Volumn 39, Issue 6, 2011, Pages 3096-3105

Social cost-benefit analysis of electricity interconnector investment: A critical appraisal

Author keywords

Infrastructures; Interconnector; Project evaluation

Indexed keywords

DISCOUNT RATES; EUROPEAN LEVELS; INFRASTRUCTURES; INTERCONNECTOR; INTERCONNECTORS; INVESTMENT PLAN; PROJECT EVALUATION; SOCIAL WELFARE; TRANSMISSION CAPACITIES; TRANSMISSION INVESTMENTS;

EID: 79955905442     PISSN: 03014215     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.enpol.2011.02.049     Document Type: Article
Times cited : (48)

References (65)
  • 1
    • 79955925666 scopus 로고    scopus 로고
    • AER, Australian Energy Regulator, Regulatory Test version 3 & Application Guidelines, November.
    • AER, Australian Energy Regulator, 2007. Regulatory Test version 3 & Application Guidelines, November.
    • (2007)
  • 2
    • 0141458589 scopus 로고    scopus 로고
    • Competition innovation and productivity growth. A review of theory and evidence
    • January 17 OECD Economics Working Paper No. 317.
    • Ahn, S., 2002. Competition innovation and productivity growth. A review of theory and evidence. January 17 OECD Economics Working Paper No. 317.
    • (2002)
    • Ahn, S.1
  • 3
    • 51349140739 scopus 로고    scopus 로고
    • The California ISO transmission economic assessment methodology
    • Awad, M.S., et al., 2004. The California ISO transmission economic assessment methodology.
    • (2004)
    • Awad, M.S.1
  • 4
    • 0034414292 scopus 로고    scopus 로고
    • The competitive effects of transmission capacity in a deregulated electricity industry
    • Borenstein S., Bushnell J., Stoft S. The competitive effects of transmission capacity in a deregulated electricity industry. The RAND Journal of Economics 2000, 31(2):294-325.
    • (2000) The RAND Journal of Economics , vol.31 , Issue.2 , pp. 294-325
    • Borenstein, S.1    Bushnell, J.2    Stoft, S.3
  • 5
    • 33845415974 scopus 로고    scopus 로고
    • Alleged transmission inadequacy: is restructuring the cure or the cause?
    • Brennan T.J. Alleged transmission inadequacy: is restructuring the cure or the cause?. The Electricity Journal 2006, 19(4):42-51.
    • (2006) The Electricity Journal , vol.19 , Issue.4 , pp. 42-51
    • Brennan, T.J.1
  • 7
    • 18744392803 scopus 로고    scopus 로고
    • Electricity transmission: an overview of the current debate
    • Brunekreeft G., Neuhoff K., Newbery D. Electricity transmission: an overview of the current debate. Utilities Policy 2005, 13:73-93.
    • (2005) Utilities Policy , vol.13 , pp. 73-93
    • Brunekreeft, G.1    Neuhoff, K.2    Newbery, D.3
  • 8
    • 77952288693 scopus 로고    scopus 로고
    • Inefficient arbitrage in inter-regional electricity transmission
    • Bunn D., Zachmann G. Inefficient arbitrage in inter-regional electricity transmission. Journal of Regulatory Economics 2010, 37:243-265.
    • (2010) Journal of Regulatory Economics , vol.37 , pp. 243-265
    • Bunn, D.1    Zachmann, G.2
  • 9
    • 79961089330 scopus 로고    scopus 로고
    • CAISO, California ISO, Transmission economic assessment methodology
    • CAISO, California ISO, 2004. Transmission economic assessment methodology.
    • (2004)
  • 10
    • 79955927193 scopus 로고    scopus 로고
    • CAISO, California ISO, Economic evaluation of the palo verde-devers Line No. 2 (PVD2)
    • Board Report. February 24.
    • CAISO, California ISO, 2005. Economic evaluation of the palo verde-devers Line No. 2 (PVD2). Board Report. February 24.
    • (2005)
  • 11
    • 79955921947 scopus 로고    scopus 로고
    • CEER, Council of European Energy Regulators, Principles on Regulatory Control and Financial Reward for Infrastructure
    • Comments by ETSO-30 June 2003.
