-
1
-
-
79955925666
-
-
AER, Australian Energy Regulator, Regulatory Test version 3 & Application Guidelines, November.
-
AER, Australian Energy Regulator, 2007. Regulatory Test version 3 & Application Guidelines, November.
-
(2007)
-
-
-
2
-
-
0141458589
-
Competition innovation and productivity growth. A review of theory and evidence
-
January 17 OECD Economics Working Paper No. 317.
-
Ahn, S., 2002. Competition innovation and productivity growth. A review of theory and evidence. January 17 OECD Economics Working Paper No. 317.
-
(2002)
-
-
Ahn, S.1
-
3
-
-
51349140739
-
The California ISO transmission economic assessment methodology
-
Awad, M.S., et al., 2004. The California ISO transmission economic assessment methodology.
-
(2004)
-
-
Awad, M.S.1
-
4
-
-
0034414292
-
The competitive effects of transmission capacity in a deregulated electricity industry
-
Borenstein S., Bushnell J., Stoft S. The competitive effects of transmission capacity in a deregulated electricity industry. The RAND Journal of Economics 2000, 31(2):294-325.
-
(2000)
The RAND Journal of Economics
, vol.31
, Issue.2
, pp. 294-325
-
-
Borenstein, S.1
Bushnell, J.2
Stoft, S.3
-
5
-
-
33845415974
-
Alleged transmission inadequacy: is restructuring the cure or the cause?
-
Brennan T.J. Alleged transmission inadequacy: is restructuring the cure or the cause?. The Electricity Journal 2006, 19(4):42-51.
-
(2006)
The Electricity Journal
, vol.19
, Issue.4
, pp. 42-51
-
-
Brennan, T.J.1
-
7
-
-
18744392803
-
Electricity transmission: an overview of the current debate
-
Brunekreeft G., Neuhoff K., Newbery D. Electricity transmission: an overview of the current debate. Utilities Policy 2005, 13:73-93.
-
(2005)
Utilities Policy
, vol.13
, pp. 73-93
-
-
Brunekreeft, G.1
Neuhoff, K.2
Newbery, D.3
-
8
-
-
77952288693
-
Inefficient arbitrage in inter-regional electricity transmission
-
Bunn D., Zachmann G. Inefficient arbitrage in inter-regional electricity transmission. Journal of Regulatory Economics 2010, 37:243-265.
-
(2010)
Journal of Regulatory Economics
, vol.37
, pp. 243-265
-
-
Bunn, D.1
Zachmann, G.2
-
9
-
-
79961089330
-
CAISO, California ISO, Transmission economic assessment methodology
-
CAISO, California ISO, 2004. Transmission economic assessment methodology.
-
(2004)
-
-
-
10
-
-
79955927193
-
CAISO, California ISO, Economic evaluation of the palo verde-devers Line No. 2 (PVD2)
-
Board Report. February 24.
-
CAISO, California ISO, 2005. Economic evaluation of the palo verde-devers Line No. 2 (PVD2). Board Report. February 24.
-
(2005)
-
-
-
11
-
-
79955921947
-
CEER, Council of European Energy Regulators, Principles on Regulatory Control and Financial Reward for Infrastructure
-
Comments by ETSO-30 June 2003.
-
CEER, Council of European Energy Regulators, 2003. Principles on Regulatory Control and Financial Reward for Infrastructure. Comments by ETSO-30 June 2003.
-
(2003)
-
-
-
12
-
-
79955905701
-
CESI, Working Group "Electricity interconnections"
-
Phase II: methodology for the assessment of new infrastructures and application to the assessment of the interconnection projects already identified in the Baltic area.
-
CESI, 2009. Working Group "Electricity interconnections". Phase II: methodology for the assessment of new infrastructures and application to the assessment of the interconnection projects already identified in the Baltic area.
-
(2009)
-
-
-
13
-
-
79955920716
-
Commission for Energy Regulation, CER, 2006-2010 Transmission price control review
-
A Decision Paper. CER/05/143, 09 September, Ireland.
-
Commission for Energy Regulation, CER, 2005. 2006-2010 Transmission price control review. Transmission Asset Owner (TAO) and Transmission System Operator (TSO). A Decision Paper. CER/05/143, 09 September, Ireland.
-
(2005)
Transmission Asset Owner (TAO) and Transmission System Operator (TSO)
-
-
-
14
-
-
79955916582
-
Consentec, Frontier Economics, Analysis of cross-border congestion management methods for the EU Internal electricity market
-
Study commissioned by the European Commission, DGTREN.
