메뉴 건너뛰기




Volumn 47, Issue 6, 2011, Pages 1194-1209

Spare parts demand: Linking forecasting to equipment maintenance

Author keywords

Delay time; Forecasting; Inventory management; Maintenance; Spare parts

Indexed keywords

DEMAND ANALYSIS; FORECASTING METHOD; MAINTENANCE; MODELING; TRANSPORTATION SYSTEM;

EID: 79960949358     PISSN: 13665545     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.tre.2011.04.008     Document Type: Article
Times cited : (88)

References (48)
  • 2
    • 0027611160 scopus 로고
    • Steady-state approximation of a multi-echelon multi-indentured repairable-item inventory system with a single repair facility
    • Albright S.C., Gupta A. Steady-state approximation of a multi-echelon multi-indentured repairable-item inventory system with a single repair facility. Naval Research Logistics 1993, 40:479-493.
    • (1993) Naval Research Logistics , vol.40 , pp. 479-493
    • Albright, S.C.1    Gupta, A.2
  • 3
    • 0030145052 scopus 로고    scopus 로고
    • Joint optimization of maintenance and inventory policies for a simple system
    • Armstrong M., Atkins D. Joint optimization of maintenance and inventory policies for a simple system. IIE Transactions 1996, 28:415-424.
    • (1996) IIE Transactions , vol.28 , pp. 415-424
    • Armstrong, M.1    Atkins, D.2
  • 4
    • 0000936628 scopus 로고
    • Determining the delay time distribution of faults in repairable machinery from failure data
    • Baker R.D., Wang W. Determining the delay time distribution of faults in repairable machinery from failure data. IMA Journal of Mathematics Applied in Business and Industry 1991, 3:259-282.
    • (1991) IMA Journal of Mathematics Applied in Business and Industry , vol.3 , pp. 259-282
    • Baker, R.D.1    Wang, W.2
  • 6
    • 84951780417 scopus 로고    scopus 로고
    • Forecasting for inventory management of service parts
    • Springer Verlag, London, D.N.P. Murthy, K.A.H. Kobbacy (Eds.)
    • Boylan J.E., Syntetos A.A. Forecasting for inventory management of service parts. Complex System Maintenance Handbook 2008, 479-508. Springer Verlag, London. D.N.P. Murthy, K.A.H. Kobbacy (Eds.).
    • (2008) Complex System Maintenance Handbook , pp. 479-508
    • Boylan, J.E.1    Syntetos, A.A.2
  • 7
    • 0037333176 scopus 로고    scopus 로고
    • A joint optimization of block-replacement and periodic-review spare-provisioning policy
    • Brezavšček A., Hudoklin A. A joint optimization of block-replacement and periodic-review spare-provisioning policy. IEEE Transactions in Reliability 2003, 52:112-117.
    • (2003) IEEE Transactions in Reliability , vol.52 , pp. 112-117
    • Brezavšček, A.1    Hudoklin, A.2
  • 9
    • 0033366210 scopus 로고    scopus 로고
    • Developments in delay time analysis for modelling plant maintenance
    • Christer A.H. Developments in delay time analysis for modelling plant maintenance. Journal of the Operational Research Society 1999, 50:1120-1137.
    • (1999) Journal of the Operational Research Society , vol.50 , pp. 1120-1137
    • Christer, A.H.1
  • 13
    • 0015401407 scopus 로고
    • Forecasting and stock control for intermittent demand
    • Croston J.D. Forecasting and stock control for intermittent demand. Operational Research Quarterly 1972, 23:289-303.
    • (1972) Operational Research Quarterly , vol.23 , pp. 289-303
    • Croston, J.D.1
  • 16
    • 0030106093 scopus 로고    scopus 로고
    • Applications of maintenance optimization models: a review and analysis
    • Dekker R. Applications of maintenance optimization models: a review and analysis. Reliability Engineering and System Safety 1996, 51:229-240.
    • (1996) Reliability Engineering and System Safety , vol.51 , pp. 229-240
    • Dekker, R.1
  • 17
    • 0028417245 scopus 로고
    • Base stock level determination for higher cost low demand critical repairable spares
    • Dhakar T., Schmidt C., Miller D. Base stock level determination for higher cost low demand critical repairable spares. Computers and Operational Research 1994, 21:411-420.
    • (1994) Computers and Operational Research , vol.21 , pp. 411-420
    • Dhakar, T.1    Schmidt, C.2    Miller, D.3
  • 23
    • 0030570073 scopus 로고    scopus 로고
    • A stocking policy for spare part provisioning under age-based preventive replacement
    • Kabir A.B.M.Z., Al-Olayan A.S. A stocking policy for spare part provisioning under age-based preventive replacement. European Journal of Operational Research 1996, 90:171-181.
    • (1996) European Journal of Operational Research , vol.90 , pp. 171-181
    • Kabir, A.B.M.Z.1    Al-Olayan, A.S.2
  • 25
    • 0000566609 scopus 로고    scopus 로고
    • Optimal algorithm to determine the spare inventory level for a repairable-item inventory system
    • Kim J., Shin K., Yu H. Optimal algorithm to determine the spare inventory level for a repairable-item inventory system. Computers and Operational Research 1996, 23:289-297.
    • (1996) Computers and Operational Research , vol.23 , pp. 289-297
    • Kim, J.1    Shin, K.2    Yu, H.3
  • 27
    • 0000377390 scopus 로고
    • Managing repairable item inventory systems: a review
