메뉴 건너뛰기




Volumn 32, Issue 1-2, 2007, Pages 169-183

The application of genetic algorithm in the development of preventive maintenance analytic model

Author keywords

Genetic algorithm; Part replacement frequency; Preventive frequency; Preventive maintenance mathematical model

Indexed keywords

COSTS; DECISION MAKING; GENETIC ALGORITHMS; MATHEMATICAL MODELS; MATHEMATICAL PROGRAMMING; PERSONNEL; PRODUCTION ENGINEERING;

EID: 33846960196     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-005-0314-4     Document Type: Article
Times cited : (24)

References (26)
  • 1
    • 84977325902 scopus 로고
    • A replacement model with overhauls and repairs
    • Liu XG, Makis V, Jardine AKS (1995) A replacement model with overhauls and repairs. Naval Res Logist 42:1063-1079
    • (1995) Naval Res Logist , vol.42 , pp. 1063-1079
    • Liu, X.G.1    Makis, V.2    Jardine, A.K.S.3
  • 2
    • 0001178588 scopus 로고    scopus 로고
    • A generalized age and block replacement of a system to shocks
    • Sheu SH (1998) A generalized age and block replacement of a system to shocks. Eur J Oper Res 108:345-362
    • (1998) Eur J Oper Res , vol.108 , pp. 345-362
    • Sheu, S.H.1
  • 3
    • 0029378133 scopus 로고
    • Extended optimal replacement model with random minimal repair costs
    • Sheu SH, Griffith WS, Nakagawa T (1995) Extended optimal replacement model with random minimal repair costs. Eur J Oper Res 85:636-649
    • (1995) Eur J Oper Res , vol.85 , pp. 636-649
    • Sheu, S.H.1    Griffith, W.S.2    Nakagawa, T.3
  • 4
    • 0037211215 scopus 로고    scopus 로고
    • Determining the optimal production maintenance policy with inspection errors: Using a Markov Chain
    • Wang CH, Sheu SH (2003) Determining the optimal production maintenance policy with inspection errors: using a Markov Chain. Comput Oper Res 30:1-17
    • (2003) Comput Oper Res , vol.30 , pp. 1-17
    • Wang, C.H.1    Sheu, S.H.2
  • 5
    • 0022230489 scopus 로고
    • Determining economic maintenance frequency for a family of machines
    • Goyal SK, Kusy MI (1985) Determining economic maintenance frequency for a family of machines. J Oper Research Soc 36(12): 1125-1128
    • (1985) J Oper Research Soc , vol.36 , Issue.12 , pp. 1125-1128
    • Goyal, S.K.1    Kusy, M.I.2
  • 6
    • 0022206475 scopus 로고
    • Note on determination of coordinated maintenance scheduling frequencies for a group of machines
    • Goyal SK, Buyukkurt M D (1985) Note on determination of coordinated maintenance scheduling frequencies for a group of machines. HE Trans 17(4):400-402
    • (1985) HE Trans , vol.17 , Issue.4 , pp. 400-402
    • Goyal, S.K.1    Buyukkurt, M.D.2
  • 8
    • 0018441246 scopus 로고
    • Determination of coordinated maintenance scheduling frequencies for a group of machines
    • Suie DR, Harmon B (1979) Determination of coordinated maintenance scheduling frequencies for a group of machines. AIIE Trans 11(1):48-53
    • (1979) AIIE Trans , vol.11 , Issue.1 , pp. 48-53
    • Suie, D.R.1    Harmon, B.2
  • 9
    • 0006474341 scopus 로고
    • Determining economic maintenance Frequency of a transport fleet
    • Goyal SK, Gunasekaran A (1992) Determining economic maintenance Frequency of a transport fleet. Intl J Syst Sci 23 (4):655-659
    • (1992) Intl J Syst Sci , vol.23 , Issue.4 , pp. 655-659
    • Goyal, S.K.1    Gunasekaran, A.2
  • 10
    • 21344488361 scopus 로고
    • A deterministic maintenance-scheduling problem for a group of non-identical machines
    • Hariga M (1994) A deterministic maintenance-scheduling problem for a group of non-identical machines. Int J Oper Prod Manage 14(7):27-36
    • (1994) Int J Oper Prod Manage , vol.14 , Issue.7 , pp. 27-36
    • Hariga, M.1
  • 11
    • 21344491916 scopus 로고
    • An extended model for the joint overhaul scheduling problem
    • Duffuaa SO, Ben-Daya M (1994) An extended model for the joint overhaul scheduling problem. Int J Oper Prod Manage 14 (7):37-43
    • (1994) Int J Oper Prod Manage , vol.14 , Issue.7 , pp. 37-43
    • Duffuaa, S.O.1    Ben-Daya, M.2
  • 13
    • 0036641531 scopus 로고    scopus 로고
    • Spreadsheet modeling of optimal maintenance schedule for components in wear-out phase
    • Artana KB, Ishida K (2002) Spreadsheet modeling of optimal maintenance schedule for components in wear-out phase. Reliab Eng Syst Safety 77:81-91
    • (2002) Reliab Eng Syst Safety , vol.77 , pp. 81-91
    • Artana, K.B.1    Ishida, K.2
  • 14
    • 0037411886 scopus 로고    scopus 로고
