-
1
-
-
79957983535
-
Network models in railroad planning and scheduling
-
H.J. Greenberg and J.C. Smith, eds. INFORMS
-
Ahuja, R.K., Cunha, C.B., and Sahin., G., 2005. Network models in railroad planning and scheduling. In: H.J. Greenberg and J.C. Smith, eds. TutORials in operations research. INFORMS.
-
(2005)
TutORials in Operations Research
-
-
Ahuja, R.K.1
Cunha, C.B.2
Sahin, G.3
-
3
-
-
78650083580
-
Periodic railway timetabling with event flexibility
-
Caimi, G., Fuchsberger, M., Laumanns, M., and Schüpbach, K., 2010. Periodic railway timetabling with event flexibility. Networks, 57 (1), 3-18.
-
(2010)
Networks
, vol.57
, Issue.1
, pp. 3-18
-
-
Caimi, G.1
Fuchsberger, M.2
Laumanns, M.3
-
4
-
-
0036759198
-
Modeling and solving the train timetabling problem
-
Caprara, A., Fischetti, M., and Toth, P., 2002. Modeling and solving the train timetabling problem. Operations Research, 50 (5), 851-861.
-
(2002)
Operations Research
, vol.50
, Issue.5
, pp. 851-861
-
-
Caprara, A.1
Fischetti, M.2
Toth, P.3
-
6
-
-
67649977016
-
The New Dutch timetable: The OR revolution
-
Kroon, L.G., et al., 2009. The New Dutch timetable: the OR revolution. INTERFACES, 39 (1), 6-17.
-
(2009)
INTERFACES
, vol.39
, Issue.1
, pp. 6-17
-
-
Kroon, L.G.1
-
7
-
-
0043207353
-
A variable trip time model for cyclic railway timetabling
-
Kroon, L.G. and Peeters, L., 2003. A variable trip time model for cyclic railway timetabling. Transportation Science, 37 (2), 198-212.
-
(2003)
Transportation Science
, vol.37
, Issue.2
, pp. 198-212
-
-
Kroon, L.G.1
Peeters, L.2
-
8
-
-
59849126662
-
Bringing customer focus into every nut and bolt of the railway: Swiss Federal Railway's path into the future
-
Seoul
-
Laube, F. and Mahadevan, V., 2008. Bringing customer focus into every nut and bolt of the railway: Swiss Federal Railway's path into the future. In: Proceedings of the 8th World Congress of Railway Research (WCRR). Seoul.
-
(2008)
Proceedings of the 8th World Congress of Railway Research (WCRR)
-
-
Laube, F.1
Mahadevan, V.2
-
10
-
-
56249131871
-
The first optimized railway timetable in practice
-
Liebchen, C., 2008. The first optimized railway timetable in practice. Transportation Science, 42 (4), 420-435.
-
(2008)
Transportation Science
, vol.42
, Issue.4
, pp. 420-435
-
-
Liebchen, C.1
-
11
-
-
49949090088
-
The modeling power of the periodic event scheduling problem: Railway timetables-and beyond
-
F. Geraets, L. Kroon, A. Schoebel, D. Wagner and C.D. Zaroliagis, eds., LNCS 4359. Berlin: Springer
-
Liebchen, C. and Möhring, R., 2007. The modeling power of the periodic event scheduling problem: railway timetables-and beyond. In: F. Geraets, L. Kroon, A. Schoebel, D. Wagner and C.D. Zaroliagis, eds. Algorithmic methods for railway optimization, LNCS 4359. Berlin: Springer.
-
(2007)
Algorithmic Methods for Railway Optimization
-
-
Liebchen, C.1
Möhring, R.2
-
12
-
-
56249113768
-
Integral cycle bases for cyclic timetabling
-
Liebchen, C. and Peeters, L., 2009. Integral cycle bases for cyclic timetabling. Discrete Optimization, 6 (1), 98-109.
-
(2009)
Discrete Optimization
, vol.6
, Issue.1
, pp. 98-109
-
-
Liebchen, C.1
Peeters, L.2
-
13
-
-
33751327777
-
Classes of cycle bases
-
Liebchen, C. and Rizzi, R., 2007. Classes of cycle bases. Discrete Applied Mathematics, 155 (3), 337-355.
-
(2007)
Discrete Applied Mathematics
, vol.155
, Issue.3
, pp. 337-355
-
-
Liebchen, C.1
Rizzi, R.2
-
16
-
-
0030143150
-
A genetic algorithm approach to periodic railway synchronization
-
Nachtigall, K. and Voget, S., 1996. A genetic algorithm approach to periodic railway synchronization. Computers & Operations Research, 23 (5), 453-463.
-
(1996)
Computers & Operations Research
, vol.23
, Issue.5
, pp. 453-463
-
-
Nachtigall, K.1
Voget, S.2
-
17
-
-
0030412990
-
A constraint generation algorithm for the construction of periodic railway timetables
-
Odijk, M.A., 1996. A constraint generation algorithm for the construction of periodic railway timetables. Transportation Research Part B, 30 (6), 455-464.
-
(1996)
Transportation Research Part B
, vol.30
, Issue.6
, pp. 455-464
-
-
Odijk, M.A.1
-
18
-
-
0041959616
-
A cycle based optimization model for the cyclic railway timetabling problem
-
S. Voß and J.R. Daduna, eds., (CASPT 2000), Berlin: Springer 505
-
Peeters, L. and Kroon, L.G., 2001. A cycle based optimization model for the cyclic railway timetabling problem. In: S. Voß and J.R. Daduna, eds. Proceedings Computer aided scheduling of public transport (CASPT 2000) (p. 505). Berlin: Springer, 505.
-
(2001)
Proceedings Computer Aided Scheduling of Public Transport
, vol.505
-
-
Peeters, L.1
Kroon, L.G.2
-
20
-
-
0011529581
-
-
Timetable construction for Railned, Amsterdam: C.W.I. Center for Mathematics and Computer Science, Technical Report. (In Dutch)
-
Schrijver, A. and Steenbeek, A., 1994. Dienstregelingontwikkeling voor Railned [Timetable construction for Railned]. Amsterdam: C.W.I. Center for Mathematics and Computer Science, Technical Report. (In Dutch).
-
(1994)
Dienstregelingontwikkeling Voor Railned
-
-
Schrijver, A.1
Steenbeek, A.2
-
21
-
-
0008917539
-
A mathematical model for periodic scheduling problems
-
Serafini, P. and Ukovich, W., 1989. A mathematical model for periodic scheduling problems. SIAM Journal on Discrete Mathematics, 2 (4), 550-581.
-
(1989)
SIAM Journal on Discrete Mathematics
, vol.2
, Issue.4
, pp. 550-581
-
-
Serafini, P.1
Ukovich, W.2
-
22
-
-
79957987183
-
Sustainable global service intention as objective for controlling railway network operations in real time
-
Seoul
-
Wü st, R., Laube, F., Roos, S., and Caimi, G., 2008. Sustainable global service intention as objective for controlling railway network operations in real time. In: Proceedings of the 8th world congress of railway research (WCRR). Seoul.
-
(2008)
Proceedings of the 8th World Congress of Railway Research (WCRR)
-
-
Wüst, R.1
Laube, F.2
Roos, S.3
Caimi, G.4
|