-
Consentec, Frontier Economics, 2004. Analysis of cross-border congestion management methods for the EU Internal electricity market. Study commissioned by the European Commission, DGTREN.
-
(2004)
-
-
-
15
-
-
79955889771
-
Consentec, Frontier Economics, Improving incentives for investment in electricity transmission infrastructure
-
Study commissioned by the European Commission.
-
Consentec, Frontier Economics, 2008. Improving incentives for investment in electricity transmission infrastructure. Study commissioned by the European Commission.
-
(2008)
-
-
-
16
-
-
79955902824
-
-
CWRI: Central-West Regional Initiative, Regional reporting on electricity interconnection management and use in 2008, 16 March
-
CWRI: Central-West Regional Initiative, 2010. Regional reporting on electricity interconnection management and use in 2008, 16 March.
-
(2010)
-
-
-
17
-
-
79955914456
-
DKM, Costs and benefits of East-West interconnection between the Republic of Ireland and UK electricity systems
-
DKM, 2003. Costs and benefits of East-West interconnection between the Republic of Ireland and UK electricity systems. Report to the Commission for Energy Regulation.
-
(2003)
Report to the Commission for Energy Regulation
-
-
-
18
-
-
79955914216
-
-
DTe, Decision on the application of TenneT for permission to finance the NorNed cable in accordance with section 31 (6) of the Electricity Act of 1998, Decision 101783_2-76, The Hague.
-
DTe, 2004. Decision on the application of TenneT for permission to finance the NorNed cable in accordance with section 31 (6) of the Electricity Act of 1998, Decision 101783_2-76, The Hague.
-
(2004)
-
-
-
19
-
-
79955883826
-
-
EC: European Commission, Regulation on cross-border exchange as of July 1st, 2004. 26 June 2003 (1228/2003).
-
EC: European Commission, 2003. Regulation on cross-border exchange as of July 1st, 2004. 26 June 2003 (1228/2003).
-
(2003)
-
-
-
20
-
-
79955923814
-
-
EC: European Commission, DG competition report on energy sector inquiry, Brussels, 10 January 2007, SEC(2006).
-
EC: European Commission, 2007a. DG competition report on energy sector inquiry, Brussels, 10 January 2007, SEC(2006) p. 1724.
-
(2007)
, pp. 1724
-
-
-
21
-
-
79955900669
-
-
EC: European Commission, Priority interconnection plan, Brussels, 23 February 2007, com(2006) 846 final/2.
-
EC: European Commission, 2007b. Priority interconnection plan, Brussels, 23 February 2007, com(2006) 846 final/2.
-
(2007)
-
-
-
22
-
-
79955880768
-
EC: European Commission, Directorate General Regional Policy, Guide to cost-benefit analysis of investment projects
-
Structural Funds, Cohesion Fund and Instrument for Pre-Accession. Final Report. 16/06/2008.
-
EC: European Commission, Directorate General Regional Policy, 2008a. Guide to cost-benefit analysis of investment projects. Structural Funds, Cohesion Fund and Instrument for Pre-Accession. Final Report. 16/06/2008.
-
(2008)
-
-
-
23
-
-
79955901479
-
EC: European Commission, Green paper. Towards a secure, sustainable and competitive European energy network
-
Brussels, 13.11.2008. COM(2008) 782 final {SEC(2008)2869}.
-
EC: European Commission, 2008b. Green paper. Towards a secure, sustainable and competitive European energy network. Brussels, 13.11.2008. COM(2008) 782 final {SEC(2008)2869}.
-
(2008)
-
-
-
24
-
-
79955902279
-
-
EC: European Commission, The Commission proposes ε5 billion new investment in energy and Internet broadband infrastructure in 2009-2010, in support of the EU recovery plan. IP/09/142. Brussels, 28 January 2009.
-
EC: European Commission, 2009. The Commission proposes ε5 billion new investment in energy and Internet broadband infrastructure in 2009-2010, in support of the EU recovery plan. IP/09/142. Brussels, 28 January 2009.
-
(2009)
-
-
-
25
-
-
79955896654
-
ECF: European Climate Foundation, The Roadmap 2050, Brief on Power Networks
-
ECF: European Climate Foundation, 2010. The Roadmap 2050, Brief on Power Networks.
-
(2010)
-
-
-
26
-
-
12244293518
-
Evaluation of infrastructural projects; guide for cost-benefit analysis, Section I: Main Report. CPBs
-
Eijgenraam, C.J.J., Koopmans, C.C., Tang, P.J.G., Verster, A.C.P., 2000. Evaluation of infrastructural projects; guide for cost-benefit analysis, Section I: Main Report. CPB.
