Volumn 49, Issue 12, 2011, Pages 3731-3749

A bilinear programming model and a modified branch-and-bound algorithm for production planning in steel rolling mills with substitutable demand

Author keywords

demand substitution; mixed integer bilinear program; modified branch and bound algorithm; steel mills

Indexed keywords

BILINEAR PROGRAMMING; BRANCH AND BOUNDS; BRANCH-AND-BOUND ALGORITHMS; DEMAND SUBSTITUTION; INTEGRATED PRODUCTION; INVENTORY PROBLEM; LINEARISATION; LOT SIZE; LOT SIZING PROBLEMS; MANUFACTURING PROCESS; MASTER PRODUCTION SCHEDULE; MIXED INTEGER; MIXED INTEGER LINEAR PROGRAM; MODIFIED BRANCH AND BOUND ALGORITHM; MULTI-ITEM; PROBLEM INSTANCES; PRODUCTION PLANNING; PRODUCTION PLANNING IS; SPECIAL STRUCTURE; STEEL MILLS; TECHNOLOGICAL CONSTRAINTS; TOTAL COSTS;

EID: 79953832540     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207541003690116     Document Type: Article
Times cited : (14)

References (40)
  • 1
    • 34848866290 scopus 로고    scopus 로고
    • The multi-item capacitated lot-sizing problem with setup times and shortage costs
    • DOI 10.1016/j.ejor.2006.01.053, PII S0377221706006540
    • Absi, N. and Kedad-Sidhoum, S., 2008. The multi-item capacitated lot sizing problem with setup times and shortage costs. European Journal of Operational Research, 185(3), 1351-1374. (Pubitemid 47498815)
    • (2008) European Journal of Operational Research , vol.185 , Issue.3 , pp. 1351-1374
    • Absi, N.1    Kedad-Sidhoum, S.2
  • 2
    • 0025405388 scopus 로고
    • Linearization strategies for a class of zero-one mixed integer programming problems
    • Adams, W. P. and Sherali, H. D., 1990. Linearization strategies for a class of zero-one mixed integer programming problems. Operations Research, 38(2), 217-226.
    • (1990) Operations Research , vol.38 , Issue.2 , pp. 217-226
    • Adams, W.P.1    Sherali, H.D.2
  • 3
    • 34248586692 scopus 로고    scopus 로고
    • Linear forms of nonlinear expressions: New insights on old ideas
    • DOI 10.1016/j.orl.2006.08.008, PII S0167637706001064
    • Adams, W. P. and Forrester, R. J., 2007. Linear forms of nonlinear expressions: new insights on old ideas. Operations Research Letters, 35(4), 510-518. (Pubitemid 46755920)
    • (2007) Operations Research Letters , vol.35 , Issue.4 , pp. 510-518
    • Adams, W.P.1    Forrester, R.J.2
  • 4
    • 0037138042 scopus 로고    scopus 로고
    • LP-based heuristics for the capacitated lot-sizing problem: The interaction of model formulation and solution algorithm
    • DOI 10.1080/00207540110081461
    • Alfieri, A., Brandimarte, P., and D'Orazio, S., 2002. LP-based heuristics for the capacitated lot-sizing problem: the interaction of model formulation and solution algorithm. International Journal of Production Research, 40(2), 441-458. (Pubitemid 34593837)
    • (2002) International Journal of Production Research , vol.40 , Issue.2 , pp. 441-458
    • Alfieri, A.1    Brandimarte, P.2    D'Orazio, S.3
  • 6
    • 0012650071 scopus 로고    scopus 로고
    • Requirements planning with substitutions: Exploiting bill-of-materials flexibility in production planning
    • Balakrishnan, A. and Geunes, J., 2000. Requirements planning with substitutions: exploiting bill-of-materials flexibility in production planning. Manufacturing and Service Operations Management, 2(2), 166-185.
    • (2000) Manufacturing and Service Operations Management , vol.2 , Issue.2 , pp. 166-185
    • Balakrishnan, A.1    Geunes, J.2
  • 7
    • 0032594140 scopus 로고    scopus 로고
    • Single-period multi-product inventory models with substitution
    • Bassok, Y., Anupindi, R., and Akella, R., 1999. Single-period multi-product inventory models with substitution. Operations Research, 47(4), 632-642.
    • (1999) Operations Research , vol.47 , Issue.4 , pp. 632-642
    • Bassok, Y.1    Anupindi, R.2    Akella, R.3
  • 8
    • 0020194024 scopus 로고
    • Computational complexity of the capacitated lot size problem
