메뉴 건너뛰기




Volumn 38, Issue 9, 2011, Pages 10787-10793

Metaheuristic methods in hybrid flow shop scheduling problem

Author keywords

Memetic algorithms; Particle swarm optimization; Simulated annealing; Tabu search

Indexed keywords

CONVENTIONAL METHODS; FASTER CONVERGENCE; HYBRID ALGORITHMS; HYBRID EVOLUTIONARY ALGORITHM; HYBRID FLOW SHOP SCHEDULING; HYBRID HEURISTIC ALGORITHMS; LOCAL SEARCH; LOCAL SEARCH METHOD; MEMETIC; MEMETIC ALGORITHMS; META-HEURISTIC METHODS;

EID: 79955605428     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2011.01.173     Document Type: Article
Times cited : (29)

References (25)
  • 1
    • 21844510777 scopus 로고
    • Shop scheduling problems with multiprocessor tasks on dedicated processors
    • P. Brucker, and B. Kramer Shop scheduling problems with multiprocessor tasks on dedicated processors Annals of Operations Research 50 1995 13 27
    • (1995) Annals of Operations Research , vol.50 , pp. 13-27
    • Brucker, P.1    Kramer, B.2
  • 3
    • 0033079757 scopus 로고    scopus 로고
    • General multiprocessor task scheduling
    • J. Chan, and C.Y. Lee General multiprocessor task scheduling Naval Research Logistics 46 1999 57 74
    • (1999) Naval Research Logistics , vol.46 , pp. 57-74
    • Chan, J.1    Lee, C.Y.2
  • 5
    • 0042261208 scopus 로고    scopus 로고
    • An integrated approach for modelling and solving the general multiprocessor job-shop scheduling problem using tabu search
    • S. Dauzre-Pérs, and J. Paulli An integrated approach for modelling and solving the general multiprocessor job-shop scheduling problem using tabu search Annals of Operations Research 70 1997 281 306
    • (1997) Annals of Operations Research , vol.70 , pp. 281-306
    • Dauzre-Pérs, S.1    Paulli, J.2
  • 6
    • 0031122887 scopus 로고    scopus 로고
    • Ant colony system: A cooperative learning approach to the traveling salesman problem
    • PII S1089778X97033031
    • M. Dorigo, and L.M. Gambardella Ant colony system: A cooperative learning approach to the travelling sales man problem IEEE Transactions in Evolutionary Computing 1 1997 53 66 (Pubitemid 127771018)
    • (1997) IEEE Transactions on Evolutionary Computation , vol.1 , Issue.1 , pp. 53-66
    • Dorigo, M.1    Gambardella, L.M.2
  • 7
    • 0030262783 scopus 로고    scopus 로고
    • Scheduling multiprocessor tasks - An overview
    • DOI 10.1016/0377-2217(96)00123-3, PII S0377221796001233
    • M. Drozdowski Scheduling multiprocessor tasks - An overview European Journal of Operational Research 94 1996 215 230 (Pubitemid 126385629)
    • (1996) European Journal of Operational Research , vol.94 , Issue.2 , pp. 215-230
    • Drozdowski, M.1
  • 8
    • 0023995996 scopus 로고
    • Two stage hybrid flow shop scheduling problem
    • J.N.D. Gupta Two stage hybrid flow shop scheduling problem Journal of Operational Research Society 39 4 1988 359 364
    • (1988) Journal of Operational Research Society , vol.39 , Issue.4 , pp. 359-364
    • Gupta, J.N.D.1
  • 9
    • 8344223707 scopus 로고    scopus 로고
    • Population-based approach to multiprocessor task scheduling in multistage hybrid flow shops
    • J. Jdrzêjowicz, and P. Jdrzêjowicz Population-based approach to multiprocessor task scheduling in multistage hybrid flow shops Lecture Notes in Computer Science 2773 2003 279 286
    • (2003) Lecture Notes in Computer Science , vol.2773 , pp. 279-286
    • Jdrzêjowicz, J.1    Jdrzêjowicz, P.2
  • 10
    • 37649004659 scopus 로고    scopus 로고
    • A performance study of multiprocessor task scheduling algorithms
    • S. Jin, G. Schiavone, and D. Turgut A performance study of multiprocessor task scheduling algorithms Journal of Supercomputing 43 2008 77 97
    • (2008) Journal of Supercomputing , vol.43 , pp. 77-97
