-
1
-
-
21844518507
-
Scheduling multiprocessor tasks on a dynamic configuration of dedicated processors
-
L. Bianco, J. Blazewicz, P. Dell'Olmo, and M. Drozdowski, Scheduling multiprocessor tasks on a dynamic configuration of dedicated processors, Ann Operations Res 58 (1995), 493-517.
-
(1995)
Ann Operations Res
, vol.58
, pp. 493-517
-
-
Bianco, L.1
Blazewicz, J.2
Dell'Olmo, P.3
Drozdowski, M.4
-
2
-
-
0027617230
-
Preemptive scheduling of multiprocessor task on the dedicated processor system subject to minimal lateness
-
L. Bianco, J. Blazewicz, P. Dell'Olmo, and M. Drozdowski, Preemptive scheduling of multiprocessor task on the dedicated processor system subject to minimal lateness, Inf Process Lett 46 (1993), 109-113.
-
(1993)
Inf Process Lett
, vol.46
, pp. 109-113
-
-
Bianco, L.1
Blazewicz, J.2
Dell'Olmo, P.3
Drozdowski, M.4
-
3
-
-
0042636814
-
Preemptive multiprocessor task scheduling with release times and time windows
-
L. Bianco, J. Blazewicz, P. Dell'Olmo, and M. Drozdowski, Preemptive multiprocessor task scheduling with release times and time windows, Ann Operations Res Sched 70 (1997), 43-57.
-
(1997)
Ann Operations Res Sched
, vol.70
, pp. 43-57
-
-
Bianco, L.1
Blazewicz, J.2
Dell'Olmo, P.3
Drozdowski, M.4
-
4
-
-
0027110432
-
Scheduling multiprocessor tasks on three dedicated processors
-
J.K. Blazewicz, P. Dell'Olmo, M. Drozdowski, and M.G. Speranza, Scheduling multiprocessor tasks on three dedicated processors, Inf Process Lett 41 (1992), 275-280.
-
(1992)
Inf Process Lett
, vol.41
, pp. 275-280
-
-
Blazewicz, J.K.1
Dell'Olmo, P.2
Drozdowski, M.3
Speranza, M.G.4
-
5
-
-
0022717856
-
Scheduling multiprocessor tasks to minimize schedule length
-
J.K. Blazewicz, M. Drabowski, and J. Weglarz, Scheduling multiprocessor tasks to minimize schedule length, IEEE Trans Comput C-35 (1986), 389-393.
-
(1986)
IEEE Trans Comput
, vol.C-35
, pp. 389-393
-
-
Blazewicz, J.K.1
Drabowski, M.2
Weglarz, J.3
-
6
-
-
0028730353
-
Scheduling multiprocess tasks - A survey
-
J.K. Blazewicz, W. Drazdowski, and J. Weglarz, Scheduling multiprocess tasks - a survey, Microcomput Appl 13 (1994), 89-97.
-
(1994)
Microcomput Appl
, vol.13
, pp. 89-97
-
-
Blazewicz, J.K.1
Drazdowski, W.2
Weglarz, J.3
-
7
-
-
0043159033
-
Scheduling independent two-processor tasks on a uniform duo-processor system
-
J. Blazewicz, M. Drozdowski, G. Schmidt, and D. de Werra, Scheduling independent two-processor tasks on a uniform duo-processor system, Discrete Appl Math 28 (1990), 11-20.
-
(1990)
Discrete Appl Math
, vol.28
, pp. 11-20
-
-
Blazewicz, J.1
Drozdowski, M.2
Schmidt, G.3
De Werra, D.4
-
8
-
-
0021450897
-
Scheduling independent 2-processor tasks to minimize scheduling length
-
J.K. Blazewicz, J. Weglarz, and M. Drabowski, Scheduling independent 2-processor tasks to minimize scheduling length, Inf Process Lett 18 (1984), 267-273.
-
(1984)
Inf Process Lett
, vol.18
, pp. 267-273
-
-
Blazewicz, J.K.1
Weglarz, J.2
Drabowski, M.3
-
10
-
-
21844510777
-
Shop scheduling problems with multiprocessor tasks on dedicated processors
-
P. Brucker and A. Kramer, Shop scheduling problems with multiprocessor tasks on dedicated processors, Ann Operations Res 57 (1995), 13-27.
-
(1995)
Ann Operations Res
, vol.57
, pp. 13-27
-
-
Brucker, P.1
Kramer, A.2
-
11
-
-
0030125537
-
Polynomial algorithms for resource-constrained and multiprocessor task scheduling problems
-
P. Brucker and A. Kramer, Polynomial algorithms for resource-constrained and multiprocessor task scheduling problems, Eur J Operational Res 90 (1996), 214-226.
-
(1996)
Eur J Operational Res
, vol.90
, pp. 214-226
-
-
Brucker, P.1
Kramer, A.2
-
12
-
-
0032024270
-
Scheduling multiprocessor tasks with prespecified processor allocations
-
X. Cai, C.-Y. Lee, and C.L. Li, Scheduling multiprocessor tasks with prespecified processor allocations, Naval Res Logistics 45 (1998), 231-242.