-
(2000)
-
-
Eijgenraam, C.J.J.1
Koopmans, C.C.2
Tang, P.J.G.3
Verster, A.C.P.4
-
27
-
-
79955926177
-
EirGrid, Business case
-
The development of an East West Electricity Interconnector, February.
-
EirGrid, 2008 Business case. The development of an East West Electricity Interconnector, February.
-
(2008)
-
-
-
28
-
-
79955907532
-
ERGEG: European Regulators' Group for Electricity and Gas, Incentive schemes to promote cross-border trade. Call for evidence
-
Ref: E08-ENM-07-04.
-
ERGEG: European Regulators' Group for Electricity and Gas, 2009. Incentive schemes to promote cross-border trade. Call for evidence. Ref: E08-ENM-07-04.
-
(2009)
-
-
-
29
-
-
79955911861
-
ERGEG: European Regulators' Group for Electricity and Gas, Final advice on the community-wide ten-year electricity network development plan
-
Ref: E10-ENM-22-03.
-
ERGEG: European Regulators' Group for Electricity and Gas, 2010. Final advice on the community-wide ten-year electricity network development plan. Ref: E10-ENM-22-03.
-
(2010)
-
-
-
30
-
-
79955915242
-
ENTSO-E: European Network of Transmission System Operators for Electricity, Ten-year network development plan 2010-2020
-
ENTSO-E: European Network of Transmission System Operators for Electricity, 2010. Ten-year network development plan 2010-2020.
-
(2010)
-
-
-
32
-
-
84906015374
-
Empirical Evidence on X-Efficiency, 1967-2004
-
Routledge, London, R. Frantz (Ed.)
-
Frantz R. Empirical Evidence on X-Efficiency, 1967-2004. Renaissance in Behavioral Economics 2007, Routledge, London. R. Frantz (Ed.).
-
(2007)
Renaissance in Behavioral Economics
-
-
Frantz, R.1
-
33
-
-
0034311595
-
Do we need more transmission capacity?
-
November
-
Hirst E. Do we need more transmission capacity?. The Electricity Journal 2000, (November):78-89.
-
(2000)
The Electricity Journal
, pp. 78-89
-
-
Hirst, E.1
-
34
-
-
79955880767
-
IEA, International Energy Agency, Security of supply in electricity markets
-
Evidence and Policy Issues, Paris.
-
IEA, International Energy Agency, 2002. Security of supply in electricity markets. Evidence and Policy Issues, Paris.
-
(2002)
-
-
-
35
-
-
0001036474
-
Restructuring, competition and regulatory reform in the U.S. electricity sector
-
Joskow P.L. Restructuring, competition and regulatory reform in the U.S. electricity sector. Journal of Economic Perspectives 1997, 11(3):119-138.
-
(1997)
Journal of Economic Perspectives
, vol.11
, Issue.3
, pp. 119-138
-
-
Joskow, P.L.1
-
36
-
-
18744366345
-
Transmission policy in the United States
-
Joskow P.L. Transmission policy in the United States. Utilities Policy 2005, 13:95-115.
-
(2005)
Utilities Policy
, vol.13
, pp. 95-115
-
-
Joskow, P.L.1
-
37
-
-
46149112034
-
Patterns of transmission investment
-
Mimeo, Department of Economics, MIT.
-
Joskow, P.L., 2005b. Patterns of transmission investment. Mimeo, Department of Economics, MIT.
-
(2005)
-
-
Joskow, P.L.1
-
38
-
-
10244230954
-
Long-term investment in electricity: a trade-off between co-ordination and competition?
-
Keller K., Wild J. Long-term investment in electricity: a trade-off between co-ordination and competition?. Utilities Policy 2004, 12:243-251.
-
(2004)
Utilities Policy
, vol.12
, pp. 243-251
-
-
Keller, K.1
Wild, J.2
-
40
-
-
34250899746
-
Cross-border transmission capacity allocation mechanisms in South East Europe
-
Kristiansen T. Cross-border transmission capacity allocation mechanisms in South East Europe. Energy Policy 2007, 35:4611-4622.
-
(2007)
Energy Policy
, vol.35
, pp. 4611-4622
-
-
Kristiansen, T.1
-
41
-
-
58349104112
-
Does more international transmission capacity increase competition in the Belgian electricity market?
-
Küpper G., et al. Does more international transmission capacity increase competition in the Belgian electricity market?. Electricity Journal 2009, 22(1):21-36.
-
(2009)
Electricity Journal
, vol.22
, Issue.1
, pp. 21-36
-
-
Küpper, G.1
-
42
-
-
0035585837
-
Transmission constraints and imperfect markets for power
-
Léautier T.-O. Transmission constraints and imperfect markets for power. Journal of Regulatory Economics 2001, 19:27-54.
