)128:6(463) (Pubitemid 40265510)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.6 , pp. 463-472
    • Goodrum, P.M.1    Haas, C.T.2
  • 13
    • 77951212432 scopus 로고    scopus 로고
    • A framework for automated localization of on-site construction components
    • ASCE, Reston, Va.
    • Grau, D., and Caldas, C. (2007). " A framework for automated localization of on-site construction components.." Proc., 2007 ASCE/CIB Construction Research Congress, ASCE, Reston, Va.
    • (2007) Proc., 2007 ASCE/CIB Construction Research Congress
    • Grau, D.1    Caldas, C.2
  • 15
    • 25444449848 scopus 로고    scopus 로고
    • Reduction of short-interval GPS data for construction operations analysis
    • DOI 10.1061/(ASCE)0733-9364(2005)131:8(920)
    • Hildreth, J., Vorster, M., and Martinez, J. (2005). " Reduction of short-interval GPS data for construction operations analysis.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 131, 920-927. 10.1061/(ASCE)0733-9364(2005)131: 8(920) (Pubitemid 41364754)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.8 , pp. 920-927
    • Hildreth, J.1    Vorster, M.2    Martinez, J.3
  • 18
    • 77951212849 scopus 로고    scopus 로고
    • Development of a real-time productivity measurement system for bridge replacement
    • Iowa State Univ., Ames, Iowa.
    • Kim, S. H., and Bai, Y. (2007). " Development of a real-time productivity measurement system for bridge replacement.." Proc., Mid-Continent Transportation Symp., Iowa State Univ., Ames, Iowa.
    • (2007) Proc., Mid-Continent Transportation Symp.
    • Kim, S.H.1    Bai, Y.2
  • 19
    • 0028741632 scopus 로고
    • General purpose simulation with stroboscope
    • Society for Computer Simulation International, Orlando, Fla..
    • Martinez, J. C., and Ioannou, P. G. (1994). " General purpose simulation with stroboscope.." Proc., 1994 Winter Simulation Conf., Society for Computer Simulation International, Orlando, Fla., 1159-1166.
    • (1994) Proc., 1994 Winter Simulation Conf. , pp. 1159-1166
    • Martinez, J.C.1    Ioannou, P.G.2
  • 21
    • 33847222202 scopus 로고    scopus 로고
    • Assessing research issues in Automated Project Performance Control (APPC)
    • DOI 10.1016/j.autcon.2006.08.001, PII S0926580506000768
    • Navon, R., and Sacks, R. (2007). " Assessing research issues in Automated Project Performance Control (APPC).." Autom. Construct., 16, 474-484. 10.1016/j.autcon.2006.08.001 0926-5805 (Pubitemid 46304214)
    • (2007) Automation in Construction , vol.16 , Issue.4 , pp. 474-484
    • Navon, R.1    Sacks, R.2
  • 23
    • 81855202995 scopus 로고    scopus 로고
    • A planning based approach for fusing data from multiple sources for productivity monitoring
    • ASCE, Reston, Va.
    • Pradhan, A., and Akinci, B. (2007). " A planning based approach for fusing data from multiple sources for productivity monitoring.." Proc., 2007 ASCE/CIB Construction Research Congress, ASCE, Reston, Va.
    • (2007) Proc., 2007 ASCE/CIB Construction Research Congress
    • Pradhan, A.1    Akinci, B.2
  • 24
    • 30844462121 scopus 로고    scopus 로고
    • 3D scan information management system for construction management
    • DOI 10.1061/(ASCE)0733-9364(2006)132:2(134)
    • Shih, N. -J., and Huang, S. -T. (2006). " 3D scan information management system for construction management.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 132 (2), 134-142. 10.1061/(ASCE)0733-9364(2006)132:2(134) (Pubitemid 43107211)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.2 , pp. 134-142
    • Shih, N.-J.1    Huang, S.-T.2
  • 25
    • 78649315884 scopus 로고    scopus 로고
    • Real-time construction operation tracking from resource positions
    • ASCE, Reston, Va..
    • Su, Y. Y., and Liu, L. Y. (2007) " Real-time construction operation tracking from resource positions.." Proc., 2007 Int. Workshop on Computing in Civil Engineering, ASCE, Reston, Va., 200-207.
    • (2007) Proc., 2007 Int. Workshop on Computing in Civil Engineering , pp. 200-207
    • Su, Y.Y.1    Liu, L.Y.2
  • 28
    • 80053644915 scopus 로고    scopus 로고
    • Comparison of civil infrastructure optical-based spatial data acquisition techniques
    • ASCE, Reston, Va..
    • Zhu, Z., and Brilakis, I. (2008). " Comparison of civil infrastructure optical-based spatial data acquisition techniques.." Proc., 2007 Int. Workshop on Computing in Civil Engineering, ASCE, Reston, Va., 737-744.
    • (2008) Proc., 2007 Int. Workshop on Computing in Civil Engineering , pp. 737-744
    • Zhu, Z.1    Brilakis, I.2
  • 29
    • 34250683114 scopus 로고    scopus 로고
    • Using hue, saturation, and value color space for hydraulic excavator idle time analysis
    • DOI 10.1061/(ASCE)0887-3801(2007)21:4(238)
    • Zou, J., and Kim, H. (2007). " Using hue, saturation, and value color space for hydraulic excavator idle time analysis.." J. Comput. Civ. Eng. JCCEE5 0887-3801, 21, 238-246. 10.1061/(ASCE)0887-3801(2007)21:4(238) (Pubitemid 46935005)
    • (2007) Journal of Computing in Civil Engineering , vol.21 , Issue.4 , pp. 238-246
    • Zou, J.1    Kim, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.