-
1
-
-
79959626913
-
Scheduling asset maintenance and technology insertions, to appear in complex engineering service systems
-
Ng I, Parry G, Wild P, McFarlane D, editors. Amsterdam: Springer
-
Wang W, Carr M. Scheduling asset maintenance and technology insertions, to appear in complex engineering service systems. In: Ng I, Parry G, Wild P, McFarlane D, editors. Concepts and research. Amsterdam: Springer; 2010.
-
(2010)
Concepts and Research
-
-
Wang, W.1
Carr, M.2
-
2
-
-
0033366210
-
Developments in delay time analysis for modeling plant maintenance
-
Christer AH. Developments in delay time analysis for modeling plant maintenance. J Oper Res Soc 1999; 50: 1 120-37.
-
(1999)
J Oper Res Soc
, vol.50
, Issue.1
, pp. 120-137
-
-
Christer, A.H.1
-
3
-
-
79955522512
-
Stochastic maintenance modelling of high-tech steel production plant
-
Stochastic Modelling in Innovative Manufacturing
-
Christer AH, Wang W, Sharp JM, Baker RD. A stochastic modelling problem of high-tech steel production plant. In: Christer AH, ShunjiOsaki B, Thomas LC, editors. Stochastic modelling in innovative manufacturing, lecture notes in economics and mathematical systems. Berlin: Springer; 1997. p. 196-214. (Pubitemid 127013683)
-
(1997)
Lecture Notes in Economics and Mathematical Systems
, Issue.445
, pp. 196-214
-
-
Christer, A.H.1
Wang, W.2
Sharp, J.M.3
Baker, R.D.4
-
5
-
-
79955523430
-
Optimal maintenance of multi-component systems: A review
-
Murthy DNP, Kobbacy AKS, editors. Amsterdam: Springer
-
Nicola RP, Dekker R. Optimal maintenance of multi-component systems: a review. In: Murthy DNP, Kobbacy AKS, editors. Complex system maintenance handbook. Amsterdam: Springer; 2008.
-
(2008)
Complex System Maintenance Handbook
-
-
Nicola, R.P.1
Dekker, R.2
-
8
-
-
0002382158
-
Modelling maintenance practice of production plant using the delay-time concept
-
Christer AH, Wang W, Baker RD, Sharp JM. Modelling maintenance practice of production plant using the delay-time concept. IMA J Management Maths 1995; 6: 67-83.
-
(1995)
IMA J Management Maths
, vol.6
, pp. 67-83
-
-
Christer, A.H.1
Wang, W.2
Baker, R.D.3
Sharp, J.M.4
-
9
-
-
84984729357
-
The delay-time modelling of preventive maintenance of plant given limited PM data and selective repair at PM
-
Christer AH, Wang W, Choi J.M. Sharp K. The delay-time modelling of preventive maintenance of plant given limited PM data and selective repair at PM. IMAJ Maths Appl Bus Ind 1998; 9: 355-79.
-
(1998)
IMAJ Maths Appl Bus Ind
, vol.9
, pp. 355-379
-
-
Christer, A.H.1
Wang, W.2
Choi, J.M.3
Sharp, K.4
-
10
-
-
0034882249
-
A maintenance study of fishing vessel equipment using delay-time analysis
-
Pillay A, Wang J, Wall AD, Ruxton T. A maintenance study of fishing vessel equipment using delay-time analysis. J Qual Maint Eng 2001 ; 7(2): 118-28.
-
(2001)
J Qual Maint Eng
, vol.7
, Issue.2
, pp. 118-128
-
-
Pillay, A.1
Wang, J.2
Wall, A.D.3
Ruxton, T.4
-
11
-
-
36248964035
-
Problem identification in maintenance modelling: A case study
-
DOI 10.1080/00207540600960708, PII 770289054
-
Akbarov A, Wang W, Christer AH. Problem identification in the frame of maintenance modelling: a case study. Int J Prod Res 2008; 46(4): 1031-46. (Pubitemid 350136930)
-
(2008)
International Journal of Production Research
, vol.46
, Issue.4
, pp. 1031-1046
-
-
Akbarov, A.1
Christer, A.H.2
Wang, W.3
-
12
-
-
54049122253
-
A delay time model with safety constrain
-
Aven T, Castro IT. A delay time model with safety constraint. Reliab Eng Syst Saf2009; 94: 261-7.
-
(2009)
Reliab Eng Syst Saf
, vol.94
, pp. 261-267
-
-
Aven, T.1
Castro, I.T.2
-
13
-
-
52149111376
-
Methodology of using delay time analysis for a manufacturing industry
-
Jones B, Jenkinson I, WangJ. Methodology of using delay time analysis for a manufacturing industry. Reliab Eng Syst Saf 2009; 94: 1 11-24.
-
(2009)
Reliab Eng Syst Saf
, vol.94
, Issue.1
, pp. 11-24
-
-
Jones, B.1
Jenkinson, I.2
Wang, J.3
-
14
-
-
84951861240
-
Delay time modelling
-
Murthy DNP, Kobbacy AKS, editors. Amsterdam: Springer
-
Wang W. Delay time modelling. In: Murthy DNP, Kobbacy AKS, editors. Complex system maintenance handbook. Amsterdam: Springer; 2008. p. 345-70.
-
(2008)
Complex System Maintenance Handbook
, pp. 345-370
-
-
Wang, W.1
-
15
-
-
70249095894
-
Solution algorithms for a multi-component system inspection model
-
Wang W, Christer AH. Solution algorithms for a multi-component system inspection model. Comput Oper Res 2003; 30: 134-34-190.
-
(2003)
Comput Oper Res
, vol.30
, Issue.134
, pp. 34-190
-
-
Wang, W.1
Christer, A.H.2
-
16
-
-
0034004936
-
A model of multiple nested inspections at different intervals
-
DOI 10.1016/S0305-0548(99)00046-5, PII S0305054899000465
-
Wang W. A model of multiple nested inspections at different intervals. Comput Oper Res 2000; 27(6): 539-58. (Pubitemid 30218483)
-
(2000)
Computers and Operations Research
, vol.27
, Issue.6
, pp. 539-558
-
-
Wang, W.1
-
17
-
-
54049085316
-
An inspection model for a process with two types of inspections and repairs
-
Wang W. An inspection model for a process with two types of inspections and repairs. Reliab Eng Syst Saf 2009; 94: 526-33.
-
(2009)
Reliab Eng Syst Saf
, vol.94
, pp. 526-533
-
-
Wang, W.1
-
18
-
-
0000936628
-
Determining the delay time distribution of faults in repairable machinery from failure data
-
Baker RD, Wang W.
-
Baker RD, Wang W. Determining the delay time distribution of faults in repairable machinery from failure data. IMA J Maths Appl Business Ind 1991; 3: 259-82.
-
(1991)
IMA J Maths Appl Business Ind
, vol.3
, pp. 259-282
-
-
-
20
-
-
0031176944
-
A modelling procedure to optimize component safety inspecton over a finite time horizon
-
Wang W, Christer AH. A modelling procedure to optimise component safety inspection over a finite time horizon. Quality Reliab Eng Int 1997; 13: 217-24. (Pubitemid 127624230)
-
(1997)
Quality and Reliability Engineering International
, vol.13
, Issue.4
, pp. 217-224
-
-
Wang, W.1
Christer, A.H.2
-
21
-
-
0004291893
-
-
London: Chapman and Hall
-
Cox DR. Renewal theory. London: Chapman and Hall; 1962.
-
(1962)
Renewal Theory
-
-
Cox, D.R.1
|