Volumn 29, Issue 6, 2011, Pages 706-717

Cost simulation in an item-based project involving construction engineering and management

Author keywords

Cost estimation; Decision making; Engineering and construction; Project management; Simulation

Indexed keywords

ABSOLUTE ERROR; BUDGET ALLOCATION; COMPONENT MODEL; CONSTRUCTION COSTS; CONSTRUCTION ENGINEERING; CONTINUOUS SIMULATION; COST DISTRIBUTION; COST ESTIMATIONS; COST SIMULATIONS; DECISION TOOL; HISTORICAL CONSTRUCTION; HYPOTHESIS TESTING; MONTE CARLO SIMULATION; PROJECT MANAGERS; SIMULATION; SIMULATION ACCURACY; SIMULATION PROCEDURES; SYSTEMATIC SIMULATION; UNIT PRICES; WORK ITEMS;

EID: 79960041379     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2010.07.010     Document Type: Article
Times cited : (90)

References (42)
  • 2
    • 0035399837 scopus 로고    scopus 로고
    • Managing projects front-end: incorporating a strategic early view to project management with simulation
    • Artto K.A., Lehtonen J.M., Saranen J. Managing projects front-end: incorporating a strategic early view to project management with simulation. International Journal of Project Management 2001, 19:255-264.
    • (2001) International Journal of Project Management , vol.19 , pp. 255-264
    • Artto, K.A.1    Lehtonen, J.M.2    Saranen, J.3
  • 4
    • 0003563595 scopus 로고    scopus 로고
    • Modeling and generating random vectors with arbitrary marginal distributions and correlation matrix
    • Northwestern University, Evanston, Illinois
    • Cario M.C., Nelson B.L. Modeling and generating random vectors with arbitrary marginal distributions and correlation matrix. Department of Industrial Engineering and Management Sciences 1997, Northwestern University, Evanston, Illinois.
    • (1997) Department of Industrial Engineering and Management Sciences
    • Cario, M.C.1    Nelson, B.L.2
  • 5
    • 0009771672 scopus 로고
    • Monte Carlo simulation of construction costs using subjective data
    • Chau K.W. Monte Carlo simulation of construction costs using subjective data. Construction Management and Economics 1995, 13:369-383.
    • (1995) Construction Management and Economics , vol.13 , pp. 369-383
    • Chau, K.W.1
  • 6
    • 0343000065 scopus 로고
    • The validity of the triangular distribution assumption in Monte Carlo simulation of construction costs. Empirical evidence from Hong Kong
    • Chau K.W. The validity of the triangular distribution assumption in Monte Carlo simulation of construction costs. Empirical evidence from Hong Kong. Construction Management and Economics 1995, 13:15-21.
    • (1995) Construction Management and Economics , vol.13 , pp. 15-21
    • Chau, K.W.1
  • 7
    • 56349153507 scopus 로고    scopus 로고
    • Web-based CBR system applied to early cost budgeting for pavement maintenance project
    • Chou J.-S. Web-based CBR system applied to early cost budgeting for pavement maintenance project. Expert Systems with Applications 2009, 36:2947-2960.
    • (2009) Expert Systems with Applications , vol.36 , pp. 2947-2960
    • Chou, J.-S.1
  • 10
    • 65649150692 scopus 로고    scopus 로고
    • Probabilistic simulation for developing likelihood distribution of engineering project cost
    • Chou J.-S., Yang I.-T., Chong W.K. Probabilistic simulation for developing likelihood distribution of engineering project cost. Automation in Construction 2009, 18:570-577.
    • (2009) Automation in Construction , vol.18 , pp. 570-577
    • Chou, J.-S.1    Yang, I.-T.2    Chong, W.K.3
  • 18
    • 0348134540 scopus 로고    scopus 로고
    • Behavior of the NORTA method for correlated random vector generation as the dimension increases
    • Ghosh S., Henderson S.G. Behavior of the NORTA method for correlated random vector generation as the dimension increases. ACM Transactions on Modeling and Computer Simulation 2003, 13:276-294.
    • (2003) ACM Transactions on Modeling and Computer Simulation , vol.13 , pp. 276-294
    • Ghosh, S.1    Henderson, S.G.2
  • 19
    • 0034318254 scopus 로고    scopus 로고
    • Using Monte Carlo simulation for pavement cost analysis
    • Herbold K.D. Using Monte Carlo simulation for pavement cost analysis. Public Roads 2000, 64:2-6.
