메뉴 건너뛰기




Volumn 38, Issue 7, 2011, Pages 8524-8537

A real-time warehouse operations planning system for small batch replenishment problems in production environment

Author keywords

Genetic algorithm (GA); Radio frequency identification (RFID) technology; Small batch replenishment problem

Indexed keywords

DAILY PRODUCTION; DELIVERY ROUTES; JUST IN TIME; MAKE TO ORDER; PRODUCTION ENVIRONMENTS; PRODUCTION FLOOR; PRODUCTION LINE; RADIO FREQUENCY IDENTIFICATION (RFID) TECHNOLOGY; RADIO FREQUENCY IDENTIFICATION TECHNOLOGY; REAL-TIME PRODUCTION; SHORT PERIODS; SIMULATION TESTS; SMALL BATCH REPLENISHMENT PROBLEM; WAREHOUSE OPERATION;

EID: 79952452588     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2011.01.053     Document Type: Article
Times cited : (38)

References (37)
  • 1
    • 34248370927 scopus 로고    scopus 로고
    • Production planning and warehouse management in supply networks with inter-facility mold transfers
    • E.H. Aghezzaf Production planning and warehouse management in supply networks with inter-facility mold transfers European Journal of Operational Research 182 2007 1122 1139
    • (2007) European Journal of Operational Research , vol.182 , pp. 1122-1139
    • Aghezzaf, E.H.1
  • 2
    • 52049118549 scopus 로고    scopus 로고
    • The joint replenishment and delivery scheduling of the one-warehouse, n-retailer system
    • B.C. Cha, I.K. Moon, and J.H. Park The joint replenishment and delivery scheduling of the one-warehouse, n-retailer system Transportation Research Part E 44 2008 720 730
    • (2008) Transportation Research Part e , vol.44 , pp. 720-730
    • Cha, B.C.1    Moon, I.K.2    Park, J.H.3
  • 3
    • 60249089721 scopus 로고    scopus 로고
    • Development of an agent-based system for manufacturing control and coordination with ontology and RFID technology
    • R.S. Chen, and M. Tu Development of an agent-based system for manufacturing control and coordination with ontology and RFID technology Expert Systems with Applications 36 2009 7581 7593
    • (2009) Expert Systems with Applications , vol.36 , pp. 7581-7593
    • Chen, R.S.1    Tu, M.2
  • 4
    • 33144466718 scopus 로고    scopus 로고
    • Design of a RFID case-based resource management system for warehouse operations
    • DOI 10.1016/j.eswa.2005.07.023, PII S0957417405001454
    • H.K.H. Chow, K.L. Choy, W.B. Lee, and K.C. Lau Design of a RFID case-based resource management system for warehouse operations Expert Systems with Applications 30 2006 561 576 (Pubitemid 43267417)
    • (2006) Expert Systems with Applications , vol.30 , Issue.4 , pp. 561-576
    • Chow, H.K.H.1    Choy, K.L.2    Lee, W.B.3    Lau, K.C.4
  • 7
    • 33748756034 scopus 로고    scopus 로고
    • Production-inventory scheduling using Ant System metaheuristic
    • DOI 10.1016/j.ijpe.2005.01.008, PII S0925527305000460
    • I. Ferretti, S. Zanoni, and L. Zavanella Production-inventory scheduling using ant system metaheuristic International Journal of Production Economics 104 2006 317 326 (Pubitemid 44403068)
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 317-326
    • Ferretti, I.1    Zanoni, S.2    Zavanella, L.3
  • 8
    • 33750493263 scopus 로고    scopus 로고
    • Research on warehouse operation: A comprehensive review
    • DOI 10.1016/j.ejor.2006.02.025, PII S0377221706001056
    • J. Gu, M. Goetschalckx, and L.F. McGinnis Research on warehouse operation: A comprehensive review European Journal of Operational Research 177 2007 1 21 (Pubitemid 44647631)
    • (2007) European Journal of Operational Research , vol.177 , Issue.1 , pp. 1-21
    • Gu, J.1    Goetschalckx, M.2    McGinnis, L.F.3
  • 10
    • 33747786647 scopus 로고    scopus 로고
    • Mathematical model and genetic optimization for the job shop scheduling problem in a mixed- and multi-product assembly environment: A case study based on the apparel industry
    • DOI 10.1016/j.cie.2006.03.003, PII S0360835206000271
    • Z.X. Guo, S.Y.S. Leung, J.T. Fan, and S.F. Chan Mathematical model and genetic optimization for the job shop scheduling problem in a mixed- and multi-product assembly environment: A case study based on the apparel industry Computers and Industrial Engineering 50 2006 202 219 (Pubitemid 44278423)
    • (2006) Computers and Industrial Engineering , vol.50 , Issue.3 , pp. 202-219
    • Guo, Z.X.1    Wong, W.K.2    Leung, S.Y.S.3    Fan, J.T.4    Chan, S.F.5
  • 12
    • 44849090598 scopus 로고    scopus 로고
    • A genetic algorithm for joint replenishment based on exact inventory cost
    • S.P. Hong, and Y.H. Kim A genetic algorithm for joint replenishment based on exact inventory cost Computers and Operations Research 36 2009 167 175
