-
1
-
-
84858835994
-
Integration of stockyard and rail network: A scheduling case study
-
Paper presented at the Gold Coast, Australia
-
Abdekhodaee A, Dunstall S, Ernst AT, Lam L (2004) Integration of stockyard and rail network: a scheduling case study. Paper presented at the Proceedings of the Fifth Asia Pacific Industrial Engineering and Management Systems Conference, Gold Coast, Australia
-
(2004)
Proceedings of the Fifth Asia Pacific Industrial Engineering and Management Systems Conference
-
-
Abdekhodaee, A.1
Dunstall, S.2
Ernst, A.T.3
Lam, L.4
-
3
-
-
33646681684
-
Techniques for absolute capacity determination in railways
-
DOI 10.1016/j.trb.2005.09.004, PII S0191261505001037
-
RL Burdett E Kozan 2006 Techniques for absolute capacity determination in railways Transp Res B 40 616 632 10.1016/j.trb.2005.09.004 (Pubitemid 43733295)
-
(2006)
Transportation Research Part B: Methodological
, vol.40
, Issue.8
, pp. 616-632
-
-
Burdett, R.L.1
Kozan, E.2
-
4
-
-
69249227506
-
Development of a disjunctive graph model and constructive algorithms for train scheduling
-
Burdett R, Kozan E (2010) Development of a disjunctive graph model and constructive algorithms for train scheduling. Eur J Oper Res 2001:85-98
-
(2010)
Eur J Oper Res
, vol.2001
, pp. 85-98
-
-
Burdett, R.1
Kozan, E.2
-
5
-
-
43949092779
-
A column generation approach to train timetabling on a corridor
-
2407174 1151.90323 10.1007/s10288-007-0037-5
-
V Cacchiani A Caprara P Toth 2008 A column generation approach to train timetabling on a corridor Quart J Oper Res 6 125 142 2407174 1151.90323 10.1007/s10288-007-0037-5
-
(2008)
Quart J Oper Res
, vol.6
, pp. 125-142
-
-
Cacchiani, V.1
Caprara, A.2
Toth, P.3
-
6
-
-
0028436769
-
A fast heuristic for the train scheduling problem
-
0799.90068 10.1016/0305-0548(94)90099-X
-
X Cai CJ Goh 1994 A fast heuristic for the train scheduling problem Comput Oper Res 21 5 499 511 0799.90068 10.1016/0305-0548(94)90099-X
-
(1994)
Comput Oper Res
, vol.21
, Issue.5
, pp. 499-511
-
-
Cai, X.1
Goh, C.J.2
-
7
-
-
0036759198
-
Modelling and solving the train timetabling problem
-
1923705 1163.90482 10.1287/opre.50.5.851.362
-
A Caprara M Fischetti P Toth 2002 Modelling and solving the train timetabling problem Oper Res 50 851 861 1923705 1163.90482 10.1287/opre.50.5. 851.362
-
(2002)
Oper Res
, vol.50
, pp. 851-861
-
-
Caprara, A.1
Fischetti, M.2
Toth, P.3
-
8
-
-
0035742367
-
An optimization based approach to the train operator scheduling problem at Singapore MRT
-
DOI 10.1023/A:1016002910561
-
KL Chew J Pang QZ Liu JH Ou CP Teo 2001 An optimization based approach to the train operator scheduling problem at Singapore MRT Ann Oper Res 108 1 111 118 0993.90501 10.1023/A:1016002910561 (Pubitemid 33640264)
-
(2001)
Annals of Operations Research
, vol.108
, Issue.1-4
, pp. 111-122
-
-
Chew, K.-L.1
Pang, J.2
Liu, Q.3
Ou, J.4
Teo, C.-P.5
-
9
-
-
34249982545
-
A branch and bound algorithm for scheduling trains in a railway network
-
DOI 10.1016/j.ejor.2006.10.034, PII S0377221706010678
-
A D'Ariano D Pacciarelli M Pranzo 2007 A branch and bound algorithm for scheduling trains in a railway network Eur J Oper Res 183 643 657 1179.90135 10.1016/j.ejor.2006.10.034 (Pubitemid 46891151)
-
(2007)
European Journal of Operational Research
, vol.183
, Issue.2
, pp. 643-657
-
-
D'Ariano, A.1
Pacciarelli, D.2
Pranzo, M.3
-
10
-
-
38849099559
-
Assessment of flexible timetables in real-time traffic management of a railway bottleneck
