메뉴 건너뛰기




Volumn 49, Issue 14, 2010, Pages 6482-6498

Mixed-integer linear programming monolithic formulations for lot-sizing and scheduling of single-stage batch facilities

Author keywords

[No Author keywords available]

Indexed keywords

CLUSTER-BASED METHODS; CONTINUOUS-TIME FORMULATION; CPU TIME; CUSTOMER ORDERS; DUE DATES; LOT SIZING; MIXED-INTEGER LINEAR PROGRAMMING; MONOLITHIC FORMULATION; MULTI-PRODUCTS; MULTIPLE ORDERS; OPTIMALITY; PRODUCT CHANGEOVERS; PRODUCT DEMAND; RIGOROUS MODEL; SINGLE STAGE; SYMMETRY BREAKING CONSTRAINTS; VARIABLE PROCESSING TIME;

EID: 79952462481     PISSN: 08885885     EISSN: 15205045     Source Type: Journal    
DOI: 10.1021/ie100054h     Document Type: Article
Times cited : (15)

References (25)
  • 1
    • 2442583184 scopus 로고    scopus 로고
    • Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review
    • Floudas, C. A.; Lin, X. Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review. Comput. Chem. Eng. 2004, 28, 2109.
    • (2004) Comput. Chem. Eng. , vol.28 , pp. 2109
    • Floudas, C.A.1    Lin, X.2
  • 2
    • 33748102266 scopus 로고    scopus 로고
    • State-of-the-art review of optimization methods for short-term scheduling of batch processes
    • DOI 10.1016/j.compchemeng.2006.02.008, PII S0098135406000287
    • Méndez, C. A.; Cerdá, J.; Grossmann, I. E.; Harjunkoski, I.; Fahl, M. State-of-the-art review of optimization methods for short-term scheduling of batch processes. Comput. Chem. Eng. 2006, 30, 913-946. (Pubitemid 44304455)
    • (2006) Computers and Chemical Engineering , vol.30 , Issue.6-7 , pp. 913-946
    • Mendez, C.A.1    Cerda, J.2    Grossmann, I.E.3    Harjunkoski, I.4    Fahl, M.5
  • 3
    • 0027545176 scopus 로고
    • General algorithm for short-term scheduling of batch operations - I. Milp formulation
    • DOI 10.1016/0098-1354(93)80015-F
    • Kondili, E.; Pantelides, C. C.; Sargent, R. W. H. A general algorithm for short-term scheduling of batch operations -I. MILP formulation. Comput. Chem. Eng. 1993, 17, 211-227. (Pubitemid 23633373)
    • (1993) Computers and Chemical Engineering , vol.17 , Issue.2 , pp. 211-227
    • Kondili, E.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 5
    • 0034307311 scopus 로고    scopus 로고
    • Short-term planning and scheduling in multipurpose batch chemical plants: A multilevel approach
    • Rodrigues, M. T. M.; Latre, L. G.; Rodrigues, L. C. A. Short-term planning and scheduling in multipurpose batch chemical plants: a multilevel approach. Comput. Chem. Eng. 2000, 24, 2247-2258.
    • (2000) Comput. Chem. Eng. , vol.24 , pp. 2247-2258
    • Rodrigues, M.T.M.1    Latre, L.G.2    Rodrigues, L.C.A.3
  • 6
    • 0036568989 scopus 로고    scopus 로고
    • A simple new continuous-time formulation for short-term scheduling of multipurpose batch processes
    • Giannelos, N. F.; Georgiadis, M. C. A simple new continuous-time formulation for short-term scheduling of multipurpose batch processes. Ind. Eng. Chem. Res. 2002, 41, 2178-2184. (Pubitemid 34438788)
    • (2002) Industrial and Engineering Chemistry Research , vol.41 , Issue.9 , pp. 2178-2184
    • Giannelos, N.F.1    Georgiadis, M.C.2
  • 7
    • 0037635200 scopus 로고    scopus 로고
    • New general continuous-time state - Task network formulation for short-term scheduling of multipurpose batch plants
    • Maravelias, C. T.; Grossmann, I. E. New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants. Ind. Eng. Chem. Res. 2003, 42, 3056-3074. (Pubitemid 36736684)
    • (2003) Industrial and Engineering Chemistry Research , vol.42 , Issue.13 , pp. 3056-3074
    • Maravelias, C.T.1    Grossmann, I.E.2
  • 9
