메뉴 건너뛰기




Volumn 51, Issue 4, 2004, Pages 795-811

A genetic algorithm for preventive maintenance scheduling in a multi-unit multi-state system

Author keywords

Genetic Algorithms; Maintenance Planning; Multi state; Multi unit; Preventive Maintenance; Simulation Model

Indexed keywords

COMPUTER SIMULATION; CONSTRAINT THEORY; COSTS; GENETIC ALGORITHMS; MULTI AGENT SYSTEMS; PROBLEM SOLVING; REPAIR; SCHEDULING;

EID: 13244255359     PISSN: 11101903     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (9)

References (14)
  • 1
    • 0031164204 scopus 로고    scopus 로고
    • Generator maintenance scheduling: A fuzzy system approach with genetic enhancement
    • Huang, S.J., "Generator maintenance scheduling: a fuzzy system approach with genetic enhancement", Electric Power Systems Research, Vol. 41, pp. 233-239, 1997.
    • (1997) Electric Power Systems Research , vol.41 , pp. 233-239
    • Huang, S.J.1
  • 2
    • 0029343602 scopus 로고
    • A multi-objective optimization approach to thermal generating units maintenance scheduling
    • Kralj, B., and Petrovic, R., "A multi-objective optimization approach to thermal generating units maintenance scheduling", European Journal of Operational Research, Vol. 84, pp. 481-493, 1995.
    • (1995) European Journal of Operational Research , vol.84 , pp. 481-493
    • Kralj, B.1    Petrovic, R.2
  • 3
    • 0034135276 scopus 로고    scopus 로고
    • Optimization of imperfect preventive maintenance for multi-state systems
    • Levitin, G., and Lisnianski, A., "Optimization of imperfect preventive maintenance for multi-state systems", Reliability Engineering and System Safety, Vol. 67, pp. 193-203, 2000.
    • (2000) Reliability Engineering and System Safety , vol.67 , pp. 193-203
    • Levitin, G.1    Lisnianski, A.2
  • 4
    • 0034881840 scopus 로고    scopus 로고
    • Optimal preventive maintenance planning for multiple elevators
    • Yamashina, H., and Otani, S., "Optimal preventive maintenance planning for multiple elevators", Journal of Quality in Maintenance Engineering, Vol. 7, No. 2, pp. 128-150, 2001.
    • (2001) Journal of Quality in Maintenance Engineering , vol.7 , Issue.2 , pp. 128-150
    • Yamashina, H.1    Otani, S.2
  • 5
    • 13244289050 scopus 로고    scopus 로고
    • Maintenance scheduling for a multi-group system
    • Gomaa, A., H., "Maintenance scheduling for a multi-group system", Journal of Engineering and Applied Science, Vol. 46, No. 3, pp. 515-528, 1999.
    • (1999) Journal of Engineering and Applied Science , vol.46 , Issue.3 , pp. 515-528
    • Gomaa, A.H.1
  • 6
    • 0033739305 scopus 로고    scopus 로고
    • Practices of preventive maintenance and replacement for engines: A case study
    • Lai, K.K., Leung, F.K.N., Tao, B., Wang, S.Y., "Practices of preventive maintenance and replacement for engines: A case study", European Journal of Operational Research, Vol. 124, pp. 294-306, 2000.
    • (2000) European Journal of Operational Research , vol.124 , pp. 294-306
    • Lai, K.K.1    Leung, F.K.N.2    Tao, B.3    Wang, S.Y.4
  • 7
    • 0029343422 scopus 로고
    • Marginal cost criteria for preventive replacement of a group of components
    • Dekker, R., and Roelvink, I.F.K., "Marginal cost criteria for preventive replacement of a group of components", European Journal of Operational Research, Vol. 84, No. 2, pp. 467-480, 1995.
    • (1995) European Journal of Operational Research , vol.84 , Issue.2 , pp. 467-480
    • Dekker, R.1    Roelvink, I.F.K.2
  • 8
    • 0032641491 scopus 로고    scopus 로고
    • Cost optimal replacement of monotone repairable systems
    • Sandve, K., and Aven, T., "Cost optimal replacement of monotone repairable systems", European Journal of Operational Research, Vol. 116, pp. 235-248, 1999.
    • (1999) European Journal of Operational Research , vol.116 , pp. 235-248
    • Sandve, K.1    Aven, T.2
  • 9
    • 0036641666 scopus 로고    scopus 로고
    • A fuzzy knowledge based method for maintenance planning in a power system
    • Sergaki, A., and Kalaitzakis, K., "A fuzzy knowledge based method for maintenance planning in a power system", Reliability Engineering and System Safety, Vol. 77, pp. 19-30, 2002.
    • (2002) Reliability Engineering and System Safety , vol.77 , pp. 19-30
    • Sergaki, A.1    Kalaitzakis, K.2
  • 11
    • 0034159705 scopus 로고    scopus 로고
    • Scheduling jobs and maintenance activities on parallel machines
    • Lee, C.Y., and Chen, Z.L., "Scheduling jobs and maintenance activities on parallel machines", Naval Research Logistics, Vol. 47, pp. 145-165, 2000.
    • (2000) Naval Research Logistics , vol.47 , pp. 145-165
    • Lee, C.Y.1    Chen, Z.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.