1
-
-
33846425537
-
-
Basslink Joint Advisory Panel, 2002. Final Panel Report on the Basslink Proposal (Chapters 3 and 4).
-
-
-
-
3
-
-
33846429378
-
-
Commission for Energy Regulation (CER), 2003. Market Arrangements for Electricity-Interconnector Trading Principles An MAE Consultation.
-
-
-
-
4
-
-
33846439174
-
-
DKM Economic Consultants, Economic and Social Research Institute and Electrotec Ireland, 2003, Costs and Benefits of East-West Interconnection between the Republic of Ireland and UK Electricity Systems: Report to the Commission for Energy Regulation.
-
-
-
-
5
-
-
33846463972
-
-
ECON Analyse, 2003. Kraftkabel til England?-samfunnsøkonomisk lønnsomhet.
-
-
-
-
6
-
-
33846457555
-
-
ETSO, 2001a. Definitions of Transfer Capacities in liberalised Electricity Markets.
-
-
-
-
7
-
-
33846465194
-
-
ETSO, 2001b. Co-ordinated Auctioning: A market-based method for transmission capacity allocation in meshed networks.
-
-
-
-
8
-
-
33846444147
-
-
ETSO, 2004. Cross-border electricity exchanges on meshed AC power systems.
-
-
-
-
9
-
-
33846419975
-
-
ETSO and EuroPEX, 2004. Flow-based market coupling.
-
-
-
-
10
-
-
33846457170
-
-
EuroPEX, 2003. Using Implicit Auctions to Manage Cross-Border Congestion: 'Decentralised Market Coupling', Paper by presented at the Tenth Meeting of the European Electricity Regulatory Forum.
-
-
-
-
11
-
-
33846421784
-
-
Frontier economics and Consentec, 2004. Analysis of Cross-Border Congestion Management Methods for the EU Internal Electricity Market, Study conducted for the European Commission Directorate General Energy and Transport.
-
-
-
-
12
-
-
33846432164
-
-
Harvey, S.M., Pope, S.L., Buechler, J.P., Thompson, R.M., 2001. Feasibility Study for a Combined Day-Ahead Market in the Northeast.
-
-
-
-
13
-
-
33846456796
-
-
Institute of Power Systems and Power Technology of Aachen University of Technology and CONSENTEC, 2001. Analysis of Electricity Network Capacities and Identification of Congestion; Final Report.
-
-
-
-
14
-
-
33846441815
-
-
Intelligent Energy Systems, 2000. Application Of The ACCC Regulatory Test To SNI. Report to TransGrid.
-
-
-
-
15
-
-
33846441433
-
-
ISO New England, Inc. and New York ISO, Inc., 2003. Virtual Regional Dispatch Concept, Evaluation, and Proposal a Joint Working Paper.
-
-
-
-
16
-
-
33846460212
-
-
LECG, LLC and KEMA Consulting, Inc., 2001. Feasibility Study for a combined Day Ahead market in the northeast, Study prepared for the ISO-New England, New York ISO, and Ontario IMO.
-
-
-
-
17
-
-
33846435877
-
-
Littlechild, S., 2003. Regulated and Merchant Interconnectors in Australia: SNI and Murraylink Revisited, CMI Project, http://www.econ.cam.ac.uk/electricity/.
-
-
-
-
18
-
-
33846422541
-
-
National Grid Company, 2003. Interconnexion France-Angleterre (France-England Interconnector) IFA User Guide Issue 4.1.
-
-
-
-
19
-
-
33846433879
-
-
NERA, 2003. ROI Interface Study An Interim Report for the IME Group.
-
-
-
-
20
-
-
33846428227
-
-
OFREG, 2003. Interconnector Allocation Arrangements 2004-05, Consultation Paper June 2003.
-
-
-
-
21
-
-
33846440314
-
-
RTE, 2004. Détermination des capacités commerciales d'échange et des coûts de congestion associés.
-
-
-
-
22
-
-
33846422948
-
-
Turvey, R., Anderson, D., 1977. Electricity Economics, chapter 18 Cost structure in hydro and hydro-thermal systems.
-
-
-
|