-
(1998)
Naval Res Logistics
, vol.45
, pp. 231-242
-
-
Cai, X.1
Lee, C.-Y.2
Li, C.L.3
-
13
-
-
0024701172
-
Simultaneous resource scheduling to minimize weighted flow times
-
G. Dobson and U. Karmarkar, Simultaneous resource scheduling to minimize weighted flow times, Operations Res 37 (1989), 592-600.
-
(1989)
Operations Res
, vol.37
, pp. 592-600
-
-
Dobson, G.1
Karmarkar, U.2
-
14
-
-
0029392252
-
Simultaneous resource scheduling with batching to minimize weighted flow times
-
G. Dobson and I. Khosla, Simultaneous resource scheduling with batching to minimize weighted flow times, IIE Trans 27 (1995), 587-598.
-
(1995)
IIE Trans
, vol.27
, pp. 587-598
-
-
Dobson, G.1
Khosla, I.2
-
15
-
-
0030262783
-
Scheduling multiprocessor tasks - An overview
-
M. Drozdowski, Scheduling multiprocessor tasks - an overview, Eur J Operational Res 94 (1996), 215-230.
-
(1996)
Eur J Operational Res
, vol.94
, pp. 215-230
-
-
Drozdowski, M.1
-
16
-
-
0001021215
-
Complexity of scheduling parallel task systems
-
J. Du and J.Y.-T. Leung, Complexity of scheduling parallel task systems, SIAM J Discrete Math 2 (1989), 473-487.
-
(1989)
SIAM J Discrete Math
, vol.2
, pp. 473-487
-
-
Du, J.1
Leung, J.Y.-T.2
-
18
-
-
0000071158
-
Complexity of scheduling multiprocessor tasks with prespecified allocations
-
J.A. Hoogeveen, S.L. van de Velde, and B. Deltman, Complexity of scheduling multiprocessor tasks with prespecified allocations, Discrete Appl Math 55 (1994), 259-272.
-
(1994)
Discrete Appl Math
, vol.55
, pp. 259-272
-
-
Hoogeveen, J.A.1
Van De Velde, S.L.2
Deltman, B.3
-
20
-
-
0022121187
-
An approximation algorithm for diagnostic test scheduling in multicomputer systems
-
H. Krawczyk and M. Kubale, An approximation algorithm for diagnostic test scheduling in multicomputer systems, IEEE Trans Comput 34 (1985), 869-872.
-
(1985)
IEEE Trans Comput
, vol.34
, pp. 869-872
-
-
Krawczyk, H.1
Kubale, M.2
-
21
-
-
0023289230
-
The complexity of scheduling independent two-processor tasks on dedicated processors
-
M. Kubale, The complexity of scheduling independent two-processor tasks on dedicated processors, Inf Process Lett 24 (1987), 141-147.
-
(1987)
Inf Process Lett
, vol.24
, pp. 141-147
-
-
Kubale, M.1
-
23
-
-
0000049036
-
Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint
-
C.-Y. Lee, Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint, Operations Res Lett 20 (1997), 129-139.
-
(1997)
Operations Res Lett
, vol.20
, pp. 129-139
-
-
Lee, C.-Y.1
-
25
-
-
0031492360
-
Current trends in deterministic scheduling
-
C.-Y. Lee, L. Lei, and M. Pinedo, Current trends in deterministic scheduling, Ann Operations Res 70 (1997), 1-42.
-
(1997)
Ann Operations Res
, vol.70
, pp. 1-42
-
-
Lee, C.-Y.1
Lei, L.2
Pinedo, M.3
-
26
-
-
0032072364
-
Machine scheduling with multiple-job-on-one-machine pattern
-
C.-L. Li, X. Cai, and C.-Y. Lee, Machine scheduling with multiple-job-on-one-machine pattern, IIE Trans 30, (1998), 433-446.
-
(1998)
IIE Trans
, vol.30
, pp. 433-446
-
-
Li, C.-L.1
Cai, X.2
Lee, C.-Y.3
-
27
-
-
0025703662
-
Preemptive scheduling of independent jobs with release times and deadlines on a hypercube
-
J. Plehn, Preemptive scheduling of independent jobs with release times and deadlines on a hypercube, Inf Process Lett C-34 (1990), 161-166.
-
(1990)
Inf Process Lett
, vol.C-34
, pp. 161-166
-
-
Plehn, J.1
-
28
-
-
0025673181
-
Multiprocessor scheduling with communication delays
-
B. Veltmann, B.J. Lageweg, and J.K. Lenstra, Multiprocessor scheduling with communication delays, Parallel Comput 16 (1990), 173-182.
-
(1990)
Parallel Comput
, vol.16
, pp. 173-182
-
-
Veltmann, B.1
Lageweg, B.J.2
Lenstra, J.K.3
|