    • CEER, Council of European Energy Regulators, 2003. Principles on Regulatory Control and Financial Reward for Infrastructure. Comments by ETSO-30 June 2003.
    • (2003)
  • 12
    • 79955905701 scopus 로고    scopus 로고
    • CESI, Working Group "Electricity interconnections"
    • Phase II: methodology for the assessment of new infrastructures and application to the assessment of the interconnection projects already identified in the Baltic area.
    • CESI, 2009. Working Group "Electricity interconnections". Phase II: methodology for the assessment of new infrastructures and application to the assessment of the interconnection projects already identified in the Baltic area.
    • (2009)
  • 13
    • 79955920716 scopus 로고    scopus 로고
    • Commission for Energy Regulation, CER, 2006-2010 Transmission price control review
    • A Decision Paper. CER/05/143, 09 September, Ireland.
    • Commission for Energy Regulation, CER, 2005. 2006-2010 Transmission price control review. Transmission Asset Owner (TAO) and Transmission System Operator (TSO). A Decision Paper. CER/05/143, 09 September, Ireland.
    • (2005) Transmission Asset Owner (TAO) and Transmission System Operator (TSO)
  • 14
    • 79955916582 scopus 로고    scopus 로고
    • Consentec, Frontier Economics, Analysis of cross-border congestion management methods for the EU Internal electricity market
    • Study commissioned by the European Commission, DGTREN.
    • Consentec, Frontier Economics, 2004. Analysis of cross-border congestion management methods for the EU Internal electricity market. Study commissioned by the European Commission, DGTREN.
    • (2004)
  • 15
    • 79955889771 scopus 로고    scopus 로고
    • Consentec, Frontier Economics, Improving incentives for investment in electricity transmission infrastructure
    • Study commissioned by the European Commission.
    • Consentec, Frontier Economics, 2008. Improving incentives for investment in electricity transmission infrastructure. Study commissioned by the European Commission.
    • (2008)
  • 16
    • 79955902824 scopus 로고    scopus 로고
    • CWRI: Central-West Regional Initiative, Regional reporting on electricity interconnection management and use in 2008, 16 March
    • CWRI: Central-West Regional Initiative, 2010. Regional reporting on electricity interconnection management and use in 2008, 16 March.
    • (2010)
  • 17
    • 79955914456 scopus 로고    scopus 로고
    • DKM, Costs and benefits of East-West interconnection between the Republic of Ireland and UK electricity systems
    • DKM, 2003. Costs and benefits of East-West interconnection between the Republic of Ireland and UK electricity systems. Report to the Commission for Energy Regulation.
    • (2003) Report to the Commission for Energy Regulation
  • 18
    • 79955914216 scopus 로고    scopus 로고
    • DTe, Decision on the application of TenneT for permission to finance the NorNed cable in accordance with section 31 (6) of the Electricity Act of 1998, Decision 101783_2-76, The Hague.
    • DTe, 2004. Decision on the application of TenneT for permission to finance the NorNed cable in accordance with section 31 (6) of the Electricity Act of 1998, Decision 101783_2-76, The Hague.
    • (2004)
  • 19
    • 79955883826 scopus 로고    scopus 로고
    • EC: European Commission, Regulation on cross-border exchange as of July 1st, 2004. 26 June 2003 (1228/2003).
    • EC: European Commission, 2003. Regulation on cross-border exchange as of July 1st, 2004. 26 June 2003 (1228/2003).
    • (2003)
  • 20
    • 79955923814 scopus 로고    scopus 로고
    • EC: European Commission, DG competition report on energy sector inquiry, Brussels, 10 January 2007, SEC(2006).
    • EC: European Commission, 2007a. DG competition report on energy sector inquiry, Brussels, 10 January 2007, SEC(2006) p. 1724.
    • (2007) , pp. 1724
  • 21
    • 79955900669 scopus 로고    scopus 로고
    • EC: European Commission, Priority interconnection plan, Brussels, 23 February 2007, com(2006) 846 final/2.