    • (2009) Computers and Operations Research , vol.36 , pp. 167-175
    • Hong, S.P.1    Kim, Y.H.2
  • 13
    • 0346148283 scopus 로고    scopus 로고
    • A deterministic model for planning production quantities in a multi-plant, multi-warehouse environment with extensible capacities
    • J.K. Jolayemi, and F.O. Olorunniwo A deterministic model for planning production quantities in a multi-plant, multi-warehouse environment with extensible capacities International Journal of Production Economics 87 2004 99 113
    • (2004) International Journal of Production Economics , vol.87 , pp. 99-113
    • Jolayemi, J.K.1    Olorunniwo, F.O.2
  • 14
    • 38749119353 scopus 로고    scopus 로고
    • Optimization tool for short-term production planning and scheduling
    • DOI 10.1016/j.ijpe.2006.08.026, PII S0925527307001302
    • J. Józefowska, and A. Zimniak Optimization tool for short-term production planning and scheduling International Journal of Production Economics 112 2008 109 120 (Pubitemid 351179595)
    • (2008) International Journal of Production Economics , vol.112 , Issue.1 , pp. 109-120
    • Jozefowska, J.1    Zimniak, A.2
  • 15
    • 33747088804 scopus 로고    scopus 로고
    • Simulation-based sequencing and lot size optimisation for a production-and-inventory system with multiple items
    • DOI 10.1016/j.ijpe.2006.02.008, PII S0925527306000661, Strategic Issues and Innovation in Production Economics
    • M. Kämpf, and P. Köchel Simulation-based sequencing and lot size optimization for a production-and-inventory system with multiple items International Journal of Production Economics 104 2006 191 200 (Pubitemid 44224006)
    • (2006) International Journal of Production Economics , vol.104 , Issue.1 , pp. 191-200
    • Kampf, M.1    Kochel, P.2
  • 16
    • 35348948363 scopus 로고    scopus 로고
    • A review of the joint replenishment problem literature: 1989-2005
    • DOI 10.1016/j.ejor.2007.03.007, PII S0377221707003037
    • M. Khouja, and S. Goyal A review of the joint replenishment problem literature: 1989-2005 European Journal of Operational Research 186 2008 1 16 (Pubitemid 47600543)
    • (2008) European Journal of Operational Research , vol.186 , Issue.1 , pp. 1-16
    • Khouja, M.1    Goyal, S.2
  • 17
    • 56349121066 scopus 로고    scopus 로고
    • A genetic algorithm based knowledge discovery system for the design of fluid dispensing process for electronic packaging
    • C.K. Kwong, K.Y. Chan, and Y.C. Tsim A genetic algorithm based knowledge discovery system for the design of fluid dispensing process for electronic packaging Expert Systems with Applications 36 2009 3829 3838
    • (2009) Expert Systems with Applications , vol.36 , pp. 3829-3838
    • Kwong, C.K.1    Chan, K.Y.2    Tsim, Y.C.3
  • 18
    • 33847741124 scopus 로고    scopus 로고
    • The history of RFID
    • DOI 10.1109/MP.2005.1549751
    • J. Landt The history of RFID IEEE Potentials 24 2005 8 11 (Pubitemid 46504862)
    • (2005) IEEE Potentials , vol.24 , Issue.4 , pp. 8-11
    • Landt, J.1
  • 20
    • 55149105926 scopus 로고    scopus 로고
    • A two-warehouse production model for deteriorating inventory items with time-dependent demand
    • C.C. Lee, and S.L. Hsu A two-warehouse production model for deteriorating inventory items with time-dependent demand European Journal of Operational Research 194 2009 700 710
    • (2009) European Journal of Operational Research , vol.194 , pp. 700-710
    • Lee, C.C.1    Hsu, S.L.2
  • 21
    • 60849123126 scopus 로고    scopus 로고
    • Development of RFID-based reverse logistics system
    • C.K.M. Lee, and T.M. Chan Development of RFID-based reverse logistics system Expert Systems with Applications 36 2009 9299 9307
    • (2009) Expert Systems with Applications , vol.36 , pp. 9299-9307
    • Lee, C.K.M.1    Chan, T.M.2
  • 22
    • 33745599590 scopus 로고    scopus 로고
    • Radio frequency identification technology: Applications, technical challenges and strategies
    • DOI 10.1108/02602280610675474
    • S. Li, J.K. Visich, B.M. Khumawala, and C. Zhang Radio frequency identification technology: Applications, technical challenges and strategies Sensor Review 26 2006 193 202 (Pubitemid 43992737)
    • (2006) Sensor Review , vol.26 , Issue.3 , pp. 193-202
    • Li, S.1    Visich, J.K.2    Khumawala, B.M.3    Zhang, C.4
  • 24
    • 44849140428 scopus 로고    scopus 로고
    • A random key based genetic algorithm for the resource constrained project scheduling problem
    • J.J.M. Mendes, J.F. Gonalves, and M.G.C. Resende A random key based genetic algorithm for the resource constrained project scheduling problem Computers and Operations Research 36 2009 92 109
    • (2009) Computers and Operations Research , vol.36 , pp. 92-109