    • Nahmias S. Managing repairable item inventory systems: a review. TIMS Studies in the Management Sciences 1981, 16:253-277.
    • (1981) TIMS Studies in the Management Sciences , vol.16 , pp. 253-277
    • Nahmias, S.1
  • 28
    • 84951776319 scopus 로고    scopus 로고
    • Optimal maintenance of multi-component systems: a review
    • Springer Verlag, London, D.N.P. Murthy, K.A.H. Kobbacy (Eds.)
    • Nicolai R.P., Dekker R. Optimal maintenance of multi-component systems: a review. Complex System Maintenance Handbook 2008, 263-286. Springer Verlag, London. D.N.P. Murthy, K.A.H. Kobbacy (Eds.).
    • (2008) Complex System Maintenance Handbook , pp. 263-286
    • Nicolai, R.P.1    Dekker, R.2
  • 30
    • 34548447487 scopus 로고    scopus 로고
    • An inventory control system for spare parts at a refinery: an empirical comparison of different reorder point methods
    • Porras E.M., Dekker R. An inventory control system for spare parts at a refinery: an empirical comparison of different reorder point methods. European Journal of Operational Research 2008, 184:101-132.
    • (2008) European Journal of Operational Research , vol.184 , pp. 101-132
    • Porras, E.M.1    Dekker, R.2
  • 32
    • 0037314597 scopus 로고    scopus 로고
    • Block replacement policies for a two-component system with failure dependence
    • Scarf P.A., Deara M. Block replacement policies for a two-component system with failure dependence. Naval Research Logistics 2003, 50:70-87.
    • (2003) Naval Research Logistics , vol.50 , pp. 70-87
    • Scarf, P.A.1    Deara, M.2
  • 33
    • 0023347045 scopus 로고
    • Forecasting and inventory control for sporadic demand under periodic review
    • Schultz C.R. Forecasting and inventory control for sporadic demand under periodic review. Journal of the Operational Research Society 1987, 38:453-458.
    • (1987) Journal of the Operational Research Society , vol.38 , pp. 453-458
    • Schultz, C.R.1
  • 35
    • 0017948545 scopus 로고
    • Optimum solution structure for a repairable inventory problem
    • Simpson V.P. Optimum solution structure for a repairable inventory problem. Operations Research 1978, 26:270-281.
    • (1978) Operations Research , vol.26 , pp. 270-281
    • Simpson, V.P.1
  • 41
    • 0022876354 scopus 로고
    • A survey of maintenance and replacement models for maintainability and reliability of multi-item systems
    • Thomas L.C. A survey of maintenance and replacement models for maintainability and reliability of multi-item systems. Reliability Engineering and System Safety 1986, 16:297-309.
    • (1986) Reliability Engineering and System Safety , vol.16 , pp. 297-309
    • Thomas, L.C.1
  • 42
    • 0037118559 scopus 로고    scopus 로고
    • A survey of maintenance policies of deteriorating systems
    • Wang H.Z. A survey of maintenance policies of deteriorating systems. European Journal of Operational Research 2002, 139:469-489.
    • (2002) European Journal of Operational Research , vol.139 , pp. 469-489
    • Wang, H.Z.1
  • 43
    • 84951861240 scopus 로고    scopus 로고
    • Delay time modelling
    • Springer Verlag, London, D.N.P. Murthy, K.A.H. Kobbacy (Eds.)
    • Wang W. Delay time modelling. Complex System Maintenance Handbook 2008, 345-370. Springer Verlag, London. D.N.P. Murthy, K.A.H. Kobbacy (Eds.).
    • (2008) Complex System Maintenance Handbook , pp. 345-370
    • Wang, W.1
  • 44
    • 84873895598 scopus 로고    scopus 로고
    • Condition based maintenance modelling
    • Springer Verlag, London, D.N.P. Murthy, K.A.H. Kobbacy (Eds.)
    • Wang W. Condition based maintenance modelling. Complex System Maintenance Handbook 2008, 111-132. Springer Verlag, London. D.N.P. Murthy, K.A.H. Kobbacy (Eds.).
    • (2008) Complex System Maintenance Handbook , pp. 111-132
    • Wang, W.1
  • 45
    • 0037211716 scopus 로고    scopus 로고
    • Solution algorithms for a nonhomogeneous multi-component inspection model
    • Wang W., Christer A.H. Solution algorithms for a nonhomogeneous multi-component inspection model. Computers and Operational Research 2003, 30:190-234.
    • (2003) Computers and Operational Research , vol.30 , pp. 190-234
    • Wang, W.1    Christer, A.H.2
  • 46
    • 79951957429 scopus 로고    scopus 로고
    • A multi-component and multi-failure mode inspection model based on the delay time concept
    • Wang W., Banjevic D., Pecht M.G. A multi-component and multi-failure mode inspection model based on the delay time concept. Reliability Engineering and System Safety 2010, 95:912-920.
    • (2010) Reliability Engineering and System Safety , vol.95 , pp. 912-920
    • Wang, W.1    Banjevic, D.2    Pecht, M.G.3
  • 47
  • 48
    • 0022737451 scopus 로고
    • Economically optimum maintenance, repair and buffering operations in manufacturing operations
    • Yeralan S., Dieck A.J., Darwin R.F. Economically optimum maintenance, repair and buffering operations in manufacturing operations. Engineering Economics 1986, 31:279-292.
    • (1986) Engineering Economics , vol.31 , pp. 279-292
    • Yeralan, S.1    Dieck, A.J.2    Darwin, R.F.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.