    • EC: European Commission, 2007b. Priority interconnection plan, Brussels, 23 February 2007, com(2006) 846 final/2.
    • (2007)
  • 22
    • 79955880768 scopus 로고    scopus 로고
    • EC: European Commission, Directorate General Regional Policy, Guide to cost-benefit analysis of investment projects
    • Structural Funds, Cohesion Fund and Instrument for Pre-Accession. Final Report. 16/06/2008.
    • EC: European Commission, Directorate General Regional Policy, 2008a. Guide to cost-benefit analysis of investment projects. Structural Funds, Cohesion Fund and Instrument for Pre-Accession. Final Report. 16/06/2008.
    • (2008)
  • 23
    • 79955901479 scopus 로고    scopus 로고
    • EC: European Commission, Green paper. Towards a secure, sustainable and competitive European energy network
    • Brussels, 13.11.2008. COM(2008) 782 final {SEC(2008)2869}.
    • EC: European Commission, 2008b. Green paper. Towards a secure, sustainable and competitive European energy network. Brussels, 13.11.2008. COM(2008) 782 final {SEC(2008)2869}.
    • (2008)
  • 24
    • 79955902279 scopus 로고    scopus 로고
    • EC: European Commission, The Commission proposes ε5 billion new investment in energy and Internet broadband infrastructure in 2009-2010, in support of the EU recovery plan. IP/09/142. Brussels, 28 January 2009.
    • EC: European Commission, 2009. The Commission proposes ε5 billion new investment in energy and Internet broadband infrastructure in 2009-2010, in support of the EU recovery plan. IP/09/142. Brussels, 28 January 2009.
    • (2009)
  • 25
    • 79955896654 scopus 로고    scopus 로고
    • ECF: European Climate Foundation, The Roadmap 2050, Brief on Power Networks
    • ECF: European Climate Foundation, 2010. The Roadmap 2050, Brief on Power Networks.
    • (2010)
  • 26
    • 12244293518 scopus 로고    scopus 로고
    • Evaluation of infrastructural projects; guide for cost-benefit analysis, Section I: Main Report. CPBs
    • Eijgenraam, C.J.J., Koopmans, C.C., Tang, P.J.G., Verster, A.C.P., 2000. Evaluation of infrastructural projects; guide for cost-benefit analysis, Section I: Main Report. CPB.
    • (2000)
    • Eijgenraam, C.J.J.1    Koopmans, C.C.2    Tang, P.J.G.3    Verster, A.C.P.4
  • 27
    • 79955926177 scopus 로고    scopus 로고
    • EirGrid, Business case
    • The development of an East West Electricity Interconnector, February.
    • EirGrid, 2008 Business case. The development of an East West Electricity Interconnector, February.
    • (2008)
  • 28
    • 79955907532 scopus 로고    scopus 로고
    • ERGEG: European Regulators' Group for Electricity and Gas, Incentive schemes to promote cross-border trade. Call for evidence
    • Ref: E08-ENM-07-04.
    • ERGEG: European Regulators' Group for Electricity and Gas, 2009. Incentive schemes to promote cross-border trade. Call for evidence. Ref: E08-ENM-07-04.
    • (2009)
  • 29
    • 79955911861 scopus 로고    scopus 로고
    • ERGEG: European Regulators' Group for Electricity and Gas, Final advice on the community-wide ten-year electricity network development plan
    • Ref: E10-ENM-22-03.
    • ERGEG: European Regulators' Group for Electricity and Gas, 2010. Final advice on the community-wide ten-year electricity network development plan. Ref: E10-ENM-22-03.
    • (2010)
  • 30
    • 79955915242 scopus 로고    scopus 로고
    • ENTSO-E: European Network of Transmission System Operators for Electricity, Ten-year network development plan 2010-2020
    • ENTSO-E: European Network of Transmission System Operators for Electricity, 2010. Ten-year network development plan 2010-2020.
    • (2010)
  • 32
    • 84906015374 scopus 로고    scopus 로고
    • Empirical Evidence on X-Efficiency, 1967-2004
    • Routledge, London, R. Frantz (Ed.)
