메뉴 건너뛰기




Volumn 8, Issue 2, 2011, Pages 175-197

Analysis and estimation of complexity level in industrial firms

Author keywords

Complexity of manufacturing systems; Performance measurements

Indexed keywords

FUZZY LOGIC; INDUSTRIAL MANAGEMENT; MANUFACTURE;

EID: 79960677761     PISSN: 17485037     EISSN: 17485045     Source Type: Journal    
DOI: 10.1504/IJISE.2011.041368     Document Type: Article
Times cited : (26)

References (29)
  • 3
    • 85010443343 scopus 로고    scopus 로고
    • Interaction-based complexity measures of manufacturing systems using information entropy
    • Cho, S., Alamoudi, R. and Asfour, S. (2009) 'Interaction-based complexity measures of manufacturing systems using information entropy', Int. J. Computer Integrated Manufacturing, Vol. 22, No. 10, pp.909-922.
    • (2009) Int. J. Computer Integrated Manufacturing , vol.22 , Issue.10 , pp. 909-922
    • Cho, S.1    Alamoudi, R.2    Asfour, S.3
  • 5
    • 0036609476 scopus 로고    scopus 로고
    • A web-based expert system to assess the complexity of manufacturing organizations
    • DOI 10.1016/S0736-5845(02)00022-4, PII S0736584502000224
    • Efstathiou, J., Calinescu, A. and Blackburn, G. (2002) 'A web-based expert system to assess the complexity of manufacturing organizations', Robotics and Computer Integrated Manufacturing, Vol. 18, pp.305-311. (Pubitemid 34704289)
    • (2002) Robotics and Computer-Integrated Manufacturing , vol.18 , Issue.3-4 , pp. 305-311
    • Efstathiou, J.1    Calinescu, A.2    Blackburn, G.3
  • 6
    • 0042844580 scopus 로고    scopus 로고
    • Modeling of manufacturing systems complexity
    • ElMaraghy, W.H. and Urbanic, R.J. (2003) 'Modeling of manufacturing systems complexity', Annals of the CIRP, Vol. 53, No. 1, pp.363-366.
    • (2003) Annals of the CIRP , vol.53 , Issue.1 , pp. 363-366
    • Elmaraghy, W.H.1    Urbanic, R.J.2
  • 7
    • 3142703657 scopus 로고    scopus 로고
    • Assessment of manufacturing complexity
    • ElMaraghy, W.H. and Urbanic, R.J. (2004) 'Assessment of manufacturing complexity', Annals of the CIRP, Vol. 53, No. 1, pp.401-406.
    • (2004) Annals of the CIRP , vol.53 , Issue.1 , pp. 401-406
    • Elmaraghy, W.H.1    Urbanic, R.J.2
  • 9
    • 3543083292 scopus 로고
    • Measuring complexity as an aid to developing operational strategy
    • DOI 10.1108/01443579510083640
    • Frizelle, G. and Woodcock, E. (1995) 'Measuring complexity as an aid to developing operational strategy', Int. J. Operations and Production Management, Vol. 15, No. 5, pp.26-39. (Pubitemid 39026051)
    • (1995) International Journal of Operations and Production Management , vol.15 , Issue.5 , pp. 26-39
    • Frizelle, G.1    Woodcock, E.2
  • 12
    • 0042363455 scopus 로고    scopus 로고
    • Analysis of the structural measures of flexibility and agility using a measurement theoretical framework
    • Giachetti, R.E., Martinez, L.D., Saenz, O.A. and Chen, C-S. (2003) 'Analysis of the structural measures of flexibility and agility using a measurement theoretical framework', Int. J. Production Economics, Vol. 86, pp.47-62.
    • (2003) Int. J. Production Economics , vol.86 , pp. 47-62
    • Giachetti, R.E.1    Martinez, L.D.2    Saenz, O.A.3    Chen, C.-S.4
  • 13
    • 0031272625 scopus 로고    scopus 로고
    • Product structure complexity and scheduling of operations in recoverable manufacturing
    • Guide, V.D.R., Srivastava, R. and Kraus, M.E. (1997) 'Product structure complexity and scheduling of operations in recoverable manufacturing', Int. J. Production Research, Vol. 35, No. 1, pp.3179-3199. (Pubitemid 127549660)
    • (1997) International Journal of Production Research , vol.35 , Issue.11 , pp. 3179-3199
    • Guide Jr., V.D.R.1    Srivastava, R.2    Kraus, M.E.3
  • 14
    • 43649090571 scopus 로고    scopus 로고
    • Product variety and manufacturing complexity in assembly systems and supply chains
    • Hu, S.J., Zhu, X. and Koren, W.Y. (2008) 'Product variety and manufacturing complexity in assembly systems and supply chains', Annals of the CIRP, Manufacturing Technology,Vol. 57, pp.45-48.
    • (2008) Annals of the CIRP, Manufacturing Technology , vol.57 , pp. 45-48
    • Hu, S.J.1    Zhu, X.2    Koren, W.Y.3
  • 15
    • 70449579437 scopus 로고    scopus 로고
