메뉴 건너뛰기




Volumn 49, Issue 12, 2011, Pages 3565-3584

A novel metric for determining the constraining effect of resources in manufacturing via simulation

Author keywords

enterprise; machine; manufacturing; resource; skill; starvation

Indexed keywords

ENTERPRISE; MACHINE; MANUFACTURING; RESOURCE; SKILL; STARVATION;

EID: 79953819441     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2010.481643     Document Type: Article
Times cited : (4)

References (18)
  • 1
    • 70449686075 scopus 로고    scopus 로고
    • Workload simulation and optimisation in multi-criteria hybrid flowshop scheduling: A case study
    • Alfieri, A., 2009. Workload simulation and optimisation in multi-criteria hybrid flowshop scheduling: A case study. International Journal of Production Research, 47(18), 5129-5145.
    • (2009) International Journal of Production Research , vol.47 , Issue.18 , pp. 5129-5145
    • Alfieri, A.1
  • 2
    • 0000094485 scopus 로고
    • Worker absenteeism: An analysis using microdata
    • Barmby, T., Orme, C., and Treble, J., 1991. Worker absenteeism: An analysis using microdata. The Economic Journal, 101(405), 214-229.
    • (1991) The Economic Journal , vol.101 , Issue.405 , pp. 214-229
    • Barmby, T.1    Orme, C.2    Treble, J.3
  • 4
    • 79953828240 scopus 로고    scopus 로고
    • Worker lateness costs business £66 million every year
    • 20 December
    • Bytestart, 2009. Worker lateness costs business £66 million every year. Bytestart.co.uk - The Small Business Portal, 20 December.
    • (2009) The Small Business Portal
    • Bytestart1
  • 8
    • 79953811874 scopus 로고    scopus 로고
    • Absenteeism issues
    • 2 September
    • Irish Times, 2008. Absenteeism issues. IrishTimes.com, 2 September.
    • (2008) IrishTimes.com
    • Times, I.1
  • 10
    • 84987012876 scopus 로고
    • Shifting production bottlenecks: Causes, cures, and conundrums
    • Lawrence, S. and Buss, A., 1994. Shifting production bottlenecks: Causes, cures, and conundrums. Journal of Production and Operations Management, 3(1), 1059-1478.
    • (1994) Journal of Production and Operations Management , vol.3 , Issue.1 , pp. 1059-1478
    • Lawrence, S.1    Buss, A.2
  • 11
    • 74549147342 scopus 로고    scopus 로고
    • Bottleneck detection of complex manufacturing systems using a data-driven method
    • Li, L., 2009. Bottleneck detection of complex manufacturing systems using a data-driven method. International Journal of Production Research, 47(24), 6929-6940.
    • (2009) International Journal of Production Research , vol.47 , Issue.24 , pp. 6929-6940
    • Li, L.1
  • 12
    • 70449688157 scopus 로고    scopus 로고
    • Data driven bottleneck detection of manufacturing systems
    • Li, L., Chang, Q., and Ni, J., 2009a. Data driven bottleneck detection of manufacturing systems. International Journal of Production Research, 47(20), 5019-5036.
    • (2009) International Journal of Production Research , vol.47 , Issue.20 , pp. 5019-5036
    • Li, L.1    Chang, Q.2    Ni, J.3
  • 13
    • 70449578995 scopus 로고    scopus 로고
    • Real time production improvement through bottleneck control
    • Li, L., Chang, Q., and Ni, J., 2009b. Real time production improvement through bottleneck control. International Journal of Production Research, 47(21), 6145-6158.
    • (2009) International Journal of Production Research , vol.47 , Issue.21 , pp. 6145-6158
    • Li, L.1    Chang, Q.2    Ni, J.3
  • 14
    • 60749095769 scopus 로고    scopus 로고
    • Manufacturing process analysis with support of workflow modelling and simulation
    • Lin, H., Fan, Y., and Newman, S., 2009. Manufacturing process analysis with support of workflow modelling and simulation. International Journal of Production Research, 47(18), 5129-5145.
    • (2009) International Journal of Production Research , vol.47 , Issue.18 , pp. 5129-5145
    • Lin, H.1    Fan, Y.2    Newman, S.3
  • 15
    • 34548455092 scopus 로고    scopus 로고
    • Overall throughput effectiveness (OTE) metric for factory-level performance monitoring and bottleneck detection
    • DOI 10.1080/00207540600786731, PII 770289108
    • Muthiah, K. and Huang, S., 2007. Overall throughput effectiveness (OTE) metric for factory-level performance monitoring and bottleneck detection. International Journal of Production Research, 45(20), 4753-4769. (Pubitemid 47352791)
    • (2007) International Journal of Production Research , vol.45 , Issue.20 , pp. 4753-4769
    • Muthiah, K.M.N.1    Huang, S.H.2
  • 17
    • 0036929040 scopus 로고    scopus 로고
    • Shifting bottleneck detection
    • 8-11 December, San Diego, California
    • Roser, C., Nakano, M. and Tanaka, M., 2002. Shifting bottleneck detection. Winter simulation conference, 8-11 December, San Diego, California, Vol. 2, 1079-1086.
    • (2002) Winter Simulation Conference , vol.2 , pp. 1079-1086
    • Roser, C.1    Nakano, M.2    Tanaka, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.