    • Frantz R. Empirical Evidence on X-Efficiency, 1967-2004. Renaissance in Behavioral Economics 2007, Routledge, London. R. Frantz (Ed.).
    • (2007) Renaissance in Behavioral Economics
    • Frantz, R.1
  • 33
    • 0034311595 scopus 로고    scopus 로고
    • Do we need more transmission capacity?
    • November
    • Hirst E. Do we need more transmission capacity?. The Electricity Journal 2000, (November):78-89.
    • (2000) The Electricity Journal , pp. 78-89
    • Hirst, E.1
  • 34
    • 79955880767 scopus 로고    scopus 로고
    • IEA, International Energy Agency, Security of supply in electricity markets
    • Evidence and Policy Issues, Paris.
    • IEA, International Energy Agency, 2002. Security of supply in electricity markets. Evidence and Policy Issues, Paris.
    • (2002)
  • 35
    • 0001036474 scopus 로고    scopus 로고
    • Restructuring, competition and regulatory reform in the U.S. electricity sector
    • Joskow P.L. Restructuring, competition and regulatory reform in the U.S. electricity sector. Journal of Economic Perspectives 1997, 11(3):119-138.
    • (1997) Journal of Economic Perspectives , vol.11 , Issue.3 , pp. 119-138
    • Joskow, P.L.1
  • 36
    • 18744366345 scopus 로고    scopus 로고
    • Transmission policy in the United States
    • Joskow P.L. Transmission policy in the United States. Utilities Policy 2005, 13:95-115.
    • (2005) Utilities Policy , vol.13 , pp. 95-115
    • Joskow, P.L.1
  • 37
    • 46149112034 scopus 로고    scopus 로고
    • Patterns of transmission investment
    • Mimeo, Department of Economics, MIT.
    • Joskow, P.L., 2005b. Patterns of transmission investment. Mimeo, Department of Economics, MIT.
    • (2005)
    • Joskow, P.L.1
  • 38
    • 10244230954 scopus 로고    scopus 로고
    • Long-term investment in electricity: a trade-off between co-ordination and competition?
    • Keller K., Wild J. Long-term investment in electricity: a trade-off between co-ordination and competition?. Utilities Policy 2004, 12:243-251.
    • (2004) Utilities Policy , vol.12 , pp. 243-251
    • Keller, K.1    Wild, J.2
  • 40
    • 34250899746 scopus 로고    scopus 로고
    • Cross-border transmission capacity allocation mechanisms in South East Europe
    • Kristiansen T. Cross-border transmission capacity allocation mechanisms in South East Europe. Energy Policy 2007, 35:4611-4622.
    • (2007) Energy Policy , vol.35 , pp. 4611-4622
    • Kristiansen, T.1
  • 41
    • 58349104112 scopus 로고    scopus 로고
    • Does more international transmission capacity increase competition in the Belgian electricity market?
    • Küpper G., et al. Does more international transmission capacity increase competition in the Belgian electricity market?. Electricity Journal 2009, 22(1):21-36.
    • (2009) Electricity Journal , vol.22 , Issue.1 , pp. 21-36
    • Küpper, G.1
  • 42
    • 0035585837 scopus 로고    scopus 로고
    • Transmission constraints and imperfect markets for power
    • Léautier T.-O. Transmission constraints and imperfect markets for power. Journal of Regulatory Economics 2001, 19:27-54.
    • (2001) Journal of Regulatory Economics , vol.19 , pp. 27-54
    • Léautier, T.-O.1
  • 43
    • 70349989505 scopus 로고    scopus 로고
    • Optimal expansion of the power transmission grid: why not?
    • Léautier T.-O., Thelen V. Optimal expansion of the power transmission grid: why not?. Journal of Regulatory Economics 2009, 36:127-153.
    • (2009) Journal of Regulatory Economics , vol.36 , pp. 127-153
    • Léautier, T.-O.1    Thelen, V.2
  • 44
    • 85008739296 scopus 로고
    • X-inefficiency xists: a reply to an xorcist
    • Leibenstein H. X-inefficiency xists: a reply to an xorcist. American Economic Review 1978, 68:203-211.