-
DOI 10.1016/j.trc.2007.07.006, PII S0968090X07000587
-
A D'Ariano D Pacciarelli M Pranzo 2008 Assessment of flexible timetables in real-time traffic management of a railway bottleneck Transp Res C 16 232 245 10.1016/j.trc.2007.07.006 (Pubitemid 351194174)
-
(2008)
Transportation Research Part C: Emerging Technologies
, vol.16
, Issue.2
, pp. 232-245
-
-
D'Ariano, A.1
Pacciarelli, D.2
Pranzo, M.3
-
11
-
-
0142156064
-
Scheduling trains on a railway network using a discrete event model of railway traffic
-
DOI 10.1016/S0191-2615(03)00006-7
-
MJ Dorfman J Medanic 2004 Scheduling trains on a railway network using a discrete event model of railway traffic Transp Res B 38 81 98 10.1016/S0191-2615(03)00006-7 (Pubitemid 37312603)
-
(2004)
Transportation Research Part B: Methodological
, vol.38
, Issue.1
, pp. 81-98
-
-
Dorfman, M.J.1
Medanic, J.2
-
12
-
-
0029492031
-
Modelling delay risks associated with a train schedule
-
10.1080/03081069508717561
-
A Higgins L Ferreira E Kozan 1995 Modelling delay risks associated with a train schedule Transp Plann Technol 19 2 89 108 10.1080/03081069508717561
-
(1995)
Transp Plann Technol
, vol.19
, Issue.2
, pp. 89-108
-
-
Higgins, A.1
Ferreira, L.2
Kozan, E.3
-
15
-
-
0042545904
-
Modelling the number and location of sidings on a single line railway
-
PII S0305454896000421
-
A Higgins E Kozan L Ferreira 1997 Modelling the number and location of sidings on a single line railway Comput Oper Res 24 3 209 220 0889.90062 10.1016/S0305-0548(96)00042-1 (Pubitemid 127707150)
-
(1997)
Computers and Operations Research
, vol.24
, Issue.3
, pp. 209-220
-
-
Higgins, A.1
Kozan, E.2
Ferreira, L.3
-
16
-
-
0031234257
-
Heuristic techniques for single line train scheduling
-
A Higgins E Kozan L Ferreira 1997 Heuristic techniques for single line train scheduling J Heuristics 3 43 62 1071.90535 10.1023/A:1009672832658 (Pubitemid 127509036)
-
(1997)
Journal of Heuristics
, vol.3
, Issue.1
, pp. 43-62
-
-
Higgins, A.1
Kozan, E.2
Ferreira, L.3
-
17
-
-
14644427856
-
A railway capacity determination model and rail access charging methodologies
-
DOI 10.1080/0308106052000340378
-
E Kozan RL Burdett 2005 A railway capacity determination model and rail access charging methodologies Transp Plann Technol 28 1 27 45 10.1080/0308106052000340378 (Pubitemid 40322943)
-
(2005)
Transportation Planning and Technology
, vol.28
, Issue.1
, pp. 27-45
-
-
Kozan, E.1
Burdett, R.2
-
20
-
-
58949084435
-
Scheduling a flow shop with combined buffer conditions
-
10.1016/j.ijpe.2008.11.007
-
SQ Liu E Kozan 2009 Scheduling a flow shop with combined buffer conditions Int J Prod Econ 117 371 380 10.1016/j.ijpe.2008.11.007
-
(2009)
Int J Prod Econ
, vol.117
, pp. 371-380
-
-
Liu, S.Q.1
Kozan, E.2
-
21
-
-
62549158188
-
Scheduling trains as a blocking parallel-machine job shop scheduling problem
-
2586552 1160.90476 10.1016/j.cor.2008.12.012
-
SQ Liu E Kozan 2009 Scheduling trains as a blocking parallel-machine job shop scheduling problem Comput Oper Res 36 2840 2852 2586552 1160.90476 10.1016/j.cor.2008.12.012
-
(2009)
Comput Oper Res
, vol.36
, pp. 2840-2852
-
-
Liu, S.Q.1
Kozan, E.2
-
22
-
-
79957454187
-
Scheduling trains with priorities: A no-wait blocking parallel-machine job-shop scheduling model
-
doi: 10.1287/trsc.1100.0332
-
Liu SQ, Kozan E (2010) Scheduling trains with priorities: a no-wait blocking parallel-machine job-shop scheduling model. Transp Sci. doi: 10.1287/trsc.1100.0332
-
(2010)
Transp Sci.