    • Bitran, G. R. and Yanasse, H. H., 1982. Computational complexity of the capacitated lot size problem. Management Science, 28(10), 1174-1186.
    • (1982) Management Science , vol.28 , Issue.10 , pp. 1174-1186
    • Bitran, G.R.1    Yanasse, H.H.2
  • 9
    • 0026927325 scopus 로고
    • Ordering policies in an environment of stochastic yields and substitutable demands
    • Bitran, G. R. and Dasu, S., 1992. Ordering policies in an environment of stochastic yields and substitutable demands. Operations Research, 40(5), 999-1017. (Pubitemid 23581839)
    • (1992) Operations Research , vol.40 , Issue.5 , pp. 999-1017
    • Bitran, G.R.1    Dasu, S.2
  • 10
    • 3543146083 scopus 로고    scopus 로고
    • A linear programming model for integrated steel production and distribution planning
    • Chen, M. and Wang, W., 1997. A linear programming model for integrated steel production and distribution planning. International Journal of Production and Operations Management, 17(6), 592-610.
    • (1997) International Journal of Production and Operations Management , vol.17 , Issue.6 , pp. 592-610
    • Chen, M.1    Wang, W.2
  • 11
    • 0038062833 scopus 로고    scopus 로고
    • Managing increasing product variety at integrated steel mills
    • Denton, B., Gupta, D., and Jawahir, K., 2003. Managing increasing product variety at integrated steel mills. Interfaces, 33(2), 41-53. (Pubitemid 36571190)
    • (2003) Interfaces , vol.33 , Issue.2 , pp. 41-53
    • Denton, B.1    Gupta, D.2    Jawahir, K.3
  • 12
    • 0346607177 scopus 로고    scopus 로고
    • A survey of mathematical programming applications in integrated steel plants
    • Dutta, G. and Fourer, R., 2001. A survey of mathematical programming applications in integrated steel plants. Manufacturing and Service Operations Management, 3(4), 387-400. (Pubitemid 33664121)
    • (2001) Manufacturing and Service Operations Management , vol.3 , Issue.4 , pp. 387-400
    • Dutta, G.1    Fourer, R.2
  • 13
    • 0040789449 scopus 로고
    • A linear programming model of integrated iron and steel production
    • Fabian, T., 1958. A linear programming model of integrated iron and steel production. Management Sciences, 4(4), 415-449.
    • (1958) Management Sciences , vol.4 , Issue.4 , pp. 415-449
    • Fabian, T.1
  • 15
    • 0016619730 scopus 로고
    • Improved linear integer programming formulations of nonlinear integer problems
    • Glover, F., 1975. Improved linear integer programming formulations of nonlinear integer problems. Management Science, 22(4), 455-460.
    • (1975) Management Science , vol.22 , Issue.4 , pp. 455-460
    • Glover, F.1
  • 16
    • 0000666366 scopus 로고
    • Heuristic and optimal approaches to lot-sizing incorporating backorders: An empirical evaluation
    • Gupta, S. M. and Brennan, L., 1992. Heuristic and optimal approaches to lot-sizing incorporating backorders: an empirical evaluation. International Journal of Production Research, 30(12), 2813-2824.
    • (1992) International Journal of Production Research , vol.30 , Issue.12 , pp. 2813-2824
    • Gupta, S.M.1    Brennan, L.2
  • 19
    • 33750728882 scopus 로고    scopus 로고
    • Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches
    • DOI 10.1016/j.ejor.2005.12.008, PII S0377221705008416
    • Jans, R. and Degraeve, Z., 2007. Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches. European Journal of Operational Research, 177(3), 1855-1875. (Pubitemid 44709458)
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 1855-1875
    • Jans, R.1    Degraeve, Z.2
  • 20
    • 36448995797 scopus 로고    scopus 로고
    • Modeling industrial lot sizing problems: A review
    • DOI 10.1080/00207540600902262, PII 770289062
    • Jans, R. and Degraeve, Z., 2008. Modeling industrial lot sizing problems: a review. International Journal of Production Research, 46(6), 1619-1643. (Pubitemid 350161679)
    • (2008) International Journal of Production Research , vol.46 , Issue.6 , pp. 1619-1643
    • Jans, R.1    Degraeve, Z.2
  • 21