    • (1978) American Economic Review , vol.68 , pp. 203-211
    • Leibenstein, H.1
  • 45
    • 0001318112 scopus 로고
    • Allocative efficiency vs. 'X-Efficiency'
    • Leibenstein H. Allocative efficiency vs. 'X-Efficiency'. American Economic Review 1966, 56:392-415.
    • (1966) American Economic Review , vol.56 , pp. 392-415
    • Leibenstein, H.1
  • 46
    • 18744407702 scopus 로고    scopus 로고
    • Regulated and merchant interconnectors in Australia: SNI and Murraylink Revisited
    • The Cambridge-MIT Institute. Cambridge Working Papers in Economics CWPE 0410.
    • Littlechild, S., 2004. Regulated and merchant interconnectors in Australia: SNI and Murraylink Revisited. The Cambridge-MIT Institute. Cambridge Working Papers in Economics CWPE 0410.
    • (2004)
    • Littlechild, S.1
  • 47
    • 73149097481 scopus 로고    scopus 로고
    • Welfare and competition effects of electricity interconnection between Ireland and Great Britain
    • Malaguzzi Valeri L. Welfare and competition effects of electricity interconnection between Ireland and Great Britain. Energy Policy 2009, 37:4679-4688.
    • (2009) Energy Policy , vol.37 , pp. 4679-4688
    • Malaguzzi Valeri, L.1
  • 48
    • 79955916583 scopus 로고    scopus 로고
    • Ministry of Transport, jointly with and Ministry of Economic Affairs (Ministeries van V&W en EZ), Valuing risk, supplement to the OEI guidelines 'supplement to Eijgenraam et al., 2000' (in Dutch: Risicowaardering, Aanvulling op de Leidraad OEI), Den Haag.
    • Ministry of Transport, jointly with and Ministry of Economic Affairs (Ministeries van V&W en EZ), 2004. Valuing risk, supplement to the OEI guidelines 'supplement to Eijgenraam et al., 2000' (in Dutch: Risicowaardering, Aanvulling op de Leidraad OEI), Den Haag.
    • (2004)
  • 49
    • 79955878381 scopus 로고    scopus 로고
    • Competition benefits from electricity interconnectors. An IPA submission to the ACCC's review of the regulatory test for network augmentation
    • sEnergy Issues Paper Number 30, Institute of Public Affairs. Australia.
    • Moran, A., 2004. Competition benefits from electricity interconnectors. An IPA submission to the ACCC's review of the regulatory test for network augmentation. Energy Issues Paper Number 30, Institute of Public Affairs. Australia.
    • (2004)
    • Moran, A.1
  • 50
    • 33846785112 scopus 로고    scopus 로고
    • The value of supply security: the costs of power interruptions: economic input for damage reduction and investment in networks
    • De Nooij M., Koopmans C.C., Bijvoet C.C. The value of supply security: the costs of power interruptions: economic input for damage reduction and investment in networks. Energy Economics 2007, 29(2):277-295.
    • (2007) Energy Economics , vol.29 , Issue.2 , pp. 277-295
    • De Nooij, M.1    Koopmans, C.C.2    Bijvoet, C.C.3
  • 51
    • 71549139392 scopus 로고    scopus 로고
    • Divorce comes at a price: an ex ante welfare analysis of ownership unbundling of the distribution and commercial companies in the Dutch energy sector
    • De Nooij M., Baarsma B.E. Divorce comes at a price: an ex ante welfare analysis of ownership unbundling of the distribution and commercial companies in the Dutch energy sector. Energy Policy 2009, 37:5449-5458.
    • (2009) Energy Policy , vol.37 , pp. 5449-5458
    • De Nooij, M.1    Baarsma, B.E.2
  • 53
    • 79955903361 scopus 로고    scopus 로고
    • Nordel, Organisation for the Nordic Transmission System Operators, Nordic Grid Master Plan 2008.
    • Nordel, Organisation for the Nordic Transmission System Operators, 2008. Nordic Grid Master Plan 2008.
    • (2008)
  • 54
    • 79955885096 scopus 로고    scopus 로고
    • Nordic Competition Authorities, Capacity for competition
    • Investing for an efficient Nordic electricity market, No. 1/2007.