    • (2000) Public Roads , vol.64 , pp. 2-6
    • Herbold, K.D.1
  • 20
    • 38249020406 scopus 로고
    • Application of risk analysis techniques in proposal assessment
    • Hull J.K. Application of risk analysis techniques in proposal assessment. International Journal of Project Management 1990, 8:152-157.
    • (1990) International Journal of Project Management , vol.8 , pp. 152-157
    • Hull, J.K.1
  • 25
    • 79960074683 scopus 로고    scopus 로고
    • MOTC, 2010. accessed in Jan. 2010.
    • MOTC, 2010. accessed in Jan. 2010. http://www.thb.gov.tw/.
  • 29
    • 34250689510 scopus 로고    scopus 로고
    • Using extended Monte Carlo simulation method for the improvement of risk management: consideration of relationships between uncertainties
    • Rezaie K., Amalnik M.S., Gereie A., Ostadi B., Shakhseniaee M. Using extended Monte Carlo simulation method for the improvement of risk management: consideration of relationships between uncertainties. Applied Mathematics and Computation 2007, 190:1492-1501.
    • (2007) Applied Mathematics and Computation , vol.190 , pp. 1492-1501
    • Rezaie, K.1    Amalnik, M.S.2    Gereie, A.3    Ostadi, B.4    Shakhseniaee, M.5
  • 31
    • 0037340023 scopus 로고    scopus 로고
    • Risk-based life-cycle costing of infrastructure rehabilitation and construction alternatives
    • Salem O., AbouRizk S., Ariaratnam S. Risk-based life-cycle costing of infrastructure rehabilitation and construction alternatives. Journal of Infrastructure Systems 2003, 9:6-15.
    • (2003) Journal of Infrastructure Systems , vol.9 , pp. 6-15
    • Salem, O.1    AbouRizk, S.2    Ariaratnam, S.3
  • 32
    • 0035732752 scopus 로고    scopus 로고
    • Guidelines for probabilistic pavement life cycle cost analysis
    • Tighe S. Guidelines for probabilistic pavement life cycle cost analysis. Transportation Research Record 2001, 28-38.
    • (2001) Transportation Research Record , pp. 28-38
    • Tighe, S.1
  • 33
    • 0027560002 scopus 로고
    • Probabilistic cost estimating with subjective correlations
    • Touran A. Probabilistic cost estimating with subjective correlations. Journal of Construction Engineering Management 1993, 119:58-71.
    • (1993) Journal of Construction Engineering Management , vol.119 , pp. 58-71
    • Touran, A.1
  • 36
    • 0006439585 scopus 로고    scopus 로고
    • Distributions and correlations in Monte-Carlo simulation
    • Wall D.M. Distributions and correlations in Monte-Carlo simulation. Construction Management and Economics 1997, 15:241-258.
    • (1997) Construction Management and Economics , vol.15 , pp. 241-258
    • Wall, D.M.1
  • 37
    • 0009766039 scopus 로고    scopus 로고
    • SIM-UTILITY: model for project ceiling price determination
    • Wang W.-C. SIM-UTILITY: model for project ceiling price determination. Journal of Construction Engineering Management 2002, 128:76-84.
    • (2002) Journal of Construction Engineering Management , vol.128 , pp. 76-84
    • Wang, W.-C.1
  • 39
    • 0346885969 scopus 로고    scopus 로고
    • Supporting project cost threshold decisions via a mathematical cost model
    • Wang W.C. Supporting project cost threshold decisions via a mathematical cost model. International Journal of Project Management 2004, 22:99-108.
    • (2004) International Journal of Project Management , vol.22 , pp. 99-108
    • Wang, W.C.1
  • 41
    • 18144422742 scopus 로고    scopus 로고
    • Simulation-based estimation for correlated cost elements
    • Yang I.-T. Simulation-based estimation for correlated cost elements. International Journal of Project Management 2005, 23:275-282.
    • (2005) International Journal of Project Management , vol.23 , pp. 275-282
    • Yang, I.-T.1
  • 42
    • 42549167434 scopus 로고    scopus 로고
    • Distribution-free Monte Carlo simulation: premise and refinement
    • Yang I.-T. Distribution-free Monte Carlo simulation: premise and refinement. Journal of Construction Engineering Management 2008, 134:352-360.
    • (2008) Journal of Construction Engineering Management , vol.134 , pp. 352-360
    • Yang, I.-T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.