-
-
Liu, S.Q.1
Kozan, E.2
-
23
-
-
0036874125
-
A comparative study of algorithms for the flowshop scheduling problem
-
1956422 1165.90463
-
SQ Liu HL Ong 2002 A comparative study of algorithms for the flowshop scheduling problem Asia Pac J Oper Res 19 205 222 1956422 1165.90463
-
(2002)
Asia Pac J Oper Res
, vol.19
, pp. 205-222
-
-
Liu, S.Q.1
Ong, H.L.2
-
24
-
-
4444276809
-
Metaheuristics for the mixed shop scheduling problem
-
2108266 1056.90071 10.1142/S0217595904000072
-
SQ Liu HL Ong 2004 Metaheuristics for the mixed shop scheduling problem Asia Pac J Oper Res 21 4 97 115 2108266 1056.90071 10.1142/S0217595904000072
-
(2004)
Asia Pac J Oper Res
, vol.21
, Issue.4
, pp. 97-115
-
-
Liu, S.Q.1
Ong, H.L.2
-
25
-
-
18844386279
-
A fast tabu search algorithm for the group shop scheduling problem
-
DOI 10.1016/j.advengsoft.2005.02.002, PII S0965997805000189
-
SQ Liu HL Ong KM Ng 2005 A fast tabu search algorithm for the group shop scheduling problem Adv Eng Softw 36 533 539 1101.68422 10.1016/j.advengsoft. 2004.10.002 (Pubitemid 40682491)
-
(2005)
Advances in Engineering Software
, vol.36
, Issue.8
, pp. 533-539
-
-
Liu, S.Q.1
Ong, H.L.2
Ng, K.M.3
-
26
-
-
0042589663
-
Over the road transit time for a single track railway
-
10.1287/trsc.8.1.65
-
ER Petersen 1974 Over the road transit time for a single track railway Transp Sci 8 65 74 10.1287/trsc.8.1.65
-
(1974)
Transp Sci
, vol.8
, pp. 65-74
-
-
Petersen, E.R.1
-
27
-
-
66749086336
-
Mathematical solutions for solving periodic railway transportation
-
doi: 10.1155/2009/728916
-
Salido MA, Barber F (2009) Mathematical solutions for solving periodic railway transportation. Math Prob Eng. doi: 10.1155/2009/728916
-
(2009)
Math Prob Eng.
-
-
Salido, M.A.1
Barber, F.2
-
28
-
-
33847110797
-
Domain-dependent distributed models for railway scheduling
-
DOI 10.1016/j.knosys.2006.11.013, PII S0950705106002048, AI 2006
-
MA Salido M Abril F Barber L Ingolotti P Tormos A Lova 2007 Domain-dependent distributed models for railway scheduling Knowl Based Syst 20 186 194 10.1016/j.knosys.2006.11.013 (Pubitemid 46282459)
-
(2007)
Knowledge-Based Systems
, vol.20
, Issue.2
, pp. 186-194
-
-
Salido, M.A.1
Abril, M.2
Barber, F.3
Ingolotti, L.4
Tormos, P.5
Lova, A.6
-
29
-
-
13544267417
-
Bicriteria train scheduling for high-speed passenger railroad planning applications
-
DOI 10.1016/j.ejor.2004.07.019, PII S037722170400476X, Multicriteria Scheduling
-
X Zhou M Zhong 2004 Bicriteria train scheduling for high-speed passenger railway planning applications Eur J Oper Res 167 752 771 2157069 10.1016/j.ejor.2004.07.019 (Pubitemid 40220089)
-
(2005)
European Journal of Operational Research
, vol.167
, Issue.3
, pp. 752-771
-
-
Zhou, X.1
Zhong, M.2
|