-
2
-
-
33645519996
-
Six Sigma for service processes
-
()“”-
-
Antony, J. (2006), “Six Sigma for service processes”, Business Process Management Journal, Vol. 12 No. 2, pp. 234-48.
-
(2006)
Business Process Management Journal
, vol.12
, Issue.2
, pp. 234-248
-
-
Antony, J.1
-
3
-
-
84993082429
-
Six sigma in software industry: results from a pilot study
-
()“”-
-
Antony, J. and Fergusson, C. (2004), “Six sigma in software industry: results from a pilot study”, Managerial Auditing Journal, Vol. 19 No. 8, pp. 1025-32.
-
(2004)
Managerial Auditing Journal
, vol.19
, Issue.8
, pp. 1025-1032
-
-
Antony, J.1
Fergusson, C.2
-
4
-
-
25444431732
-
Six Sigma in small and medium size UK manufacturing enterprises
-
()“”-
-
Antony, J., Kumar, M. and Madu, C.N. (2005), “Six Sigma in small and medium size UK manufacturing enterprises”, International Journal of Quality & Reliability Management, Vol. 22 No. 8, pp. 860-74.
-
(2005)
International Journal of Quality & Reliability Management
, vol.22
, Issue.8
, pp. 860-874
-
-
Antony, J.1
Kumar, M.2
Madu, C.N.3
-
5
-
-
0036178544
-
Critical success factors for the successful implementation of Six Sigma projects in organizations
-
()“”-
-
Banuelas, R. and Antony, J. (2002), “Critical success factors for the successful implementation of Six Sigma projects in organizations”, The TQM Magazine, Vol. 14 No. 2, pp. 92-9.
-
(2002)
The TQM Magazine
, vol.14
, Issue.2
, pp. 92-99
-
-
Banuelas, R.1
Antony, J.2
-
6
-
-
26644442351
-
An application of Six Sigma to reduce waste
-
()“”-
-
Banuelas, R., Antony, J. and Brace, M. (2005), “An application of Six Sigma to reduce waste”, Quality and Reliability Engineering International, Vol. 21 No. 6, pp. 553-70.
-
(2005)
Quality and Reliability Engineering International
, vol.21
, Issue.6
, pp. 553-570
-
-
Banuelas, R.1
Antony, J.2
Brace, M.3
-
7
-
-
33646894128
-
Six Sigma arises from the ashes of TQM with a twist
-
()“”-
-
Black, K. and Revere, L. (2006), “Six Sigma arises from the ashes of TQM with a twist”, International Journal of Health Care & Quality Assurance, Vol. 19 No. 3, pp. 259-66.
-
(2006)
International Journal of Health Care & Quality Assurance
, vol.19
, Issue.3
, pp. 259-266
-
-
Black, K.1
Revere, L.2
-
8
-
-
0040834517
-
Identification of critical factors of TQM
-
()“”-
-
Black, S.A. and Porter, L.J. (1996), “Identification of critical factors of TQM”, Decision Science, Vol. 27 No. 1, pp. 1-21.
-
(1996)
Decision Science
, vol.27
, Issue.1
, pp. 1-21
-
-
Black, S.A.1
Porter, L.J.2
-
10
-
-
34247625696
-
Applied product capability analysis chart in measure step of Six Sigma
-
()“”-
-
Chen, K.S., Hsu, C.H. and Ouyang, L.Y. (2007), “Applied product capability analysis chart in measure step of Six Sigma”, Quality and Quantity, Vol. 41, pp. 387-400.
-
(2007)
Quality and Quantity
, vol.41
, pp. 387-400
-
-
Chen, K.S.1
Hsu, C.H.2
Ouyang, L.Y.3
-
13
-
-
84986037946
-
Successful implementation of Six Sigma: benchmarking General Electric Company
-
()“”-
-
Henderson, K.M. and Evans, J.R. (2000), “Successful implementation of Six Sigma: benchmarking General Electric Company”, Benchmarking: An International Journal, Vol. 7 No. 4, pp. 260-81.
