-
1
-
-
0028457078
-
-
" J. Constr. Eng. Manage., (2).
-
AbouRizk, S. M., Halpin, D. W., and Wilson, J. R. (1994). " Fitting beta distributions based on sample data.." J. Constr. Eng. Manage., 120 (2), 288-305.
-
(1994)
Fitting Beta Distributions Based on Sample Data
, vol.120
, pp. 288-305
-
-
Abourizk, S.M.1
Halpin, D.W.2
Wilson, J.R.3
-
2
-
-
0034147705
-
-
Psychometrika.
-
Bonett, D. G., and Wright, T. A. (2000). " Sample size requirements for estimating Pearson, Kendall and Spearman correlations.." Psychometrika, 65, 23-28.
-
(2000)
Sample Size Requirements for Estimating Pearson, Kendall and Spearman Correlations
, vol.65
, pp. 23-28
-
-
Bonett, D.G.1
Wright, T.A.2
-
4
-
-
42549128509
-
-
" Proc., Construction Research Congress 2005, San Diego, Calif., April 5-7.
-
Chou, J. S., Wang, L. L., Chou, W. K., and O'Conner, J. (2005). " Preliminary cost estimates using probabilistic simulation for highway bridge replacement projects.." Proc., Construction Research Congress 2005, San Diego, Calif., April 5-7, 467-471.
-
(2005)
Preliminary Cost Estimates Using Probabilistic Simulation for Highway Bridge Replacement Projects
, pp. 467-471
-
-
Chou, J.S.1
Wang, L.L.2
Chou, W.K.3
O'Conner, J.4
-
6
-
-
0036464756
-
-
IEEE Trans. Evol. Comput.
-
Clerc, M., and Kennedy, J. (2002). " The particle swarm-explosion, stability, and convergence in a multidimensional complex space.." IEEE Trans. Evol. Comput., 6, 58-73
-
(2002)
The Particle Swarm-explosion, Stability, and Convergence in A Multidimensional Complex Space
, vol.6
, pp. 58-73
-
-
Clerc, M.1
Kennedy, J.2
-
7
-
-
22344432656
-
-
" Adv. Eng. Inf., (1).
-
Elbeltagi, E., Hegazy, T., and Grierson, D. (2005). " Comparison among five evolutionary-based optimization algorithms.." Adv. Eng. Inf., 19 (1), 43-53.
-
(2005)
Comparison among Five Evolutionary-based Optimization Algorithms
, vol.19
, pp. 43-53
-
-
Elbeltagi, E.1
Hegazy, T.2
Grierson, D.3
-
8
-
-
33744978369
-
-
" Comput. Geosci., (6).
-
Hamm, N. A. S., Hall, J. W., and Anderson, M. G. (2006). " Variance-based sensitivity analysis of the probability of hydrologically induced slope instability.." Comput. Geosci., 32 (6), 803-817.
-
(2006)
Variance-based Sensitivity Analysis of the Probability of Hydrologically Induced Slope Instability
, vol.32
, pp. 803-817
-
-
Hamm, N.A.S.1
Hall, J.W.2
Anderson, M.G.3
-
9
-
-
84933516758
-
-
Comm. in Statistics, (3).
-
Iman, R. L., and Conover, W. J. (1982). " A distribution-free approach to inducing rank correlations among input variables.." Comm. in Statistics, 11 (3), 311-334.
-
(1982)
A Distribution-free Approach to Inducing Rank Correlations among Input Variables
, vol.11
, pp. 311-334
-
-
Iman, R.L.1
Conover, W.J.2
-
10
-
-
42549149962
-
-
Swarm intelligence, Morgan Kaufmann, San Francisco.
-
Kennedy, J., Eberhart, R. C., and Shi, Y. (2001). Swarm intelligence, Morgan Kaufmann, San Francisco.
-
(2001)
-
-
Kennedy, J.1
Eberhart, R.C.2
Shi, Y.3
-
11
-
-
85057244318
-
-
Handbook of statistical distributions with applications, Chapman and Hall, Boca Raton, Fla.
-
Krishnamoorthy, K. (2006). Handbook of statistical distributions with applications, Chapman and Hall, Boca Raton, Fla.
-
(2006)
-
-
Krishnamoorthy, K.1
-
13
-
-
42549130668
-
-
Uncertainty analysis with high dimensional dependence, Wiley, New York.
-
Kurowicka, D., and Cooke, R. M. (2006). Uncertainty analysis with high dimensional dependence, Wiley, New York, 107-109.
-
(2006)
, pp. 107-109
-
-
Kurowicka, D.1
Cooke, R.M.2
-
14
-
-
18144397346
-
-
Comput. Aided Civ. Infrastruct. Eng., (5).
-
Liu, M., and Frangopol, D. M. (2005). " Bridge annual maintenance prioritization under uncertainty by multiobjective combinatorial optimization.." Comput. Aided Civ. Infrastruct. Eng., 20 (5), 343-353.
-
(2005)
Bridge Annual Maintenance Prioritization under Uncertainty by Multiobjective Combinatorial Optimization
, vol.20
, pp. 343-353
-
-
Liu, M.1
Frangopol, D.M.2
-
15
-
-
33644921959
-
-
" J. Eng. Mech., (4).
