메뉴 건너뛰기




Volumn 23, Issue 2, 2011, Pages 90-110

Optimising a coal rail network under capacity constraints

Author keywords

Blocking; Coal train scheduling; Job shop; Parallel machine; Tabu search

Indexed keywords

AUSTRALIA; BLOCKING; CAPACITY CONSTRAINTS; CONSTRUCTIVE ALGORITHMS; GENERIC SOLUTIONS; HYBRID ALGORITHMS; JOB-SHOP; JOB-SHOP SCHEDULING; LOWER BOUNDS; MAKESPAN; META HEURISTIC ALGORITHM; NEIGHBOURHOOD; PARALLEL-MACHINE; RAIL NETWORKS; RAIL SYSTEMS; SCHEDULING PROBLEM; TERMINAL CAPACITY; TRAIN SCHEDULE; TRAIN SCHEDULING; TRAIN TIMETABLES;

EID: 79960558930     PISSN: 19366582     EISSN: 19366590     Source Type: Journal    
DOI: 10.1007/s10696-010-9069-9     Document Type: Review
Times cited : (25)

References (29)
  • 3
    • 33646681684 scopus 로고    scopus 로고
    • Techniques for absolute capacity determination in railways
    • DOI 10.1016/j.trb.2005.09.004, PII S0191261505001037
    • RL Burdett E Kozan 2006 Techniques for absolute capacity determination in railways Transp Res B 40 616 632 10.1016/j.trb.2005.09.004 (Pubitemid 43733295)
    • (2006) Transportation Research Part B: Methodological , vol.40 , Issue.8 , pp. 616-632
    • Burdett, R.L.1    Kozan, E.2
  • 4
    • 69249227506 scopus 로고    scopus 로고
    • Development of a disjunctive graph model and constructive algorithms for train scheduling
    • Burdett R, Kozan E (2010) Development of a disjunctive graph model and constructive algorithms for train scheduling. Eur J Oper Res 2001:85-98
    • (2010) Eur J Oper Res , vol.2001 , pp. 85-98
    • Burdett, R.1    Kozan, E.2
  • 5
    • 43949092779 scopus 로고    scopus 로고
    • A column generation approach to train timetabling on a corridor
    • 2407174 1151.90323 10.1007/s10288-007-0037-5
    • V Cacchiani A Caprara P Toth 2008 A column generation approach to train timetabling on a corridor Quart J Oper Res 6 125 142 2407174 1151.90323 10.1007/s10288-007-0037-5
    • (2008) Quart J Oper Res , vol.6 , pp. 125-142
    • Cacchiani, V.1    Caprara, A.2    Toth, P.3
  • 6
    • 0028436769 scopus 로고
    • A fast heuristic for the train scheduling problem
    • 0799.90068 10.1016/0305-0548(94)90099-X
    • X Cai CJ Goh 1994 A fast heuristic for the train scheduling problem Comput Oper Res 21 5 499 511 0799.90068 10.1016/0305-0548(94)90099-X
    • (1994) Comput Oper Res , vol.21 , Issue.5 , pp. 499-511
    • Cai, X.1    Goh, C.J.2
  • 7
    • 0036759198 scopus 로고    scopus 로고
    • Modelling and solving the train timetabling problem
    • 1923705 1163.90482 10.1287/opre.50.5.851.362
    • A Caprara M Fischetti P Toth 2002 Modelling and solving the train timetabling problem Oper Res 50 851 861 1923705 1163.90482 10.1287/opre.50.5. 851.362
    • (2002) Oper Res , vol.50 , pp. 851-861
    • Caprara, A.1    Fischetti, M.2    Toth, P.3
  • 8
    • 0035742367 scopus 로고    scopus 로고
    • An optimization based approach to the train operator scheduling problem at Singapore MRT
    • DOI 10.1023/A:1016002910561
    • KL Chew J Pang QZ Liu JH Ou CP Teo 2001 An optimization based approach to the train operator scheduling problem at Singapore MRT Ann Oper Res 108 1 111 118 0993.90501 10.1023/A:1016002910561 (Pubitemid 33640264)
    • (2001) Annals of Operations Research , vol.108 , Issue.1-4 , pp. 111-122
    • Chew, K.-L.1    Pang, J.2    Liu, Q.3    Ou, J.4    Teo, C.-P.5
  • 9
    • 34249982545 scopus 로고    scopus 로고
    • A branch and bound algorithm for scheduling trains in a railway network
    • DOI 10.1016/j.ejor.2006.10.034, PII S0377221706010678
    • A D'Ariano D Pacciarelli M Pranzo 2007 A branch and bound algorithm for scheduling trains in a railway network Eur J Oper Res 183 643 657 1179.90135 10.1016/j.ejor.2006.10.034 (Pubitemid 46891151)