    • Jin, S.1    Schiavone, G.2    Turgut, D.3
  • 12
    • 0022121187 scopus 로고
    • An approximation algorithm for diagnostic test scheduling in multi-computer systems
    • H. Krawczyk, and M. Kubale An approximation algorithm for diagnostic test scheduling in multi-computer systems IEEE Transactions on Computers 2 1985 869 877
    • (1985) IEEE Transactions on Computers , vol.2 , pp. 869-877
    • Krawczyk, H.1    Kubale, M.2
  • 13
    • 0032672426 scopus 로고    scopus 로고
    • Scheduling one and two-processors tasks on two parallel processors
    • C.Y. Lee, and X. Cai Scheduling one and two-processors tasks on two parallel processors IIE Transactions 31 1999 445 455
    • (1999) IIE Transactions , vol.31 , pp. 445-455
    • Lee, C.Y.1    Cai, X.2
  • 16
    • 0038183858 scopus 로고    scopus 로고
    • Heuristic algorithms for multiprocessor task scheduling in a two stage hybrid flow shop
    • C. Ouz, M.F. Ercan, T.C.E. Cheng, and Y.F. Fung Heuristic algorithms for multiprocessor task scheduling in a two stage hybrid flow shop European Journal of Operations Research 149 2003 390 403
    • (2003) European Journal of Operations Research , vol.149 , pp. 390-403
    • Ouz, C.1    Ercan, M.F.2    Cheng, T.C.E.3    Fung, Y.F.4
  • 18
    • 45449118697 scopus 로고    scopus 로고
    • Particle swarm optimization an overview
    • R. Poli, J. Kennedy, and T. Blackwell Particle swarm optimization an overview Swarm Intelligence 1 3 2007 33 57
    • (2007) Swarm Intelligence , vol.1 , Issue.3 , pp. 33-57
    • Poli, R.1    Kennedy, J.2    Blackwell, T.3
  • 19
    • 36148996530 scopus 로고    scopus 로고
    • Proportionate flexible flow shop scheduling via a hybrid constructive genetic algorithm
    • D.F. Shiau, S.C. Cheng, and Y.M. Huang Proportionate flexible flow shop scheduling via a hybrid constructive genetic algorithm Expert Systems with Applications 34 2008 1133 1143
    • (2008) Expert Systems with Applications , vol.34 , pp. 1133-1143
    • Shiau, D.F.1    Cheng, S.C.2    Huang, Y.M.3
  • 21
    • 48249084195 scopus 로고    scopus 로고
    • A particle swarm optimization algorithm for hybrid flowshop scheduling with multiprocessor tasks
    • C.T. Tseng, and C.J. Liao A particle swarm optimization algorithm for hybrid flowshop scheduling with multiprocessor tasks International Journal of Production Research 46 2008 4655 4670
    • (2008) International Journal of Production Research , vol.46 , pp. 4655-4670
    • Tseng, C.T.1    Liao, C.J.2
  • 23
    • 33744526968 scopus 로고    scopus 로고
    • A hybrid particle swarm optimization approach for the jobshop scheduling problem
    • W.J. Xia, and Z.M. Wu A hybrid particle swarm optimization approach for the jobshop scheduling problem International Journal of Advance Manufacturing Technology 29 2006 360 366
    • (2006) International Journal of Advance Manufacturing Technology , vol.29 , pp. 360-366
    • Xia, W.J.1    Wu, Z.M.2
  • 24
    • 33745125063 scopus 로고    scopus 로고
    • Multiprocessor task scheduling in multistage hybrid flowshops: An ant colony system approach
    • K.C. Ying, and S.W. Lin Multiprocessor task scheduling in multistage hybrid flowshops: An ant colony system approach International Journal of Production Research 44 2006 3161 3177
    • (2006) International Journal of Production Research , vol.44 , pp. 3161-3177
    • Ying, K.C.1    Lin, S.W.2
  • 25
    • 79955642064 scopus 로고    scopus 로고
    • Iterated greedy heuristic for multiprocessor task scheduling problems
    • K.C. Ying Iterated greedy heuristic for multiprocessor task scheduling problems Journal of the Operations Research Society 1 2008 8
    • (2008) Journal of the Operations Research Society , vol.1 , pp. 8
    • Ying, K.C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.