    • Single machine scheduling with periodic maintenance and non-consumable jobs
    • Liao CJ, Chen WJ (2003) Single machine scheduling with periodic maintenance and non-consumable jobs. Comput Oper Res 30; 1335-1347
    • (2003) Comput Oper Res , vol.30 , pp. 1335-1347
    • Liao, C.J.1    Chen, W.J.2
  • 15
    • 0036683331 scopus 로고    scopus 로고
    • Condition-based maintenance optimization by means of genetic algorithms and Monte Carlo simulation
    • Marseguerra M, Zio E, Podofillini L (2002) Condition-based maintenance optimization by means of genetic algorithms and Monte Carlo simulation. Reliab Eng Syst Safety 77:151-166
    • (2002) Reliab Eng Syst Safety , vol.77 , pp. 151-166
    • Marseguerra, M.1    Zio, E.2    Podofillini, L.3
  • 16
    • 0141963917 scopus 로고    scopus 로고
    • New method to minimize the preventive maintenance cost of series-parallel systems
    • Bris R, Chatelet E, Yalaoui F (2003) New method to minimize the preventive maintenance cost of series-parallel systems. Reliab Eng Syst Safety 82:247-255
    • (2003) Reliab Eng Syst Safety , vol.82 , pp. 247-255
    • Bris, R.1    Chatelet, E.2    Yalaoui, F.3
  • 17
    • 13444291361 scopus 로고    scopus 로고
    • Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine
    • Sortrakul N, Nachtmann HL, Cassady CR (2005) Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine. Comput Ind 56:161-168
    • (2005) Comput Ind , vol.56 , pp. 161-168
    • Sortrakul, N.1    Nachtmann, H.L.2    Cassady, C.R.3
  • 18
    • 10444239385 scopus 로고    scopus 로고
    • Maintenance optimization of infrastructure networks using genetic algorithms
    • Morcous G, Lounis Z (2005) Maintenance optimization of infrastructure networks using genetic algorithms. Automat Constr 14:129-142
    • (2005) Automat Constr , vol.14 , pp. 129-142
    • Morcous, G.1    Lounis, Z.2
  • 19
    • 1242320329 scopus 로고    scopus 로고
    • A genetic algorithm solution for a nuclear power plant risk-cost maintenance model
    • Jiejuan T, Dingyuan M, Dazhi X (2004) A genetic algorithm solution for a nuclear power plant risk-cost maintenance model. Nuclear Eng Des 229:81-89
    • (2004) Nuclear Eng Des , vol.229 , pp. 81-89
    • Jiejuan, T.1    Dingyuan, M.2    Dazhi, X.3
  • 20
    • 0033133851 scopus 로고    scopus 로고
    • Solving a nonlinear non-convex trim loss problem with a genetic hybrid algorithm
    • Ostermark R (1999) Solving a nonlinear non-convex trim loss problem with a genetic hybrid algorithm. Comput Oper Res 26:623-635
    • (1999) Comput Oper Res , vol.26 , pp. 623-635
    • Ostermark, R.1
  • 21
    • 0030241843 scopus 로고    scopus 로고
    • Genetic algorithm for non-linear mixed integer programming problems and its applications
    • Yokota T, Gen M, Yin-Xiu L (1996) Genetic algorithm for non-linear mixed integer programming problems and its applications. Comput Ind Eng 30:905-917
    • (1996) Comput Ind Eng , vol.30 , pp. 905-917
    • Yokota, T.1    Gen, M.2    Yin-Xiu, L.3
  • 22
    • 13844319277 scopus 로고    scopus 로고
    • Operation planning of district heating and cooling plants using genetic algorithms for mixed integer programming
    • Sakawa M, Kato K, Ushiro S, Inaoka M (2001) Operation planning of district heating and cooling plants using genetic algorithms for mixed integer programming. Appl Soft Comput J 1:139-150
    • (2001) Appl Soft Comput , vol.J 1 , pp. 139-150
    • Sakawa, M.1    Kato, K.2    Ushiro, S.3    Inaoka, M.4
  • 23
    • 0342757703 scopus 로고    scopus 로고
    • A genetic algorithm for online-scheduling of a multi-product polymer batch plant
    • Wang K, Lohl T, Stobbe M, Engell S (2000) A genetic algorithm for online-scheduling of a multi-product polymer batch plant. Comput Chem Eng 24:393-400
    • (2000) Comput Chem Eng , vol.24 , pp. 393-400
    • Wang, K.1    Lohl, T.2    Stobbe, M.3    Engell, S.4
  • 24
    • 0036642714 scopus 로고    scopus 로고
    • Study on multi-stage logistic chain network: A spanning tree-based genetic algorithm approach
    • Syarif A, Yun Y, Gen M (2002) Study on multi-stage logistic chain network: a spanning tree-based genetic algorithm approach. Comput Ind Eng 43:299-314
    • (2002) Comput Ind Eng , vol.43 , pp. 299-314
    • Syarif, A.1    Yun, Y.2    Gen, M.3
  • 26
    • 33846956587 scopus 로고    scopus 로고
    • Lindo System Company (2003) Lingo software version 8.0
    • Lindo System Company (2003) Lingo software version 8.0


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.