-
2
-
-
0028408966
-
Dispatching rules in scheduling: A fuzzy approach
-
0899.90111 10.1080/00207549408956978
-
B Grabot L Geneste 1994 Dispatching rules in scheduling: a fuzzy approach Int J Prod Res 32 4 903 915 0899.90111 10.1080/00207549408956978
-
(1994)
Int J Prod Res
, vol.32
, Issue.4
, pp. 903-915
-
-
Grabot, B.1
Geneste, L.2
-
3
-
-
0016973040
-
Finding some essential characteristics of the feasible solutions for a scheduling problem
-
503689 0335.90027 10.1287/opre.24.4.774
-
JF Erschler JP Roubellat Vernhes 1976 Finding some essential characteristics of the feasible solutions for a scheduling problem Oper Res 24 774 783 503689 0335.90027 10.1287/opre.24.4.774
-
(1976)
Oper Res
, vol.24
, pp. 774-783
-
-
Erschler, J.F.1
Roubellat, J.P.2
Vernhes3
-
4
-
-
0029355717
-
Fuzzy constraints in job-shop scheduling
-
10.1007/BF00128646
-
D Dubois H Fargier H Prade 1995 Fuzzy constraints in job-shop scheduling J Intell Manuf 6 215 234 10.1007/BF00128646
-
(1995)
J Intell Manuf
, vol.6
, pp. 215-234
-
-
Dubois, D.1
Fargier, H.2
Prade, H.3
-
7
-
-
0346093876
-
Hyung Rim Choi, Hyun Soo Kim, A hybrid genetic algorithm for the job shop scheduling problems
-
Byung Joo Park. 10.1016/S0360-8352(03)00077-9
-
Byung Joo Park 2003 Hyung Rim Choi, Hyun Soo Kim, A hybrid genetic algorithm for the job shop scheduling problems Computer & Industrial Engineering 45 597 613 10.1016/S0360-8352(03)00077-9
-
(2003)
Computer & Industrial Engineering
, vol.45
, pp. 597-613
-
-
-
8
-
-
78649314780
-
A job-shop scheduling problem (JSSP) using Genetic algorithm (GA)
-
June 13-15, 2006
-
Mahanim Omar, Adam Baharum, Yahya Abu Hasan (2006) A job-shop scheduling problem (JSSP) using Genetic algorithm (GA), Proceedings of the 2nd IMT-GT Regional Conference on Mathematics, Statistics and Applications Universiti Sains Malaysia, Penang, June 13-15, 2006
-
(2006)
Proceedings of the 2nd IMT-GT Regional Conference on Mathematics, Statistics and Applications Universiti Sains Malaysia, Penang
-
-
Omar, M.1
Baharum, A.2
Abu Hasan, Y.3
-
10
-
-
0000996580
-
Two scheduling problems with fuzzy due-dates
-
1167456 0767.90037 10.1016/0165-0114(92)90372-B
-
H Ishii M Tada T Masuda 1992 Two scheduling problems with fuzzy due-dates Fuzzy Sets Syst 46 339 347 1167456 0767.90037 10.1016/0165-0114(92)90372-B
-
(1992)
Fuzzy Sets Syst
, vol.46
, pp. 339-347
-
-
Ishii, H.1
Tada, M.2
Masuda, T.3
-
11
-
-
0032592176
-
An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy due date
-
10.1016/S0360-8352(99)00135-7
-
Sakawa Masatoshi Mori Tetsuya 1999 An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy due date Comput Ind Eng 36 325 341 10.1016/S0360-8352(99)00135-7
-
(1999)
Comput Ind Eng
, vol.36
, pp. 325-341
-
-
Sakawa, M.1
Mori, T.2
-
12
-
-
0033881797
-
Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms
-
DOI 10.1016/S0377-2217(99)00094-6
-
Sakawa Masatoshi Kubota Ryo 2000 Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms Eur J Oper Res 120 393 407 0954.90071 10.1016/S0377-2217(99)00094-6 (Pubitemid 30542643)
-
(2000)
European Journal of Operational Research
, vol.120
, Issue.2
, pp. 393-407
-
-
Sakawa, M.1
Kubota, R.2
-
13
-
-
26844467731
-
Fuzzy programming for multi-objective fuzzy job shop scheduling with alternative machines through genetic algorithm
-
L. Wang K. Chen Y.S. Ong
-
Li FM, Zhu YL, Yin CW, Song XY (2005) Fuzzy programming for multi-objective fuzzy job shop scheduling with alternative machines through genetic algorithm. In: L. Wang K. Chen Y.S. Ong, Advance in Natural Computation. 992-1004
-
(2005)
Advance in Natural Computation