-
(2001)
Journal of Regulatory Economics
, vol.19
, pp. 27-54
-
-
Léautier, T.-O.1
-
43
-
-
70349989505
-
Optimal expansion of the power transmission grid: why not?
-
Léautier T.-O., Thelen V. Optimal expansion of the power transmission grid: why not?. Journal of Regulatory Economics 2009, 36:127-153.
-
(2009)
Journal of Regulatory Economics
, vol.36
, pp. 127-153
-
-
Léautier, T.-O.1
Thelen, V.2
-
44
-
-
85008739296
-
X-inefficiency xists: a reply to an xorcist
-
Leibenstein H. X-inefficiency xists: a reply to an xorcist. American Economic Review 1978, 68:203-211.
-
(1978)
American Economic Review
, vol.68
, pp. 203-211
-
-
Leibenstein, H.1
-
45
-
-
0001318112
-
Allocative efficiency vs. 'X-Efficiency'
-
Leibenstein H. Allocative efficiency vs. 'X-Efficiency'. American Economic Review 1966, 56:392-415.
-
(1966)
American Economic Review
, vol.56
, pp. 392-415
-
-
Leibenstein, H.1
-
46
-
-
18744407702
-
Regulated and merchant interconnectors in Australia: SNI and Murraylink Revisited
-
The Cambridge-MIT Institute. Cambridge Working Papers in Economics CWPE 0410.
-
Littlechild, S., 2004. Regulated and merchant interconnectors in Australia: SNI and Murraylink Revisited. The Cambridge-MIT Institute. Cambridge Working Papers in Economics CWPE 0410.
-
(2004)
-
-
Littlechild, S.1
-
47
-
-
73149097481
-
Welfare and competition effects of electricity interconnection between Ireland and Great Britain
-
Malaguzzi Valeri L. Welfare and competition effects of electricity interconnection between Ireland and Great Britain. Energy Policy 2009, 37:4679-4688.
-
(2009)
Energy Policy
, vol.37
, pp. 4679-4688
-
-
Malaguzzi Valeri, L.1
-
48
-
-
79955916583
-
-
Ministry of Transport, jointly with and Ministry of Economic Affairs (Ministeries van V&W en EZ), Valuing risk, supplement to the OEI guidelines 'supplement to Eijgenraam et al., 2000' (in Dutch: Risicowaardering, Aanvulling op de Leidraad OEI), Den Haag.
-
Ministry of Transport, jointly with and Ministry of Economic Affairs (Ministeries van V&W en EZ), 2004. Valuing risk, supplement to the OEI guidelines 'supplement to Eijgenraam et al., 2000' (in Dutch: Risicowaardering, Aanvulling op de Leidraad OEI), Den Haag.
-
(2004)
-
-
-
49
-
-
79955878381
-
Competition benefits from electricity interconnectors. An IPA submission to the ACCC's review of the regulatory test for network augmentation
-
sEnergy Issues Paper Number 30, Institute of Public Affairs. Australia.
-
Moran, A., 2004. Competition benefits from electricity interconnectors. An IPA submission to the ACCC's review of the regulatory test for network augmentation. Energy Issues Paper Number 30, Institute of Public Affairs. Australia.
-
(2004)
-
-
Moran, A.1
-
50
-
-
33846785112
-
The value of supply security: the costs of power interruptions: economic input for damage reduction and investment in networks
-
De Nooij M., Koopmans C.C., Bijvoet C.C. The value of supply security: the costs of power interruptions: economic input for damage reduction and investment in networks. Energy Economics 2007, 29(2):277-295.
-
(2007)
Energy Economics
, vol.29
, Issue.2
, pp. 277-295
-
-
De Nooij, M.1
Koopmans, C.C.2
Bijvoet, C.C.3
-
51
-
-
71549139392
-
Divorce comes at a price: an ex ante welfare analysis of ownership unbundling of the distribution and commercial companies in the Dutch energy sector
-
De Nooij M., Baarsma B.E. Divorce comes at a price: an ex ante welfare analysis of ownership unbundling of the distribution and commercial companies in the Dutch energy sector. Energy Policy 2009, 37:5449-5458.
-
(2009)
Energy Policy
, vol.37
, pp. 5449-5458
-
-
De Nooij, M.1
Baarsma, B.E.2
-
53
-
-
79955903361
-
-
Nordel, Organisation for the Nordic Transmission System Operators, Nordic Grid Master Plan 2008.
-
Nordel, Organisation for the Nordic Transmission System Operators, 2008. Nordic Grid Master Plan 2008.