    • (2007) European Journal of Operational Research , vol.183 , Issue.2 , pp. 643-657
    • D'Ariano, A.1    Pacciarelli, D.2    Pranzo, M.3
  • 10
    • 38849099559 scopus 로고    scopus 로고
    • Assessment of flexible timetables in real-time traffic management of a railway bottleneck
    • DOI 10.1016/j.trc.2007.07.006, PII S0968090X07000587
    • A D'Ariano D Pacciarelli M Pranzo 2008 Assessment of flexible timetables in real-time traffic management of a railway bottleneck Transp Res C 16 232 245 10.1016/j.trc.2007.07.006 (Pubitemid 351194174)
    • (2008) Transportation Research Part C: Emerging Technologies , vol.16 , Issue.2 , pp. 232-245
    • D'Ariano, A.1    Pacciarelli, D.2    Pranzo, M.3
  • 11
    • 0142156064 scopus 로고    scopus 로고
    • Scheduling trains on a railway network using a discrete event model of railway traffic
    • DOI 10.1016/S0191-2615(03)00006-7
    • MJ Dorfman J Medanic 2004 Scheduling trains on a railway network using a discrete event model of railway traffic Transp Res B 38 81 98 10.1016/S0191-2615(03)00006-7 (Pubitemid 37312603)
    • (2004) Transportation Research Part B: Methodological , vol.38 , Issue.1 , pp. 81-98
    • Dorfman, M.J.1    Medanic, J.2
  • 12
    • 0029492031 scopus 로고
    • Modelling delay risks associated with a train schedule
    • 10.1080/03081069508717561
    • A Higgins L Ferreira E Kozan 1995 Modelling delay risks associated with a train schedule Transp Plann Technol 19 2 89 108 10.1080/03081069508717561
    • (1995) Transp Plann Technol , vol.19 , Issue.2 , pp. 89-108
    • Higgins, A.1    Ferreira, L.2    Kozan, E.3
  • 15
    • 0042545904 scopus 로고    scopus 로고
    • Modelling the number and location of sidings on a single line railway
    • PII S0305454896000421
    • A Higgins E Kozan L Ferreira 1997 Modelling the number and location of sidings on a single line railway Comput Oper Res 24 3 209 220 0889.90062 10.1016/S0305-0548(96)00042-1 (Pubitemid 127707150)
    • (1997) Computers and Operations Research , vol.24 , Issue.3 , pp. 209-220
    • Higgins, A.1    Kozan, E.2    Ferreira, L.3
  • 16
    • 0031234257 scopus 로고    scopus 로고
    • Heuristic techniques for single line train scheduling
    • A Higgins E Kozan L Ferreira 1997 Heuristic techniques for single line train scheduling J Heuristics 3 43 62 1071.90535 10.1023/A:1009672832658 (Pubitemid 127509036)
    • (1997) Journal of Heuristics , vol.3 , Issue.1 , pp. 43-62
    • Higgins, A.1    Kozan, E.2    Ferreira, L.3
  • 17
    • 14644427856 scopus 로고    scopus 로고
    • A railway capacity determination model and rail access charging methodologies
    • DOI 10.1080/0308106052000340378
    • E Kozan RL Burdett 2005 A railway capacity determination model and rail access charging methodologies Transp Plann Technol 28 1 27 45 10.1080/0308106052000340378 (Pubitemid 40322943)
    • (2005) Transportation Planning and Technology , vol.28 , Issue.1 , pp. 27-45
    • Kozan, E.1    Burdett, R.2
  • 20
    • 58949084435 scopus 로고    scopus 로고
    • Scheduling a flow shop with combined buffer conditions
    • 10.1016/j.ijpe.2008.11.007
    • SQ Liu E Kozan 2009 Scheduling a flow shop with combined buffer conditions Int J Prod Econ 117 371 380 10.1016/j.ijpe.2008.11.007
    • (2009) Int J Prod Econ , vol.117 , pp. 371-380
    • Liu, S.Q.1    Kozan, E.2
  • 21
    • 62549158188 scopus 로고    scopus 로고
    • Scheduling trains as a blocking parallel-machine job shop scheduling problem
    • 2586552 1160.90476 10.1016/j.cor.2008.12.012
    • SQ Liu E Kozan 2009 Scheduling trains as a blocking parallel-machine job shop scheduling problem Comput Oper Res 36 2840 2852 2586552 1160.90476 10.1016/j.cor.2008.12.012