, pp. 992-1004
-
-
Li, F.M.1
Zhu, Y.L.2
Yin, C.W.3
Song, X.Y.4
-
14
-
-
43249130971
-
Pareto archive particle swarm optimization for multi-objective fuzzy job shop scheduling problems
-
DOI 10.1007/s00170-007-0945-8
-
DM Lei 2008 Pareto archive particle swarm optimization for multi-objective fuzzy job shop scheduling problems Int J Adv Manuf Technol 37 157 165 10.1007/s00170-007-0945-8 (Pubitemid 351651607)
-
(2008)
International Journal of Advanced Manufacturing Technology
, vol.37
, Issue.1-2
, pp. 157-165
-
-
Lei, D.1
-
15
-
-
0141637075
-
Fuzzy due-date scheduling problem with fuzzy processing time, int
-
10.1111/j.1475-3995.1999.tb00178.x
-
T Itosh H ishii 1999 Fuzzy due-date scheduling problem with fuzzy processing time, int Transactions in Operational Research 6 639 647 10.1111/j.1475-3995.1999.tb00178.x
-
(1999)
Transactions in Operational Research
, vol.6
, pp. 639-647
-
-
Itosh, T.1
Ishii, H.2
-
16
-
-
0020813415
-
Ranking fuzzy numbers in the setting of possibility theory
-
DOI 10.1016/0020-0255(83)90025-7
-
D Dubis H Prade 1983 Ranking fuzzy numbers in the setting of possibility theory Inf Sci 20 183 224 10.1016/0020-0255(83)90025-7 (Pubitemid 14551926)
-
(1983)
Information sciences
, vol.30
, Issue.3
, pp. 183-224
-
-
Dubois Didier1
Prade Henri2
-
17
-
-
0035369592
-
Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates
-
DOI 10.1016/S0952-1976(01)00011-2, PII S0952197601000112
-
S Chanas A Kasperski 2001 Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates Eng Appl Artif Intell 14 377 386 10.1016/S0952-1976(01)00011-2 (Pubitemid 32529292)
-
(2001)
Engineering Applications of Artificial Intelligence
, vol.14
, Issue.3
, pp. 377-386
-
-
Chanas, S.1
Kasperski, A.2
-
18
-
-
0037410246
-
On two single machine scheduling problems with fuzzy processing times and fuzzy due dates
-
1966160 1037.90025 10.1016/S0377-2217(02)00561-1
-
S Chanas A Kasperski 2003 on two single machine scheduling problems with fuzzy processing times and fuzzy due dates Eur J Oper Res 147 281 296 1966160 1037.90025 10.1016/S0377-2217(02)00561-1
-
(2003)
Eur J Oper Res
, vol.147
, pp. 281-296
-
-
Chanas, S.1
Kasperski, A.2
-
19
-
-
34248666540
-
Fuzzy sets
-
219427 0139.24606 10.1016/S0019-9958(65)90241-X
-
LA Zadeh 1965 Fuzzy sets Inf Control 8 338 353 219427 0139.24606 10.1016/S0019-9958(65)90241-X
-
(1965)
Inf Control
, vol.8
, pp. 338-353
-
-
Zadeh, L.A.1
-
20
-
-
0142000477
-
Differential Evolution - A Simple and Efficient Heuristic for Global Optimization over Continuous Spaces
-
R Storn K Price 1997 Differential evolution-a simple and efficient heuristic for global optimization over continuous spaces J Glob Optim 11 341 359 1479553 0888.90135 10.1023/A:1008202821328 (Pubitemid 127502202)
-
(1997)
Journal of Global Optimization
, vol.11
, Issue.4
, pp. 341-359
-
-
Storn, R.1
Price, K.2
-
21
-
-
0001096735
-
Genetic algorithms and random keys for sequencing and optimization
-
0807.90060
-
JC Bean 1994 Genetic algorithms and random keys for sequencing and optimization ORSA J Comput 6 154 160 0807.90060
-
(1994)
ORSA J Comput
, vol.6
, pp. 154-160
-
-
Bean, J.C.1
-
22
-
-
0037410971
-
New heuristics for no-wait flowshops to minimize makespan
-
DOI 10.1016/S0305-0548(02)00068-0, PII S0305054802000680
-
T Aldowaisan A Allahverdi 2003 New heuristics for no-wait flowshops to minimize makespan Comput Oper Res 30 1219 1231 1047.90053 10.1016/S0305-0548(02) 00068-0 (Pubitemid 36346004)
-
(2003)
Computers and Operations Research
, vol.30
, Issue.8
, pp. 1219-1231
-
-
Aldowaisan, T.1
Allahverdi, A.2
|