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes
    • Ierapetritou, M. G.; Floudas, C. A. Effective continuous-time formulation for short-term scheduling: I. Multipurpose batch, processes. Ind. Eng. Chem. Res. 1998, 37, 4341-4359. (Pubitemid 29144956)
    • (1998) Industrial and Engineering Chemistry Research , vol.37 , Issue.11 , pp. 4341-4359
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 10
    • 0032877613 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 3. Multiple intermediate due dates
    • Ierapetritou, M. G.; Hené, T. S.; Floudas, C. A. Effective continuous-time formulation for short-term scheduling: 3. Multiple intermediate due dates. Ind. Eng. Chem. Res. 1999, 38, 3446-3461. (Pubitemid 29454767)
    • (1999) Industrial and Engineering Chemistry Research , vol.38 , Issue.9 , pp. 3446-3461
    • Ierapetritou, M.G.1    Hene, T.S.2    Floudas, C.A.3
  • 11
    • 2442436591 scopus 로고    scopus 로고
    • Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: Resource constraints and mixed storage policies
    • Janak, S. L.; Lin, X.; Floudas, C. A. Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies. Ind. Eng. Chem. Res. 2004, 43, 2516-2533. (Pubitemid 38619750)
    • (2004) Industrial and Engineering Chemistry Research , vol.43 , Issue.10 , pp. 2516-2533
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 12
    • 0001690679 scopus 로고
    • A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants
    • Pinto, J. M.; Grossmann, I. E. A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants. Ind. Eng. Chem. Res. 1995, 34, 3037-3051.
    • (1995) Ind. Eng. Chem. Res. , vol.34 , pp. 3037-3051
    • Pinto, J.M.1    Grossmann, I.E.2
  • 13
    • 29144514680 scopus 로고    scopus 로고
    • New continuous-time MILP model for the short-term scheduling of multistage batch plants
    • Castro, P. M.; Grossmann, I. E. New continuous-time MILP model for the short-term scheduling of multistage batch plants. Ind. Eng. Chem. Res. 2005, 44, 9175.
    • (2005) Ind. Eng. Chem. Res. , vol.44 , pp. 9175
    • Castro, P.M.1    Grossmann, I.E.2
  • 14
    • 0031140322 scopus 로고    scopus 로고
    • A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with, parallel lines
    • Cerdá, J.; Henning, G. P.; Grossmann, I. E. A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with, parallel lines. Ind. Eng. Chem. Res. 1997, 36 (5), 16951707.
    • (1997) Ind. Eng. Chem. Res. , vol.36 , Issue.5 , pp. 16951707
    • Cerdá, J.1    Henning, G.P.2    Grossmann, I.E.3
  • 15
    • 0037503184 scopus 로고    scopus 로고
    • An improved MILP formulation for scheduling multiproduct, multistage batch plants
    • Gupta, S.; Karimi, I. A. An improved MILP formulation for scheduling multiproduct, multistage batch plants. Ind. Eng. Chem. Res. 2003, 42, 2365-2380. (Pubitemid 36605260)
    • (2003) Industrial and Engineering Chemistry Research , vol.42 , Issue.11 , pp. 2365-2380
    • Gupta, S.1    Karimi, I.A.2
  • 16
    • 0035339828 scopus 로고    scopus 로고
    • An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities
    • DOI 10.1016/S0098-1354(01)00671-8, PII S0098135401006718
    • Méndez, C. A.; Henning, G. P.; Cerdá, J. An MILP continuoustime approach to short-term scheduling of resource-constrained multistage flowshop batch facilities. Comput. Chem. Eng. 2001, 25, 701-711. (Pubitemid 32373874)
    • (2001) Computers and Chemical Engineering , vol.25 , Issue.4-6 , pp. 701-711
    • Mendez, C.A.1    Henning, G.P.2    Cerda, J.3
  • 17
    • 0034307307 scopus 로고    scopus 로고
    • Optimal scheduling of batch plants satisfying multiple product orders with different due dates