    • 0041511823 scopus 로고    scopus 로고
    • The capacitated lot sizing problem: A review of models and algorithms
    • DOI 10.1016/S0305-0483(03)00059-8, PII S0305048303000598
    • Karimi, B., Fatemi Ghomi, S. M. T., and Wilson, J. M., 2003. The capacitated lot sizing problem: a review of models and algorithms. The International Journal of Management Science, 31(5), 365-378. (Pubitemid 37007074)
    • (2003) Omega , vol.31 , Issue.5 , pp. 365-378
    • Karimi, B.1    Fatemi Ghomi, S.M.T.2    Wilson, J.M.3
  • 22
    • 34249945803 scopus 로고    scopus 로고
    • Determining semi-finished products to be stocked when changing the MTS-MTO policy: Case of a steel mill
    • DOI 10.1016/j.ijpe.2006.12.006, PII S0925527306003082, Principles and practices of managing inventories Selected papers of the thirteenth international symposium on inventories
    • Kerkkänen, A., 2007. Determining semi-finished products to be stocked when changing the MTS-MTO policy: case of a steel mill. International Journal of Production Economics, 108 (1-2), 111-118. (Pubitemid 46880223)
    • (2007) International Journal of Production Economics , vol.108 , Issue.1-2 , pp. 111-118
    • Kerkkanen, A.1
  • 23
    • 0001173632 scopus 로고
    • An automatic method for solving discrete programming problems
    • Land, A. H. and Doig, A. G., 1960. An automatic method for solving discrete programming problems. Econometrica, 28(3), 497-520.
    • (1960) Econometrica , vol.28 , Issue.3 , pp. 497-520
    • Land, A.H.1    Doig, A.G.2
  • 24
    • 0035269242 scopus 로고    scopus 로고
    • Integrating SQP and branch-and-bound for mixed integer nonlinear programming
    • DOI 10.1023/A:1011241421041
    • Leyffer, S., 2001. Integrating SQP and branch-and-bound for mixed integer nonlinear programming. Computational Optimization and Applications, 18(3), 295-309. (Pubitemid 32457216)
    • (2001) Computational Optimization and Applications , vol.18 , Issue.3 , pp. 295-309
    • Leyffer, S.1
  • 25
    • 0035878029 scopus 로고    scopus 로고
    • Integrated model for production planning in a large iron and steel manufacturing environment
    • DOI 10.1080/00207540110035200
    • Li, H. and Shang, J., 2001. Integrated model for production planning in a large iron and steel manufacturing environment. International Journal of Production Research, 39(9), 2037-2062. (Pubitemid 35165606)
    • (2001) International Journal of Production Research , vol.39 , Issue.9 , pp. 2037-2062
    • Li, H.1    Shang, J.2
  • 26
    • 28844475128 scopus 로고    scopus 로고
    • Uncapacitated production planning with multiple product types, returned product remanufacturing and demand substitution
    • Li, Y., Chen, J., and Cai, X., 2006. Uncapacitated production planning with multiple product types, returned product remanufacturing and demand substitution. OR Spectrum, 28(1), 98-122.
    • (2006) OR Spectrum. , vol.28 , Issue.1 , pp. 98-122
    • Li, Y.1    Chen, J.2    Cai, X.3
  • 27
    • 37849185060 scopus 로고    scopus 로고
    • Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing
    • DOI 10.1016/j.ijpe.2004.11.017, PII S092552730500232X, Scheduling in Batch-Processing Industries and Supply Shains
    • Li, Y., Chen, J., and Cai, X., 2007. Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing. International Journal of Production Economics, 105(2), 301-317. (Pubitemid 44827604)
    • (2007) International Journal of Production Economics , vol.105 , Issue.2 , pp. 301-317
    • Li, Y.1    Chen, J.2    Cai, X.3
  • 28
    • 0001372404 scopus 로고
    • Programming of economic lot sizes
    • Manne, A. S., 1958. Programming of economic lot sizes. Management Science, 4(2), 115-135.
    • (1958) Management Science , vol.4 , Issue.2 , pp. 115-135
    • Manne, A.S.1
  • 29
    • 0028378737 scopus 로고
    • Lagrangian heuristics for the capacitated multi-item lot sizing problem with backordering
    • Miller, H. M. and Yang, M., 1994. Lagrangian heuristics for the capacitated multi-item lot sizing problem with backordering. International Journal of Production Economics, 34(1), 1-15.