-
Lupoi, G., Franchin, P., Lupoi, A., and Pinto, P. E. (2006). " Seismic fragility analysis of structural systems.." J. Eng. Mech., 132 (4), 385-395.
-
(2006)
Seismic Fragility Analysis of Structural Systems
, vol.132
, pp. 385-395
-
-
Lupoi, G.1
Franchin, P.2
Lupoi, A.3
Pinto, P.E.4
-
17
-
-
0034225611
-
-
" J. Constr. Eng. Manage., (4).
-
Maio, C., Schexnuayder, C., Knutson, K., and Weber, S. (2000). " Probability distribution functions for construction simulation.." J. Constr. Eng. Manage., 126 (4), 285-292.
-
(2000)
Probability Distribution Functions for Construction Simulation
, vol.126
, pp. 285-292
-
-
Maio, C.1
Schexnuayder, C.2
Knutson, K.3
Weber, S.4
-
19
-
-
0033181534
-
-
" J. Trans Eng., (5).
-
Mrawira, D., Welch, W. J., Schonlau, M., and Haas, R. (1999). " Sensitivity analysis of computer models: World Bank HDM-III model.." J. Transp. Eng., 125 (5), 421-428.
-
(1999)
Sensitivity Analysis of Computer Models: World Bank HDM-III Model
, vol.125
, pp. 421-428
-
-
Mrawira, D.1
Welch, W.J.2
Schonlau, M.3
Haas, R.4
-
20
-
-
0036172940
-
-
J. Eng. Mech., (1).
-
Olsson, A. M., and Sandberg, G. E. (2002). " Latin hypercube sampling for stochastic finite-element analysis.." J. Eng. Mech., 128 (1), 121-125.
-
(2002)
Latin Hypercube Sampling for Stochastic Finite-element Analysis
, vol.128
, pp. 121-125
-
-
Olsson, A.M.1
Sandberg, G.E.2
-
22
-
-
35248812683
-
-
J. Risk, (2).
-
Rebonato, R., and Jackel, P. (1999). " The most general methodology to create a valid correlation matrix for risk management and option pricing purposes.." J. Risk, 2 (2), 17-27.
-
(1999)
The Most General Methodology to Create A Valid Correlation Matrix for Risk Management and Option Pricing Purposes
, vol.2
, pp. 17-27
-
-
Rebonato, R.1
Jackel, P.2
-
23
-
-
0000742593
-
-
Oper. Res., (2).
-
Schmeiser, B. W., and Lal, R. (1982). " Bivariate gamma random vectors.." Oper. Res., 30 (2), 355-374.
-
(1982)
Bivariate Gamma Random Vectors
, vol.30
, pp. 355-374
-
-
Schmeiser, B.W.1
Lal, R.2
-
24
-
-
13844257055
-
-
J. Struct. Eng., (1).
-
Scollard, C. R., and Bartlett, F. M. (2004). " Impact of new ACI 318 flexural resistance factor on bond failures.." J. Struct. Eng., 130 (1), 138-146.
-
(2004)
Impact of New ACI 318 Flexural Resistance Factor on Bond Failures
, vol.130
, pp. 138-146
-
-
Scollard, C.R.1
Bartlett, F.M.2
-
25
-
-
12744271519
-
-
J. Constr. Eng. Manage., (2).
-
Shen, L. Y., and Wu, Y. Z. (2005). " Risk concession model for build/operate/transfer contract projects.." J. Constr. Eng. Manage., 131 (2), 211-220.
-
(2005)
Risk Concession Model for Build/operate/transfer Contract Projects
, vol.131
, pp. 211-220
-
-
Shen, L.Y.1
Wu, Y.Z.2
-
27
-
-
33746190783
-
-
J. Constr. Eng. Manage., (8).
-
Touran, A., and Lopez, R. (2006). " Modeling cost escalation in large infrastructure projects.." J. Constr. Eng. Manage., 132 (8), 853-860.
-
(2006)
Modeling Cost Escalation in Large Infrastructure Projects
, vol.132
, pp. 853-860
-
-
Touran, A.1
Lopez, R.2
-
28
-
-
0000343930
-
-
J. Constr. Eng. Manage., (3).
-
Touran, A., and Suphot, L. (1997). " Rank correlation in simulating construction costs.." J. Constr. Eng. Manage., 123 (3), 297-301.
-
(1997)
Rank Correlation in Simulating Construction Costs
, vol.123
, pp. 297-301
-
-
Touran, A.1
Suphot, L.2
-
30
-
-
31944448941
-
-
Inform. Science, (8).
-
van den Bergh, F., and Engelbrecht, A. P. (2006). " A study of particle swarm optimization particle trajectories.." Inform. Science, 176 (8), 937-971.
-
(2006)
A Study of Particle Swarm Optimization Particle Trajectories
, vol.176
, pp. 937-971
-
-
Van Den Bergh, F.1
Engelbrecht, A.P.2
-
31
-
-
42549145248
-
-
Risk analysis: A quantitative guide, 2nd Ed., Wiley, Chichester, U.K..
-
Vose, D. (2000). Risk analysis: A quantitative guide, 2nd Ed., Wiley, Chichester, U.K., 296-299.
-
(2000)
, pp. 296-299
-
-
Vose, D.1
|