    • Nordic Competition Authorities, 2007. Capacity for competition. Investing for an efficient Nordic electricity market, No. 1/2007.
    • (2007)
  • 55
    • 79955884332 scopus 로고    scopus 로고
    • Sharing the costs of transmission expansion: a cooperative game theory approach applied on the Nordic electricity market
    • Paper Presented at the 10th IAEE European Conference. Vienna, 7-10 September.
    • Nylund, H., 2009. Sharing the costs of transmission expansion: a cooperative game theory approach applied on the Nordic electricity market. In: Paper Presented at the 10th IAEE European Conference. Vienna, 7-10 September.
    • (2009)
    • Nylund, H.1
  • 56
    • 65749103557 scopus 로고    scopus 로고
    • Simulation of the long-term dynamic of a market-based transmission interconnection
    • Ojeda O.A., Olsina F., Garcés F. Simulation of the long-term dynamic of a market-based transmission interconnection. Energy Policy 2009, 37:2889-2899.
    • (2009) Energy Policy , vol.37 , pp. 2889-2899
    • Ojeda, O.A.1    Olsina, F.2    Garcés, F.3
  • 57
    • 79955921724 scopus 로고    scopus 로고
    • PwC: PricewaterhouseCoopers, 100% renewable electricity
    • A roadmap to 2050 for Europe and North Africa.
    • PwC: PricewaterhouseCoopers, 2010. 100% renewable electricity. A roadmap to 2050 for Europe and North Africa.
    • (2010)
  • 58
    • 33845768321 scopus 로고    scopus 로고
    • Proactive planning and valuation of transmission investments in restructured electricity markets
    • Sauma E.E., Oren S.S. Proactive planning and valuation of transmission investments in restructured electricity markets. Journal of Regulatory Economics 2006, 30:261-290.
    • (2006) Journal of Regulatory Economics , vol.30 , pp. 261-290
    • Sauma, E.E.1    Oren, S.S.2
  • 59
    • 79955916059 scopus 로고    scopus 로고
    • SEM, Single Electricity Market Committee, Short to medium term interconnector issues in the SEM
    • SEM Committee Paper SEM-09-042.
    • SEM, Single Electricity Market Committee, 2009. Short to medium term interconnector issues in the SEM. SEM Committee Paper SEM-09-042.
    • (2009)
  • 60
    • 0001240075 scopus 로고
    • The existence of X-efficiency
    • Stigler G. The existence of X-efficiency. American Economic Review 1976, 60:213-216.
    • (1976) American Economic Review , vol.60 , pp. 213-216
    • Stigler, G.1
  • 61
    • 79955901993 scopus 로고    scopus 로고
    • SKM Energy Consulting, Dutch-Norwegian interconnector, feasibility study on the socioeconomic benefits of a cable between Norway and the Netherlands, September.
    • SKM Energy Consulting, 2003. Dutch-Norwegian interconnector, feasibility study on the socioeconomic benefits of a cable between Norway and the Netherlands, September.
    • (2003)
  • 62
    • 67650726849 scopus 로고    scopus 로고
    • Transmission-constrained oligopoly in the Japanese electricity market
    • Tanaka M. Transmission-constrained oligopoly in the Japanese electricity market. Energy Economics 2009, 31:690-701.
    • (2009) Energy Economics , vol.31 , pp. 690-701
    • Tanaka, M.1
  • 63
    • 79955891944 scopus 로고    scopus 로고
    • sRapport on the valuation of the Norned project (in Dutch: Rapport Waardering Norned Project), (CA-04-0209), Arnhem, 26 August.
    • TenneT, 2004. Rapport on the valuation of the Norned project (in Dutch: Rapport Waardering Norned Project), (CA-04-0209), Arnhem, 26 August.
    • (2004)
    • Tenne, T.1
  • 64
    • 33846426874 scopus 로고    scopus 로고
    • Interconnector economics
    • Turvey R. Interconnector economics. Energy Policy 2006, 34:1457-1472.
    • (2006) Energy Policy , vol.34 , pp. 1457-1472
    • Turvey, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.