-
(2000)
Benchmarking: An International Journal
, vol.7
, Issue.4
, pp. 260-281
-
-
Henderson, K.M.1
Evans, J.R.2
-
14
-
-
0032095617
-
Six Sigma and the future of the quality profession
-
()“”-
-
Hoerl, R.W. (2001), “Six Sigma and the future of the quality profession”, Quality Progress, Vol. 31 No. 6, pp. 35-42.
-
(2001)
Quality Progress
, vol.31
, Issue.6
, pp. 35-42
-
-
Hoerl, R.W.1
-
15
-
-
84954484412
-
A comparision of two new indices for the assessment of fit of structural equation models
-
()“”-
-
Goffin, R.D. (1993), “A comparision of two new indices for the assessment of fit of structural equation models”, Psychological Bulletin, Vol. 103, pp. 265-75.
-
(1993)
Psychological Bulletin
, vol.103
, pp. 265-275
-
-
Goffin, R.D.1
-
17
-
-
84954475594
-
Six Sigma implementation at Dow Chemical Company: a comprehensive review
-
()“”Butterworth-HeinemannOxford:
-
Kumar, A., Motwani, J. and Antony, J. (2008), “Six Sigma implementation at Dow Chemical Company: a comprehensive review”, World Class Applications of Six Sigma, Butterworth-Heinemann, Oxford.
-
(2008)
World Class Applications of Six Sigma
-
-
Kumar, A.1
Motwani, J.2
Antony, J.3
-
18
-
-
0037359278
-
Six Sigma: a goal-theoretic perspective
-
()“”-
-
Linderman, K., Schroeder, R.G., Zaheer, S. and Choo, A.S. (2003), “Six Sigma: a goal-theoretic perspective”, Journal of Operation Management, Vol. 21 No. 2, pp. 193-203.
-
(2003)
Journal of Operation Management
, vol.21
, Issue.2
, pp. 193-203
-
-
Linderman, K.1
Schroeder, R.G.2
Zaheer, S.3
Choo, A.S.4
-
19
-
-
0242360272
-
Six Sigma and introductory statistics education
-
()“”-
-
Maleyeff, J. and Kaminssky, F.C. (2002), “Six Sigma and introductory statistics education”, Education & Training, Vol. 44, pp. 82-9.
-
(2002)
Education & Training
, vol.44
, pp. 82-89
-
-
Maleyeff, J.1
Kaminssky, F.C.2
-
20
-
-
0242297528
-
Vendor selection using interpretive structural modeling (ISM)
-
()“”-
-
Mandal, A. and Deshmukh, S.G. (1994), “Vendor selection using interpretive structural modeling (ISM)”, International Journal of Operation & Production Management, Vol. 14 No. 6, pp. 52-9.
-
(1994)
International Journal of Operation & Production Management
, vol.14
, Issue.6
, pp. 52-59
-
-
Mandal, A.1
Deshmukh, S.G.2
-
21
-
-
84956050267
-
Leveraging Six Sigma discipline to drive improvement
-
()“”-
-
Matthew, H., Barth, B. and Sears, B. (2005), “Leveraging Six Sigma discipline to drive improvement”, International Journal of Six Sigma and Competitive Advantages, Vol. 1 No. 2, pp. 121-33.
-
(2005)
International Journal of Six Sigma and Competitive Advantages
, vol.1
, Issue.2
, pp. 121-133
-
-
Matthew, H.1
Barth, B.2
Sears, B.3
-
22
-
-
46349112096
-
Creating flex-lean-agile value chain by outsourcing: an ISM-based interventional roadmap
-
()“”-
-
Mohammed, I.R., Shankar, R. and Banwet, D.K. (2008), “Creating flex-lean-agile value chain by outsourcing: an ISM-based interventional roadmap”, Business Process Management Journal, Vol. 14 No. 3, pp. 338-89.
-
(2008)
Business Process Management Journal
, vol.14
, Issue.3
, pp. 338-389
-
-
Mohammed, I.R.1
Shankar, R.2
Banwet, D.K.3
-
24
-
-
0003485315
-
-
()McGraw-HillNew YorkNY:
-
Pande, P.S., Neuman, R.P. and Cavanagh, R.R. (2000), The Six Sigma Ways: How GE, Motorola and Other Top Companies are Honing Their Performance, McGraw-Hill, New York, NY.