    • (2009) Comput Oper Res , vol.36 , pp. 2840-2852
    • Liu, S.Q.1    Kozan, E.2
  • 22
    • 79957454187 scopus 로고    scopus 로고
    • Scheduling trains with priorities: A no-wait blocking parallel-machine job-shop scheduling model
    • doi: 10.1287/trsc.1100.0332
    • Liu SQ, Kozan E (2010) Scheduling trains with priorities: a no-wait blocking parallel-machine job-shop scheduling model. Transp Sci. doi: 10.1287/trsc.1100.0332
    • (2010) Transp Sci.
    • Liu, S.Q.1    Kozan, E.2
  • 23
    • 0036874125 scopus 로고    scopus 로고
    • A comparative study of algorithms for the flowshop scheduling problem
    • 1956422 1165.90463
    • SQ Liu HL Ong 2002 A comparative study of algorithms for the flowshop scheduling problem Asia Pac J Oper Res 19 205 222 1956422 1165.90463
    • (2002) Asia Pac J Oper Res , vol.19 , pp. 205-222
    • Liu, S.Q.1    Ong, H.L.2
  • 24
    • 4444276809 scopus 로고    scopus 로고
    • Metaheuristics for the mixed shop scheduling problem
    • 2108266 1056.90071 10.1142/S0217595904000072
    • SQ Liu HL Ong 2004 Metaheuristics for the mixed shop scheduling problem Asia Pac J Oper Res 21 4 97 115 2108266 1056.90071 10.1142/S0217595904000072
    • (2004) Asia Pac J Oper Res , vol.21 , Issue.4 , pp. 97-115
    • Liu, S.Q.1    Ong, H.L.2
  • 25
    • 18844386279 scopus 로고    scopus 로고
    • A fast tabu search algorithm for the group shop scheduling problem
    • DOI 10.1016/j.advengsoft.2005.02.002, PII S0965997805000189
    • SQ Liu HL Ong KM Ng 2005 A fast tabu search algorithm for the group shop scheduling problem Adv Eng Softw 36 533 539 1101.68422 10.1016/j.advengsoft. 2004.10.002 (Pubitemid 40682491)
    • (2005) Advances in Engineering Software , vol.36 , Issue.8 , pp. 533-539
    • Liu, S.Q.1    Ong, H.L.2    Ng, K.M.3
  • 26
    • 0042589663 scopus 로고
    • Over the road transit time for a single track railway
    • 10.1287/trsc.8.1.65
    • ER Petersen 1974 Over the road transit time for a single track railway Transp Sci 8 65 74 10.1287/trsc.8.1.65
    • (1974) Transp Sci , vol.8 , pp. 65-74
    • Petersen, E.R.1
  • 27
    • 66749086336 scopus 로고    scopus 로고
    • Mathematical solutions for solving periodic railway transportation
    • doi: 10.1155/2009/728916
    • Salido MA, Barber F (2009) Mathematical solutions for solving periodic railway transportation. Math Prob Eng. doi: 10.1155/2009/728916
    • (2009) Math Prob Eng.
    • Salido, M.A.1    Barber, F.2
  • 28
    • 33847110797 scopus 로고    scopus 로고
    • Domain-dependent distributed models for railway scheduling
    • DOI 10.1016/j.knosys.2006.11.013, PII S0950705106002048, AI 2006
    • MA Salido M Abril F Barber L Ingolotti P Tormos A Lova 2007 Domain-dependent distributed models for railway scheduling Knowl Based Syst 20 186 194 10.1016/j.knosys.2006.11.013 (Pubitemid 46282459)
    • (2007) Knowledge-Based Systems , vol.20 , Issue.2 , pp. 186-194
    • Salido, M.A.1    Abril, M.2    Barber, F.3    Ingolotti, L.4    Tormos, P.5    Lova, A.6
  • 29
    • 13544267417 scopus 로고    scopus 로고
    • Bicriteria train scheduling for high-speed passenger railroad planning applications
    • DOI 10.1016/j.ejor.2004.07.019, PII S037722170400476X, Multicriteria Scheduling
    • X Zhou M Zhong 2004 Bicriteria train scheduling for high-speed passenger railway planning applications Eur J Oper Res 167 752 771 2157069 10.1016/j.ejor.2004.07.019 (Pubitemid 40220089)
    • (2005) European Journal of Operational Research , vol.167 , Issue.3 , pp. 752-771
    • Zhou, X.1    Zhong, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.