-
(2008)
-
-
-
54
-
-
79955885096
-
Nordic Competition Authorities, Capacity for competition
-
Investing for an efficient Nordic electricity market, No. 1/2007.
-
Nordic Competition Authorities, 2007. Capacity for competition. Investing for an efficient Nordic electricity market, No. 1/2007.
-
(2007)
-
-
-
55
-
-
79955884332
-
Sharing the costs of transmission expansion: a cooperative game theory approach applied on the Nordic electricity market
-
Paper Presented at the 10th IAEE European Conference. Vienna, 7-10 September.
-
Nylund, H., 2009. Sharing the costs of transmission expansion: a cooperative game theory approach applied on the Nordic electricity market. In: Paper Presented at the 10th IAEE European Conference. Vienna, 7-10 September.
-
(2009)
-
-
Nylund, H.1
-
56
-
-
65749103557
-
Simulation of the long-term dynamic of a market-based transmission interconnection
-
Ojeda O.A., Olsina F., Garcés F. Simulation of the long-term dynamic of a market-based transmission interconnection. Energy Policy 2009, 37:2889-2899.
-
(2009)
Energy Policy
, vol.37
, pp. 2889-2899
-
-
Ojeda, O.A.1
Olsina, F.2
Garcés, F.3
-
57
-
-
79955921724
-
PwC: PricewaterhouseCoopers, 100% renewable electricity
-
A roadmap to 2050 for Europe and North Africa.
-
PwC: PricewaterhouseCoopers, 2010. 100% renewable electricity. A roadmap to 2050 for Europe and North Africa.
-
(2010)
-
-
-
58
-
-
33845768321
-
Proactive planning and valuation of transmission investments in restructured electricity markets
-
Sauma E.E., Oren S.S. Proactive planning and valuation of transmission investments in restructured electricity markets. Journal of Regulatory Economics 2006, 30:261-290.
-
(2006)
Journal of Regulatory Economics
, vol.30
, pp. 261-290
-
-
Sauma, E.E.1
Oren, S.S.2
-
59
-
-
79955916059
-
SEM, Single Electricity Market Committee, Short to medium term interconnector issues in the SEM
-
SEM Committee Paper SEM-09-042.
-
SEM, Single Electricity Market Committee, 2009. Short to medium term interconnector issues in the SEM. SEM Committee Paper SEM-09-042.
-
(2009)
-
-
-
60
-
-
0001240075
-
The existence of X-efficiency
-
Stigler G. The existence of X-efficiency. American Economic Review 1976, 60:213-216.
-
(1976)
American Economic Review
, vol.60
, pp. 213-216
-
-
Stigler, G.1
-
61
-
-
79955901993
-
-
SKM Energy Consulting, Dutch-Norwegian interconnector, feasibility study on the socioeconomic benefits of a cable between Norway and the Netherlands, September.
-
SKM Energy Consulting, 2003. Dutch-Norwegian interconnector, feasibility study on the socioeconomic benefits of a cable between Norway and the Netherlands, September.
-
(2003)
-
-
-
62
-
-
67650726849
-
Transmission-constrained oligopoly in the Japanese electricity market
-
Tanaka M. Transmission-constrained oligopoly in the Japanese electricity market. Energy Economics 2009, 31:690-701.
-
(2009)
Energy Economics
, vol.31
, pp. 690-701
-
-
Tanaka, M.1
-
63
-
-
79955891944
-
-
sRapport on the valuation of the Norned project (in Dutch: Rapport Waardering Norned Project), (CA-04-0209), Arnhem, 26 August.
-
TenneT, 2004. Rapport on the valuation of the Norned project (in Dutch: Rapport Waardering Norned Project), (CA-04-0209), Arnhem, 26 August.
-
(2004)
-
-
Tenne, T.1
-
64
-
-
33846426874
-
Interconnector economics
-
Turvey R. Interconnector economics. Energy Policy 2006, 34:1457-1472.
-
(2006)
Energy Policy
, vol.34
, pp. 1457-1472
-
-
Turvey, R.1
-
65
-
-
0242467638
-
The 2003 blackout: solutions that won't cost a fortune
-
November
-
White D., Roschelle A., Peterson P., Schlissel D., Biewald B., Steinhurst W. The 2003 blackout: solutions that won't cost a fortune. The Electricity Journal 2003, 16(9):43-S. November.
-
(2003)
The Electricity Journal
, vol.16
, Issue.9
-
-
White, D.1
Roschelle, A.2
Peterson, P.3
Schlissel, D.4
Biewald, B.5
Steinhurst, W.6
|