    • Comparing the impact of different rescheduling strategies on the entropic-related complexity of manufacturing systems
    • Huatuco, L.H., Efstathiou, J., Calinescu, A., Sivadasan, S. and Kariuki, S. (2009) 'Comparing the impact of different rescheduling strategies on the entropic-related complexity of manufacturing systems', Int. J. Production Research, Vol. 47, No. 1, pp.4305-4325.
    • (2009) Int. J. Production Research , vol.47 , Issue.1 , pp. 4305-4325
    • Huatuco, L.H.1    Efstathiou, J.2    Calinescu, A.3    Sivadasan, S.4    Kariuki, S.5
  • 16
    • 84861916561 scopus 로고    scopus 로고
    • Manufacturing complexity analysis: A simulation-based methodology-collaboration engineering
    • A.K. Karmrani and E.A. Nasr (Eds.), New York, NY, USA: Springer
    • Kamrani, A.K. and Adat, A. (2008) 'Manufacturing complexity analysis: a simulation-based methodology-collaboration engineering', in A.K. Karmrani and E.A. Nasr (Eds.), Theory and Practice. New York, NY, USA: Springer, pp.227-248.
    • (2008) Theory and Practice , pp. 227-248
    • Kamrani, A.K.1    Adat, A.2
  • 17
    • 33847796598 scopus 로고    scopus 로고
    • Assessing the structural complexity of manufacturing systems configurations
    • DOI 10.1007/s10696-006-9012-2
    • Kuzgunkaya, O. and ElMaraghy, H.A. (2006) 'Assessing the structural complexity of manufacturing systems configurations', Int. J. Flexible Manufacturing Systems, Vol. 18, pp.145-171. (Pubitemid 46389182)
    • (2006) International Journal of Flexible Manufacturing Systems , vol.18 , Issue.2 , pp. 145-171
    • Kuzgunkaya, O.1    ElMaraghy, H.A.2
  • 18
    • 0001130859 scopus 로고
    • Comparison of fuzzy numbers based on the probability measure of fuzzy events
    • Lee, E.S. and Li, R.L. (1988) 'Comparison of fuzzy numbers based on the probability measure of fuzzy events', Computer and Mathematics with Applications, Vol. 15, pp.887-896.
    • (1988) Computer and Mathematics with Applications , vol.15 , pp. 887-896
    • Lee, E.S.1    Li, R.L.2
  • 21
    • 2642582673 scopus 로고    scopus 로고
    • Complexity management and supply chain performance assessment
    • Perona, M. and Miragliotta, G. (2004) 'Complexity management and supply chain performance assessment', Int. J. Production Economics, Vol. 90, pp.103-115.
    • (2004) Int. J. Production Economics , vol.90 , pp. 103-115
    • Perona, M.1    Miragliotta, G.2
  • 22
    • 33746690318 scopus 로고    scopus 로고
    • Applying a fuzzy-morphological approach to complexity within management decision making
    • DOI 10.1108/00251740610680604, Chaos and complexity in business
    • Sharif, A.M. and Irani, Z. (2006) 'Applying a fuzzy morphological approach to complexity within management decision making', Management Decision, Vol. 44, No. 4, pp.930-961. (Pubitemid 44160963)
    • (2006) Management Decision , vol.44 , Issue.7 , pp. 930-961
    • Sharif, A.M.1    Irani, Z.2
  • 24
    • 32044442958 scopus 로고    scopus 로고
    • Complexity in engineering
    • Suh, N.P. (2005) 'Complexity in engineering', The Annals of CIRP, Manufacturing Technology,Vol. 54, No. 2, pp.581-598. (Pubitemid 43199079)
    • (2005) CIRP Annals - Manufacturing Technology , vol.54 , Issue.2 , pp. 581-598
    • Suh, N.P.1
  • 27
    • 33845481798 scopus 로고    scopus 로고
    • A study on the cost of operational complexity in customer-supplier systems
    • DOI 10.1016/j.ijpe.2006.06.004, PII S0925527306001575
    • Wu, Y., Frizelle, G. and Efstathiou, J. (2007) 'A study on the cost of operational complexity in customer-supplier systems', Int. J. Production Economics, Vol. 106, pp.217-229. (Pubitemid 44918294)
    • (2007) International Journal of Production Economics , vol.106 , Issue.1 , pp. 217-229
    • Wu, Y.1    Frizelle, G.2    Efstathiou, J.3
  • 28
    • 74549161516 scopus 로고    scopus 로고
    • A new complexity proof for the two-stage hybrid flow shop scheduling problem with dedicated machines
    • Yang, J. (2010) 'A new complexity proof for the two-stage hybrid flow shop scheduling problem with dedicated machines', Int. J. Production Research, Vol. 48, No. 5, pp.1531-1538.
    • (2010) Int. J. Production Research , vol.48 , Issue.5 , pp. 1531-1538
    • Yang, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.