-
1
-
-
0030102183
-
Primary production scheduling at steelmaking industries
-
H. S. Lee, S. S. Murthy, S. W. Haider, and D. V. Morse, "Primary production scheduling at steelmaking industries," IBM J. Res. Develop., vol.40, no.2, pp. 231-252, 1996.
-
(1996)
IBM J. Res. Develop.
, vol.40
, Issue.2
, pp. 231-252
-
-
Lee, H.S.1
Murthy, S.S.2
Haider, S.W.3
Morse, D.V.4
-
3
-
-
0032049311
-
The hot strip mill production scheduling problem: A tabu search approach
-
L. Lopez, M. W. Carter, and M. Gendreau, "The hot strip mill production scheduling problem: A tabu search approach," Euro. J. Operational Res., vol.106, pp. 317-335, 1998.
-
(1998)
Euro. J. Operational Res.
, vol.106
, pp. 317-335
-
-
Lopez, L.1
Carter, M.W.2
Gendreau, M.3
-
4
-
-
0033741404
-
Multiple traveling salesman problem model for hot scheduling in Shanghai Baoshan Iron & Steel Complex
-
L. X. Tang, J. Y. Liu, A. Y. Rong, and Z. H. Yang, "Multiple traveling salesman problem model for hot scheduling in Shanghai Baoshan Iron & Steel Complex," Euro. J. Operational Res., vol.124, pp. 267-282, 2000.
-
(2000)
Euro. J. Operational Res.
, vol.124
, pp. 267-282
-
-
Tang, L.X.1
Liu, J.Y.2
Rong, A.Y.3
Yang, Z.H.4
-
5
-
-
0043271409
-
Optimisation in steel hot rolling
-
A. Sciomachen, Ed. Chichester, U.K.: Wiley
-
P. Cowling, "Optimisation in steel hot rolling," in Optimization in Industry, A. Sciomachen, Ed. Chichester, U.K.: Wiley, 1995.
-
(1995)
Optimization in Industry
-
-
Cowling, P.1
-
6
-
-
0038789162
-
A flexible decision support system for steel hot rolling mill scheduling
-
P. Cowling, "A flexible decision support system for steel hot rolling mill scheduling," Comput. Ind. Eng., vol.45, no.2, pp. 307-321, 2003.
-
(2003)
Comput. Ind. Eng.
, vol.45
, Issue.2
, pp. 307-321
-
-
Cowling, P.1
-
7
-
-
43449091631
-
Integration of batching and scheduling for hot rolling production in steel industry
-
X. P.Wang and L. X. Tang, "Integration of batching and scheduling for hot rolling production in steel industry," Int. J.Adv. Manuf. Technol., vol.36, pp. 431-441, 2008.
-
(2008)
Int. J.Adv. Manuf. Technol.
, vol.36
, pp. 431-441
-
-
Wang, X.P.1
Tang, L.X.2
-
8
-
-
0026883778
-
Inter-process synchronization in steel production
-
C. M. Petersen, K. L. Sorensen, and R. V. V. Vidal, "Inter-process synchronization in steel production," Int. J. Prod. Res., vol.30, no.6, pp. 1415-1425, 1992.
-
(1992)
Int. J. Prod. Res.
, vol.30
, Issue.6
, pp. 1415-1425
-
-
Petersen, C.M.1
Sorensen, K.L.2
Vidal, R.V.V.3
-
9
-
-
0031078123
-
Steel production schedule generation
-
I. Assaf, M. Chen, and J. Katzberg, "Steel production schedule generation," Int. J. Prod. Res., vol.35, no.2, pp. 467-477, 1997.
-
(1997)
Int. J. Prod. Res.
, vol.35
, Issue.2
, pp. 467-477
-
-
Assaf, I.1
Chen, M.2
Katzberg, J.3
-
10
-
-
4444324835
-
An agent-oriented approach to resolve the production planning complexities for a modern steel manufacturing system
-
P. P. Mohanty, "An agent-oriented approach to resolve the production planning complexities for a modern steel manufacturing system," Int. J. Adv. Manuf. Technol., vol.24, pp. 199-205, 2004.
-
(2004)
Int. J. Adv. Manuf. Technol.
, vol.24
, pp. 199-205
-
-
Mohanty, P.P.1
-
11
-
-
34249849506
-
A paradigm for the scheduling of a continuous walking beam reheat furnace using a modified genetic algorithm
-
J. S. Broughton, M. Mahfouf, and D. A. Linkens, "A paradigm for the scheduling of a continuous walking beam reheat furnace using a modified genetic algorithm," Mater. Manuf. Process., vol.22, pp. 607-614, 2007.
-
(2007)
Mater. Manuf. Process.
, vol.22
, pp. 607-614
-
-
Broughton, J.S.1
Mahfouf, M.2
Linkens, D.A.3
-
12
-
-
84989487658
-
Heuristics for integer programming using surrogate constraints
-
F. Glover, "Heuristics for integer programming using surrogate constraints," Decision Sci., vol.8, pp. 156-166, 1977.
-
(1977)
Decision Sci.
, vol.8
, pp. 156-166
-
-
Glover, F.1
-
13
-
-
0037292617
-
A tabu scatter search metaheuristic for the arc routing problem
-
P. Greistorfer, "A tabu scatter search metaheuristic for the arc routing problem," Comput. Ind. Eng., vol.44, pp. 249-266, 2003.
-
(2003)
Comput. Ind. Eng.
, vol.44
, pp. 249-266
-
-
Greistorfer, P.1
-
14
-
-
25444507750
-
Scatter search for the vehicle routing problem with time windows
-
R. A. Russell and W. C. Chiang, "Scatter search for the vehicle routing problem with time windows," Euro. J. Oper. Res., vol.169, pp. 606-622, 2006.
-
(2006)
Euro. J. Oper. Res.
, vol.169
, pp. 606-622
-
-
Russell, R.A.1
Chiang, W.C.2
-
15
-
-
25444486755
-
Some aspects of scatter search in the flow-shop problem
-
E. Nowicki and C. Smutnicki, "Some aspects of scatter search in the flow-shop problem," Eur. J. Oper. Res., vol.169, pp. 654-666, 2006.
-
(2006)
Eur. J. Oper. Res.
, vol.169
, pp. 654-666
-
-
Nowicki, E.1
Smutnicki, C.2
-
16
-
-
0034818087
-
Variable neighborhood search: Principles and applications
-
P. Hansen and N. Mladenović, "Variable neighborhood search: Principles and applications," Euro. J. Oper. Res., vol.130, pp. 440-467, 2001.
-
(2001)
Euro. J. Oper. Res.
, vol.130
, pp. 440-467
-
-
Hansen, P.1
Mladenović, N.2
|