    • Méndez, C. A.; Henning, G. P.; Cerdá, J. Optimal scheduling of batch plants satisfying multiple product orders with different due dates. Comput. Chem. Eng. 2000, 24, 2223-2245.
    • (2000) Comput. Chem. Eng. , vol.24 , pp. 2223-2245
    • Méndez, C.A.1    Henning, G.P.2    Cerdá, J.3
  • 18
    • 0037473561 scopus 로고    scopus 로고
    • A slot-based formulation for single-stage multiproduct batch plants with multiple orders per product
    • Lim, M.; Karimi, I. A. A slot-based formulation for single-stage multiproduct batch plants with multiple orders per product. Ind. Eng. Chem. Res. 2003, 42, 1914-1924.
    • (2003) Ind. Eng. Chem. Res. , vol.42 , pp. 1914-1924
    • Lim, M.1    Karimi, I.A.2
  • 19
    • 43049108857 scopus 로고    scopus 로고
    • A precedence-based monolithic approach to lot-sizing and scheduling of multiproduct batch plants
    • Méndez, C. A.; Cerdá, J. A precedence-based monolithic approach to lot-sizing and scheduling of multiproduct batch plants. Comput.-Aided Chem. Eng. 2007, 24, 679-684.
    • (2007) Comput.-Aided Chem. Eng. , vol.24 , pp. 679-684
    • Méndez, C.A.1    Cerdá, J.2
  • 20
    • 38149039321 scopus 로고    scopus 로고
    • Simultaneous batching and scheduling of single stage batch plants with parallel units
    • Castro, P. M.; Erdirik-Dogan, M.; Grossmann, I. E. Simultaneous batching and scheduling of single stage batch plants with parallel units. AIChE J. 2008, 54, 183-193.
    • (2008) AIChE J. , vol.54 , pp. 183-193
    • Castro, P.M.1    Erdirik-Dogan, M.2    Grossmann, I.E.3
  • 21
    • 41149128843 scopus 로고    scopus 로고
    • Batch selection, assignment and sequencing in multi-stage multi-product processes
    • Prasad, P.; Maravelias, C. T. Batch selection, assignment and sequencing in multi-stage multi-product processes. Comput. Chem. Eng. 2008, 32, 1106-1119.
    • (2008) Comput. Chem. Eng. , vol.32 , pp. 1106-1119
    • Prasad, P.1    Maravelias, C.T.2
  • 22
    • 41749109623 scopus 로고    scopus 로고
    • Simultaneous batching and scheduling in multistage multiproduct processes
    • DOI 10.1021/ie070944y
    • Sundaramoorthy, A.; Maravelias, C. T. Simultaneous batching and scheduling in multistage multiproduct processes. Ind. Eng. Chem. Res. 2008, 47, 1546-1555. (Pubitemid 351488426)
    • (2008) Industrial and Engineering Chemistry Research , vol.47 , Issue.5 , pp. 1546-1555
    • Sundaramoorthy, A.1    Maravelias, C.T.2
  • 23
    • 51849108013 scopus 로고    scopus 로고
    • Modeling of storage in batching and scheduling of multistage processes
    • Sundaramoorthy, A.; Maravelias, C. T. Modeling of storage in batching and scheduling of multistage processes. Ind. Eng. Chem. Res. 2008, 47, 6648-6660.
    • (2008) Ind. Eng. Chem. Res. , vol.47 , pp. 6648-6660
    • Sundaramoorthy, A.1    Maravelias, C.T.2
  • 24
    • 67650805901 scopus 로고    scopus 로고
    • Scheduling of multistage batch processes under utility constraints
    • Sundaramoorthy, A.; Maravelias, C. T.; Prasad, P. Scheduling of multistage batch processes under utility constraints. Ind. Eng. Chem. Res. 2009, 48, 6050-6058.
    • (2009) Ind. Eng. Chem. Res. , vol.48 , pp. 6050-6058
    • Sundaramoorthy, A.1    Maravelias, C.T.2    Prasad, P.3
  • 25
    • 61649097075 scopus 로고    scopus 로고
    • A continuous-time tightened formulation for single-stage batch scheduling with sequence dependent changeovers
    • Marchetti, P. A.; Cerdá, J. A continuous-time tightened formulation for single-stage batch scheduling with sequence dependent changeovers. Ind. Eng. Chem. Res. 2009, 48, 483-498.
    • (2009) Ind. Eng. Chem. Res. , vol.48 , pp. 483-498
    • Marchetti, P.A.1    Cerdá, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.