    • Mendes, J.J.M.1    Gonalves, J.F.2    Resende, M.G.C.3
  • 25
    • 56349107580 scopus 로고    scopus 로고
    • The assessment of the information quality with the aid of multiple criteria analysis
    • J. Michnik, and M.C. Lo The assessment of the information quality with the aid of multiple criteria analysis European Journal of Operational Research 195 2009 850 856
    • (2009) European Journal of Operational Research , vol.195 , pp. 850-856
    • Michnik, J.1    Lo, M.C.2
  • 26
    • 51249122851 scopus 로고    scopus 로고
    • Revenue management approach to stochastic capacity allocation problem
    • M. Modarres, and M. Sharifyazdi Revenue management approach to stochastic capacity allocation problem European Journal of Operational Research 192 2009 442 459
    • (2009) European Journal of Operational Research , vol.192 , pp. 442-459
    • Modarres, M.1    Sharifyazdi, M.2
  • 27
    • 19344378708 scopus 로고    scopus 로고
    • Hybrid branch and bound method with genetic algorithm for flexible flowshop scheduling problem
    • DOI 10.1299/jsmec.48.46, Advanced Production Scheduling
    • H. Morita, and N. Shio Hybrid branch and bound method with genetic algorithm for flexible flowshop scheduling problem JSME International Journal Series C - Mechanical Systems Machine Elements and Manufacturing 48 2005 46 52 (Pubitemid 40721801)
    • (2005) JSME International Journal, Series C: Mechanical Systems, Machine Elements and Manufacturing , vol.48 , Issue.1 , pp. 46-52
    • Morita, H.1    Shio, N.2
  • 28
    • 60249102918 scopus 로고    scopus 로고
    • A RFID case-based logistics resource management system for managing order-picking operations in warehouse
    • T.C. Poon, K.L. Choy, and H.C.W. Lau A RFID case-based logistics resource management system for managing order-picking operations in warehouse Expert Systems with Applications 36 2009 8277 8301
    • (2009) Expert Systems with Applications , vol.36 , pp. 8277-8301
    • Poon, T.C.1    Choy, K.L.2    Lau, H.C.W.3
  • 29
    • 62149120167 scopus 로고    scopus 로고
    • Assessing the impact of inventory inaccuracies within a newsvendor framework
    • E. Sahin, and Y. Dallery Assessing the impact of inventory inaccuracies within a newsvendor framework European Journal of Operational Research 197 2009 1108 1118
    • (2009) European Journal of Operational Research , vol.197 , pp. 1108-1118
    • Sahin, E.1    Dallery, Y.2
  • 31
    • 34548452458 scopus 로고    scopus 로고
    • A resource portfolio planning model using sampling-based stochastic programming and genetic algorithm
    • K.J. Wang, S.M. Wang, and J.C. Chen A resource portfolio planning model using sampling-based stochastic programming and genetic algorithm European Journal of Operational Research 184 2008 327 340
    • (2008) European Journal of Operational Research , vol.184 , pp. 327-340
    • Wang, K.J.1    Wang, S.M.2    Chen, J.C.3
  • 32
    • 55149111576 scopus 로고    scopus 로고
    • Production scheduling with supply and delivery considerations to minimize the makespan
    • X. Wang, and T.C.E. Cheng Production scheduling with supply and delivery considerations to minimize the makespan European Journal of Operational Research 194 2009 743 752
    • (2009) European Journal of Operational Research , vol.194 , pp. 743-752
    • Wang, X.1    Cheng, T.C.E.2
  • 34
    • 0037121477 scopus 로고    scopus 로고
    • A single-vendor and multiple-buyers production - Inventory policy for a deteriorating item
    • P.C. Yang, and H.M. Wee A single-vendor and multiple-buyers production - Inventory policy for a deteriorating item European Journal of Operational Research 143 2002 570 581
    • (2002) European Journal of Operational Research , vol.143 , pp. 570-581
    • Yang, P.C.1    Wee, H.M.2
  • 35
    • 34748854913 scopus 로고    scopus 로고
    • A genetic algorithm for determining optimal replenishment cycles to minimize maximum warehouse space requirements
    • M.J. Yao, and W.M. Chu A genetic algorithm for determining optimal replenishment cycles to minimize maximum warehouse space requirements Omega 36 2008 619 631
    • (2008) Omega , vol.36 , pp. 619-631
    • Yao, M.J.1    Chu, W.M.2
  • 36
    • 9544243707 scopus 로고    scopus 로고
    • Model and analysis of integrated production-inventory system: The case of steel production
    • S. Zanoni, and L. Zavanella Model and analysis of integrated production-inventory system: The case of steel production International Journal of Production Economics 93-94 2005 197 205
    • (2005) International Journal of Production Economics , vol.9394 , pp. 197-205
    • Zanoni, S.1    Zavanella, L.2
  • 37


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.