메뉴 건너뛰기




Volumn , Issue , 2007, Pages 3329-3334

Pareto archived PSO optimization for time-cost tradeoff analysis

Author keywords

Multiobjective optimization; Pareto dominance; PSO; Time cost tradeoff

Indexed keywords

NONDOMINATED SOLUTIONS; PARETO DOMINANCE; TIME-COST ANALYSIS; TIME-COST TRADEOFF;

EID: 79955213422     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/CEC.2007.4424901     Document Type: Conference Paper
Times cited : (2)

References (25)
  • 1
    • 0000181338 scopus 로고
    • A network flow computation for project cost curves
    • Fulkerson, D.R. "A Network Flow Computation for Project Cost Curves." Management Science, 7, 127-178, 1961.
    • (1961) Management Science , vol.7 , pp. 127-178
    • Fulkerson, D.R.1
  • 2
    • 0015484051 scopus 로고
    • Critical path problems with concave cost-time curves
    • Falk, J. and Horowitz, J.L. "Critical path problems with concave cost-time curves." Management Science, 19, pp. 446-455, 1972.
    • (1972) Management Science , vol.19 , pp. 446-455
    • Falk, J.1    Horowitz, J.L.2
  • 3
    • 0027222453 scopus 로고
    • PERT and crashing revisited: Mathematical generalizations
    • Foldes, S. and Soumis, F. "PERT and crashing revisited: mathematical generalizations." European Journal of Operational Research, 64, pp. 286-294, 1993.
    • (1993) European Journal of Operational Research , vol.64 , pp. 286-294
    • Foldes, S.1    Soumis, F.2
  • 6
    • 0032208139 scopus 로고    scopus 로고
    • Approximation algorithms for the discrete time-cost tradeoff problem
    • Skutella, M. "Approximation algorithms for the discrete time-cost tradeoff problem." Mathematics of Operations Research, 23(4), pp. 909-929, 1998.
    • (1998) Mathematics of Operations Research , vol.23 , Issue.4 , pp. 909-929
    • Skutella, M.1
  • 8
    • 24944537152 scopus 로고    scopus 로고
    • Chance-constrained time-cost tradeoff analysis considering funding variability
    • ASCE
    • Yang, I. T. "Chance-constrained time-cost tradeoff analysis considering funding variability." Journal of Construction Engineering and Management, ASCE, 131(9), pp. 1002-1012, 2005.
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.9 , pp. 1002-1012
    • Yang, I.T.1
  • 9
    • 0017638717 scopus 로고
    • Solving the project time/cost tradeoff problem using the minimal cut concept
    • Phillips, S. and Dessouky, M. I. "Solving the project time/cost tradeoff problem using the minimal cut concept." Management Science, 24, pp. 393-400, 1977.
    • (1977) Management Science , vol.24 , pp. 393-400
    • Phillips, S.1    Dessouky, M.I.2
  • 11
  • 12
    • 0027302082 scopus 로고
    • Resource allocation via dynamic programming in activity networks
    • Elmaghraby, S. E. "Resource allocation via dynamic programming in activity networks", European Journal of Operational Research, 64, 199-215, 1993.
    • (1993) European Journal of Operational Research , vol.64 , pp. 199-215
    • Elmaghraby, S.E.1
  • 13
    • 0031185451 scopus 로고    scopus 로고
    • Using genetic algorithms to solve construction time-cost trade-off problems
    • ASCE
    • Feng, C.W., Liu, L.Y., and Burns, S.A. "Using genetic algorithms to solve construction time-cost trade-off problems." Journal of Computing in Civil Engineering, ASCE, 11(3), pp. 184-189, 1997.
    • (1997) Journal of Computing in Civil Engineering , vol.11 , Issue.3 , pp. 184-189
    • Feng, C.W.1    Liu, L.Y.2    Burns, S.A.3
  • 14
    • 0033312040 scopus 로고    scopus 로고
    • GA-based multicriteria optimal model for construction scheduling
    • ASCE
    • Leu, S.S. and Yang, C.H. "GA-based multicriteria optimal model for construction scheduling." Journal of Construction Engineering and Management, ASCE, 125(6), pp. 420-427, 1999.
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.6 , pp. 420-427
    • Leu, S.S.1    Yang, C.H.2
  • 15
    • 0032638332 scopus 로고    scopus 로고
    • Using Machine learning and GA to solve time-cost tradeoff problems
    • ASCE
    • Li, H., Cao, J.N., and Love, P.E.D. "Using Machine learning and GA to solve time-cost tradeoff problems." Journal of Construction Engineering and Management, ASCE, 125(5), pp. 347-353, 1999.
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.5 , pp. 347-353
    • Li, H.1    Cao, J.N.2    Love, P.E.D.3
  • 16
    • 12344265028 scopus 로고    scopus 로고
    • Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization
    • ASCE
    • Zheng, D.X.M., Ng, S.T., and Kumaraswamy, M.M. "Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization." Journal of Construction Engineering and Management, ASCE, 131(1), pp. 81-91, 2005.
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.1 , pp. 81-91
    • Zheng, D.X.M.1    Ng, S.T.2    Kumaraswamy, M.M.3
  • 19
    • 0035350696 scopus 로고    scopus 로고
    • Swarm intelligence: A whole new way to think about business
    • Bonabeau, E. and Meyer C. "Swarm intelligence: A whole new way to think about business." Harvard Business Review, pp. 107-114, 2001.
    • (2001) Harvard Business Review , pp. 107-114
    • Bonabeau, E.1    Meyer, C.2
  • 21
    • 31944448941 scopus 로고    scopus 로고
    • A study of particle swarm optimization particle trajectories
    • van den Bergh, F. and Engelbrecht, A. P. "A study of particle swarm optimization particle trajectories." Information Sciences, 176(8), pp. 937-971, 2006.
    • (2006) Information Sciences , vol.176 , Issue.8 , pp. 937-971
    • Van Den Bergh, F.1    Engelbrecht, A.P.2
  • 22
    • 84879015433 scopus 로고    scopus 로고
    • Parameter selection in particle swarm optimization
    • Evolutionary Programming VII, V.W. Porto, N. Saravanan, D. Waagen and A.E. Eiben, eds., Springer-Verlag, Berlin, German
    • Shi, Y. and Eberhart, R.C. "Parameter selection in particle swarm optimization." Lecture Notes in Computer Science 1447: Evolutionary Programming VII, V.W. Porto, N. Saravanan, D. Waagen and A.E. Eiben, eds., Springer-Verlag, Berlin, German, pp. 591-600, 1998.
    • (1998) Lecture Notes in Computer Science , vol.1447 , pp. 591-600
    • Shi, Y.1    Eberhart, R.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.