-
(2000)
The Six Sigma Ways: How GE, Motorola and Other Top Companies are Honing Their Performance
-
-
Pande, P.S.1
Neuman, R.P.2
Cavanagh, R.R.3
-
25
-
-
0003858901
-
-
()McGraw-HillNew YorkNY:
-
Pyzdek, T. and Keller, P. (1999), The Six Sigma Handbook – A Complete Guide for Green-belts, Black-belts and Managers at All Levels, McGraw-Hill, New York, NY.
-
(1999)
The Six Sigma Handbook – A Complete Guide for Green-belts, Black-belts and Managers at All Levels
-
-
Pyzdek, T.1
Keller, P.2
-
26
-
-
0018451997
-
Chief executives define their own data needs
-
()“”-
-
Rockart, J. (1979), “Chief executives define their own data needs”, Harvard Business Review, Vol. 57 No. 2, pp. 238-41.
-
(1979)
Harvard Business Review
, vol.57
, Issue.2
, pp. 238-241
-
-
Rockart, J.1
-
28
-
-
0002773904
-
Scenario building: a critical study of energy conservation in the Indian cement industry
-
()“”-
-
Saxena, J.P., Sushil and Vrat, P. (1992), “Scenario building: a critical study of energy conservation in the Indian cement industry”, Technological Forecasting and Social Change, Vol. 41 No. 2, pp. 121-46.
-
(1992)
Technological Forecasting and Social Change
, vol.41
, Issue.2
, pp. 121-146
-
-
Saxena, J.P.1
Sushil, S.2
Vrat, P.3
-
29
-
-
0029482609
-
The objectives of waste management in India: a future inquiry
-
()“”-
-
Sharma, H.D., Gupta, A.D. and Sushil (1995), “The objectives of waste management in India: a future inquiry”, Technology Forecasting and Social Change, Vol. 48, pp. 285-309.
-
(1995)
Technology Forecasting and Social Change
, vol.48
, pp. 285-309
-
-
Sharma, H.D.1
Gupta, A.D.2
Sushil, S.3
-
30
-
-
80053050071
-
Six sigma: the evolution of 100 years of business improvement methodology
-
()“”-
-
Snee, R.D. (2004), “Six sigma: the evolution of 100 years of business improvement methodology”, International Journal of Six Sigma and Competitive Advantages, Vol. 1 No. 1, pp. 4-20.
-
(2004)
International Journal of Six Sigma and Competitive Advantages
, vol.1
, Issue.1
, pp. 4-20
-
-
Snee, R.D.1
-
33
-
-
6544242487
-
Confirmatory hierarchical factor analyses of psychological distress measures
-
()“”-
-
Tanaka, J.S. and Huba, G.J. (1984), “Confirmatory hierarchical factor analyses of psychological distress measures”, Journal of Personality and Social Psychology, Vol. 46, pp. 621-35.
-
(1984)
Journal of Personality and Social Psychology
, vol.46
, pp. 621-635
-
-
Tanaka, J.S.1
Huba, G.J.2
-
34
-
-
6744245357
-
A reliability coefficient for maximum likelihood factor analysis
-
()“”-
-
Tucker, L.R. and Lewis, C. (1973), “A reliability coefficient for maximum likelihood factor analysis”, Psychometrika, Vol. 38, pp. 1-10.
-
(1973)
Psychometrika
, vol.38
, pp. 1-10
-
-
Tucker, L.R.1
Lewis, C.2
-
35
-
-
18844441705
-
Developing interconnected matrices in structural modeling Institute of Electrical and Electronics Engineering Transactions on Systems
-
()“”-
-
Warfield, J.W. (1974), “Developing interconnected matrices in structural modeling Institute of Electrical and Electronics Engineering Transactions on Systems”, Man and Cybernetics, Vol. 4 No. 1, pp. 51-81.
-
(1974)
Man and Cybernetics
, vol.4
, Issue.1
, pp. 51-81
-
-
Warfield, J.W.1
|