1
-
-
0023977010
-
The shifting bottleneck procedure for job-shop scheduling
-
Adams, J., Balas, E., and Zawack, D. 1988. The Shifting Bottleneck Procedure for Job-Shop Scheduling. Management Science, 34(3), 391-401.
-
(1988)
Management Science
, vol.34
, Issue.3
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
3
-
-
0032048158
-
Bottlenecks in markovian production lines: A systems approach
-
Chiang, S.-Y., Kuo, C.-T., and Meerkov, S. M. 1998. Bottlenecks in Markovian Production Lines: A Systems Approach. IEEE Transactions on Robotics and Automation, 14(2), 352-359.
-
(1998)
IEEE Transactions on Robotics and Automation
, vol.14
, Issue.2
, pp. 352-359
-
-
Chiang, S.-Y.1
Kuo, C.-T.2
Meerkov, S.M.3
-
8
-
-
0033312998
-
Enterprise modeling and simulation platform integrated manufacturing system design and supply chain
-
ed., Tokyo, Japan
-
Kubota, F., Sato, S., and Nakano, M. 1999. Enterprise Modeling and Simulation Platform Integrated Manufacturing System Design and Supply Chain. In IEEE Conference on Systems, Man, and Cybernetics, ed., 511-515, Tokyo, Japan.
-
(1999)
IEEE Conference on Systems, Man, and Cybernetics
, pp. 511-515
-
-
Kubota, F.1
Sato, S.2
Nakano, M.3
-
9
-
-
0012354474
-
Bottlenecks in serial production lines: A system-theoretic approach
-
Kuo, C.-T., Lim, J.-T., and Meerkov, S. M. 1996. Bottlenecks in Serial Production Lines: A System-Theoretic Approach. Mathematical Problems in Engineering, 2, 233-276.
-
(1996)
Mathematical Problems in Engineering
, vol.2
, pp. 233-276
-
-
Kuo, C.-T.1
Lim, J.-T.2
Meerkov, S.M.3
-
11
-
-
84987012876
-
Shifting production bottlenecks: Causes, cures, and conundrums
-
Lawrence, S. R., and Buss, A. H. 1994. Shifting Production Bottlenecks: Causes, Cures, and Conundrums. Journal of Production and Operations Management, 3(1),21-37.
-
(1994)
Journal of Production and Operations Management
, vol.3
, Issue.1
, pp. 21-37
-
-
Lawrence, S.R.1
Buss, A.H.2
-
12
-
-
84968978806
-
Economic analysis of production bottlenecks
-
Lawrence, S. R., and Buss, A. H. 1995. Economic Analysis of Production Bottlenecks. Mathematical Problems in Engineering, 1(4), 341-369.
-
(1995)
Mathematical Problems in Engineering
, vol.1
, Issue.4
, pp. 341-369
-
-
Lawrence, S.R.1
Buss, A.H.2
-
13
-
-
0002087205
-
Toward the estimation of bottleneck shiftiness in a manufacturing operation
-
Moss, H. K., and Yu, W. B. 1999. Toward the Estimation of Bottleneck Shiftiness in a Manufacturing Operation. Production and Inventory Management Journal, 40(2), 53-58.
-
(1999)
Production and Inventory Management Journal
, vol.40
, Issue.2
, pp. 53-58
-
-
Moss, H.K.1
Yu, W.B.2
-
14
-
-
0001263754
-
ROPSII: Agent oriented manufacturing simulator on the basis of robot simulator
-
ed., Kobe, Japan
-
Nakano, M., Sugiura, N., Tanaka, M., and Kuno, T. 1994. ROPSII: Agent Oriented Manufacturing Simulator on the basis of Robot Simulator. In Japan-USA Symposium on Flexible Automation, ed., 201-208, Kobe, Japan.
-
(1994)
Japan-USA Symposium on Flexible Automation
, pp. 201-208
-
-
Nakano, M.1
Sugiura, N.2
Tanaka, M.3
Kuno, T.4
-
15
-
-
0035708230
-
A practical bottleneck detection method
-
ed. B. A. Peters, J. S. Smith, D. J. Medeiros, and M. W. Rohrer, Arlington, Virginia, USA: Institute of Electrical and Electronics Engineers
-
Roser, C., Nakano, M., and Tanaka, M. 2001, A Practical Bottleneck Detection Method. In Winter Simulation Conference, ed. B. A. Peters, J. S. Smith, D. J. Medeiros, and M. W. Rohrer, 949-953, Arlington, Virginia, USA: Institute of Electrical and Electronics Engineers.
-
(2001)
Winter Simulation Conference
, pp. 949-953
-
-
Roser, C.1
Nakano, M.2
Tanaka, M.3
-
16
-
-
0034655062
-
Performance of decomposition procedures for job shop scheduling problems with bottleneck machines
-
Uzsoy, R., and Wang, C.-S. 2000. Performance of decomposition procedures for job shop scheduling problems with bottleneck machines. International Journal of Production Research, 38(6), 1271-1286.
-
(2000)
International Journal of Production Research
, vol.38
, Issue.6
, pp. 1271-1286
-
-
Uzsoy, R.1
Wang, C.-S.2
|