    • (1994) International Journal of Production Economics , vol.34 , Issue.1 , pp. 1-15
    • Miller, H.M.1    Yang, M.2
  • 30
    • 0034311096 scopus 로고    scopus 로고
    • The capacitated lot sizing problem with overtime decisions and setup times
    • Özdamar, L. and Bozyel, M., 2000. The capacitated lot sizing problem with overtime decisions and setup times. IIE Transactions, 32(11), 1043-1057.
    • (2000) IIE Transactions , vol.32 , Issue.11 , pp. 1043-1057
    • Özdamar, L.1    Bozyel, M.2
  • 32
    • 0035900872 scopus 로고    scopus 로고
    • The impact of product substitution on retail merchandising
    • DOI 10.1016/S0377-2217(01)00021-2, PII S0377221701000212
    • Rajam, K. and Tang, C. S., 2001. The impact of product substitution on retail merchandising. European Journal of Operational Research, 135(3), 582-601. (Pubitemid 32935205)
    • (2001) European Journal of Operational Research , vol.135 , Issue.3 , pp. 582-601
    • Rajaram, K.1    Tang, C.S.2
  • 33
    • 0026375970 scopus 로고
    • A multiple arc network model of production planning in a steel mill
    • Sasidhar, B. and Achary, K. K., 1991. A multiple arc network model of production planning in a steel mill. International Journal of Production Economics, 22(3), 195-202.
    • (1991) International Journal of Production Economics , vol.22 , Issue.3 , pp. 195-202
    • Sasidhar, B.1    Achary, K.K.2
  • 34
    • 0345892597 scopus 로고
    • Product mix optimization: A case study of integrated steel plants of SAIL
    • Sharma, A. and Sinha, K., 1991. Product mix optimization: a case study of integrated steel plants of SAIL. OPSEARCH, 28, 188-201.
    • (1991) OPSEARCH , vol.28 , pp. 188-201
    • Sharma, A.1    Sinha, K.2
  • 35
    • 34249831859 scopus 로고
    • A new reformulation-linearization technique for bilinear programming problems
    • Sherali, H. and Alameddine, A., 1992. A new reformulation-linearization technique for bilinear programming problems. Journal of Global Optimization, 2(4), 379-410.
    • (1992) Journal of Global Optimization , vol.2 , Issue.4 , pp. 379-410
    • Sherali, H.1    Alameddine, A.2
  • 36
    • 0035899628 scopus 로고    scopus 로고
    • A review of planning and scheduling systems and methods for integrated steel production
    • DOI 10.1016/S0377-2217(00)00240-X, PII S037722170000240X
    • Tang, L., et al., 2001. A review of planning and scheduling systems and methods for integrated steel production. European Journal of Operational Research, 133(1), 1-20. (Pubitemid 32518297)
    • (2001) European Journal of Operational Research , vol.133 , Issue.1 , pp. 1-20
    • Tang, L.1    Liu, J.2    Rong, A.3    Yang, Z.4
  • 38
    • 0001962762 scopus 로고
    • Dynamic version of the economic lot size model
    • Wagner, H. M. and Whitin, T. M., 1958. Dynamic version of the economic lot size model. Management Science, 5(1), 89-96.
    • (1958) Management Science , vol.5 , Issue.1 , pp. 89-96
    • Wagner, H.M.1    Whitin, T.M.2
  • 39
    • 0024876266 scopus 로고
    • A backorder version of the Wagner-Whitin discrete demand EOQ algorithm by dynamic programming
    • Webster, F. M., 1989. A backorder version of the Wagner-Whitin discrete demand EOQ algorithm by dynamic programming. Production and Inventory Management Journal, 30(4), 1-5.
    • (1989) Production and Inventory Management Journal , vol.30 , Issue.4 , pp. 1-5
    • Webster, F.M.1
  • 40
    • 9544243707 scopus 로고    scopus 로고
    • Model and analysis of integrated production-inventory system: The case of steel production
    • Zanoni, S. and Zavanella, L., 2005. Model and analysis of integrated production-inventory system: the case of steel production. International Journal of Production Economics, 93-94, 197-205.
    • (2005) International Journal of Production Economics , vol.93-94 , pp. 197-205
    • Zanoni, S.1    Zavanella, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.