메뉴 건너뛰기




Volumn 18, Issue 3, 2011, Pages 234-247

A fuzzy approach for assessing contractors' competitiveness

Author keywords

Competitive strategy; Construction industry; Fuzzy control; Hong Kong; Linguistics

Indexed keywords

ASSESSMENT PROCESS; COMPETITION STRATEGY; COMPETITIVE ADVANTAGE; COMPETITIVE STRATEGY; DESIGN/METHODOLOGY/APPROACH; FUZZY APPROACH; FUZZY NUMBERS; HONG KONG CONSTRUCTION INDUSTRY; HONG-KONG; INTERNAL ANALYSIS; LINGUISTIC TERMS;

EID: 79955677651     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/09699981111126151     Document Type: Article
Times cited : (13)

References (36)
  • 1
    • 0030230766 scopus 로고    scopus 로고
    • On a metric distance between fuzzy sets
    • Chaudhuri, B.B. and Rosenfeld, A. (1996), “On a metric distance between fuzzy sets”, Pattern Recognition Letters, Vol. 17 No. 11, pp. 1157–60.
    • (1996) Pattern Recognition Letters , vol.17 , Issue.11 , pp. 1157-1160
    • Chaudhuri, B.B.1    Rosenfeld, A.2
  • 2
    • 0002296389 scopus 로고    scopus 로고
    • Extensions of the TOPSIS for group decision making under fuzzy environment
    • Chen, C.T. (2000), “Extensions of the TOPSIS for group decision making under fuzzy environment”, Fuzzy Sets and Systems, Vol. 114 No. 1, pp. 1–9.
    • (2000) Fuzzy Sets and Systems , vol.114 , Issue.1 , pp. 1-9
    • Chen, C.T.1
  • 3
    • 0035255180 scopus 로고    scopus 로고
    • A fuzzy approach to select the location of the distribution center
    • Chen, C.T. (2001), “A fuzzy approach to select the location of the distribution center”, Fuzzy Sets and Systems, Vol. 118 No. 1, pp. 65–73.
    • (2001) Fuzzy Sets and Systems , vol.118 , Issue.1 , pp. 65-73
    • Chen, C.T.1
  • 7
    • 0001072506 scopus 로고    scopus 로고
    • The effect of contract type and size on competitiveness in bidding
    • Drew, D. and Skitmore, M. (1997), “The effect of contract type and size on competitiveness in bidding”, Construction Management and Economics, Vol. 15 No. 5, pp. 469–89.
    • (1997) Construction Management and Economics , vol.15 , Issue.5 , pp. 469-489
    • Drew, D.1    Skitmore, M.2
  • 8
    • 38249016004 scopus 로고
    • Multi-attribute fuzzy decisions in construction strategies
    • Eldukair, Z.A. and Ayyub, B.M. (1992), “Multi-attribute fuzzy decisions in construction strategies”, Fuzzy Sets and Systems, Vol. 46 No. 2, pp. 155–65.
    • (1992) Fuzzy Sets and Systems , vol.46 , Issue.2 , pp. 155-165
    • Eldukair, Z.A.1    Ayyub, B.M.2
  • 9
    • 0002861004 scopus 로고    scopus 로고
    • Competitive bidding strategy model and software system for bid preparation
    • Fayek, A. (1998), “Competitive bidding strategy model and software system for bid preparation”, Journal of Construction Engineering and Management, ASCE, Vol. 124 No. 1, pp. 1–10.
    • (1998) Journal of Construction Engineering and Management, ASCE , vol.124 , Issue.1 , pp. 1-10
    • Fayek, A.1
  • 10
    • 0032595459 scopus 로고    scopus 로고
    • Decision support for fuzzy comprehensive evaluation of urban development
    • Feng, S. and Xu, L.D. (1999), “Decision support for fuzzy comprehensive evaluation of urban development”, Fuzzy Sets and Systems, Vol. 105 No. 1, pp. 1–12.
    • (1999) Fuzzy Sets and Systems , vol.105 , Issue.1 , pp. 1-12
    • Feng, S.1    Xu, L.D.2
  • 11
    • 0005404434 scopus 로고
    • An examination of the tendering pattern of individual building contractors
    • Flanagan, R. and Norman, G. (1982), “An examination of the tendering pattern of individual building contractors”, Building Technology and Management, Vol. 20 No. 4, pp. 25–8.
    • (1982) Building Technology and Management , vol.20 , Issue.4 , pp. 25-28
    • Flanagan, R.1    Norman, G.2
  • 12
    • 0035897956 scopus 로고    scopus 로고
    • Fuzzy clustering with squared Minkowski distances
    • Groenen, P.J.F. and Jajuga, K. (2001), “Fuzzy clustering with squared Minkowski distances”, Fuzzy Sets and Systems, Vol. 120 No. 2, pp. 227–37.
    • (2001) Fuzzy Sets and Systems , vol.120 , Issue.2 , pp. 227-237
    • Groenen, P.J.F.1    Jajuga, K.2
  • 13
    • 0011120861 scopus 로고    scopus 로고
    • Representation and application of fuzzy numbers
    • Heilpern, S. (1997), “Representation and application of fuzzy numbers”, Fuzzy Sets and Systems, Vol. 91 No. 2, pp. 259–68.
    • (1997) Fuzzy Sets and Systems , vol.91 , Issue.2 , pp. 259-268
    • Heilpern, S.1
  • 17
    • 43049148350 scopus 로고    scopus 로고
    • MBNQA-oriented self-assessment quality management system for contractors: fuzzy AHP approach
    • Lam, K.C., Lam, M.C.K. and Wang, D. (2008), “MBNQA-oriented self-assessment quality management system for contractors: fuzzy AHP approach”, Construction Management & Economics, Vol. 26 No. 5, pp. 447–61.
    • (2008) Construction Management & Economics , vol.26 , Issue.5 , pp. 447-461
    • Lam, K.C.1    Lam, M.C.K.2    Wang, D.3
  • 18
    • 0042774614 scopus 로고    scopus 로고
    • Parameters assessing construction company's competitiveness in China
    • (in Chinese).
    • Li, Q.M., Tan, Y.T. and Shen, L.Y. (2002), “Parameters assessing construction company's competitiveness in China”, Journal of Construction Economics, No. 3, pp. 8–11 (in Chinese).
    • (2002) Journal of Construction Economics , Issue.3 , pp. 8-11
    • Li, Q.M.1    Tan, Y.T.2    Shen, L.Y.3
  • 20
    • 3342977741 scopus 로고    scopus 로고
    • Bid/no-bid decision making – a fuzzy linguistic approach
    • Lin, C.T. and Chen, Y.T. (2004), “Bid/no-bid decision making – a fuzzy linguistic approach”, International Journal of Project Management, Vol. 22 No. 7, pp. 585–93.
    • (2004) International Journal of Project Management , vol.22 , Issue.7 , pp. 585-593
    • Lin, C.T.1    Chen, Y.T.2
  • 21
    • 0028424412 scopus 로고
    • Why triangular membership functions?
    • Pedrycz, W. (1994), “Why triangular membership functions?”, Fuzzy Sets and Systems, Vol. 64 No. 1, pp. 21–30.
    • (1994) Fuzzy Sets and Systems , vol.64 , Issue.1 , pp. 21-30
    • Pedrycz, W.1
  • 23
    • 69149100520 scopus 로고    scopus 로고
    • Predicting and evaluating construction trades foremen's performance: fuzzy logic approach
    • Poveda, C.A. and Fayek, A.R. (2009), “Predicting and evaluating construction trades foremen's performance: fuzzy logic approach”, Journal of Construction Engineering and Management, Vol. 135 No. 9, pp. 920–9.
    • (2009) Journal of Construction Engineering and Management , vol.135 , Issue.9 , pp. 920-929
    • Poveda, C.A.1    Fayek, A.R.2
  • 28
    • 0042827946 scopus 로고    scopus 로고
    • A computer-aided decision support system for assessing a contractor's competitiveness
    • Shen, L.Y., Lu, W.S., Shen, Q.P. and Li, H. (2003), “A computer-aided decision support system for assessing a contractor's competitiveness”, Automation in Construction, Vol. 12 No. 5, pp. 577–87.
    • (2003) Automation in Construction , vol.12 , Issue.5 , pp. 577-587
    • Shen, L.Y.1    Lu, W.S.2    Shen, Q.P.3    Li, H.4
  • 30
    • 0013337442 scopus 로고    scopus 로고
    • A proposal for construction project risk assessment using fuzzy logic
    • Tah, J.H.M. and Carr, V. (2000), “A proposal for construction project risk assessment using fuzzy logic”, Construction Management and Economics, Vol. 18 No. 4, pp. 491–500.
    • (2000) Construction Management and Economics , vol.18 , Issue.4 , pp. 491-500
    • Tah, J.H.M.1    Carr, V.2
  • 31
    • 43149089130 scopus 로고    scopus 로고
    • Multiple-objective bidding strategy using goal-programming technique
    • Tan, Y.T., Shen, L.Y., Lu, W.S. and Shen, Q.P. (2008), “Multiple-objective bidding strategy using goal-programming technique”, Management Decision, Vol. 46 No. 4, pp. 656–72.
    • (2008) Management Decision , vol.46 , Issue.4 , pp. 656-672
    • Tan, Y.T.1    Shen, L.Y.2    Lu, W.S.3    Shen, Q.P.4
  • 32
    • 79955702522 scopus 로고    scopus 로고
    • Contractor key competitiveness indicators (KCIs): a Hong Kong study
    • Tan, Y.T., Shen, L.Y., Yam, M.C.H. and Lo, A.A.C. (2007), “Contractor key competitiveness indicators (KCIs): a Hong Kong study”, Surveying and Built Environment, Vol. 18 No. 2, pp. 33–46.
    • (2007) Surveying and Built Environment , vol.18 , Issue.2 , pp. 33-46
    • Tan, Y.T.1    Shen, L.Y.2    Yam, M.C.H.3    Lo, A.A.C.4
  • 33
    • 33749666636 scopus 로고    scopus 로고
    • An interactive method for fuzzy multiple attribute group decision making
    • Xu, Z.S. and Chen, J. (2007), “An interactive method for fuzzy multiple attribute group decision making”, Information Sciences, Vol. 177 No. 1, pp. 248–63.
    • (2007) Information Sciences , vol.177 , Issue.1 , pp. 248-263
    • Xu, Z.S.1    Chen, J.2
  • 34
    • 34248666540 scopus 로고
    • Fuzzy sets
    • Zadeh, L.A. (1965), “Fuzzy sets”, Information and Control, Vol. 8 No. 3, pp. 338–53.
    • (1965) Information and Control , vol.8 , Issue.3 , pp. 338-353
    • Zadeh, L.A.1
  • 35
    • 34548665502 scopus 로고    scopus 로고
    • Fuzzy analytical hierarchy process risk assessment approach for joint venture construction projects in China
    • Zhang, G.M. and Zou, X.W. (2007), “Fuzzy analytical hierarchy process risk assessment approach for joint venture construction projects in China”, Journal of Construction Engineering and Management, Vol. 133 No. 10, pp. 771–9.
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.10 , pp. 771-779
    • Zhang, G.M.1    Zou, X.W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.