메뉴 건너뛰기




Volumn 104, Issue 2, 2006, Pages 317-326

Production-inventory scheduling using Ant System metaheuristic

Author keywords

Ant System; Continuous casting; Metaheuristics; Scheduling

Indexed keywords

ALGORITHMS; BILLETS (METAL BARS); COMPUTER SIMULATION; CONTINUOUS CASTING; INVENTORY CONTROL; IRON AND STEEL PLANTS; OPTIMIZATION; SCHEDULING;

EID: 33748756034     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2005.01.008     Document Type: Article
Times cited : (29)

References (26)
  • 2
    • 33748751228 scopus 로고    scopus 로고
    • Bullnheimer, B., Hartl, R.F., Strauss, C., 1997. A new rank based version of the Ant System-a computetional study. Proceedings of the Second International Conference on Metaheuristics, Sophia-Antipolis, France.
  • 3
    • 33748754482 scopus 로고    scopus 로고
    • Colorni, A., Dorigo, M., Maniezzo, V., 1991. Distributed optimization by ant colonies. Proceedings of the European Conference of Artificial Life, pp. 134-142.
  • 5
    • 84947905083 scopus 로고    scopus 로고
    • Den Besten, M., Stützle, T., Dorigo, M., 2000. Ant Colony Optimization for the total weighted tardiness problem. Proceedings of the Sixth International Conference Lecture Notes on Computer Science, vol. 191, pp. 611-620.
  • 6
    • 0031122887 scopus 로고    scopus 로고
    • Ant Colony System: A cooperative learning approach to the traveling salesman problem
    • Dorigo M., and Gambarella L.M. Ant Colony System: A cooperative learning approach to the traveling salesman problem. IEEE Transactions on Evolutionary Computation (1997) 53-66
    • (1997) IEEE Transactions on Evolutionary Computation , pp. 53-66
    • Dorigo, M.1    Gambarella, L.M.2
  • 9
    • 0036682205 scopus 로고    scopus 로고
    • Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence dependent setup time
    • Gagné C., Price W.L., and Gravel M. Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence dependent setup time. Journal of the Operations Research Society 53 (2002) 895-906
    • (2002) Journal of the Operations Research Society , vol.53 , pp. 895-906
    • Gagné, C.1    Price, W.L.2    Gravel, M.3
  • 11
    • 0037121184 scopus 로고    scopus 로고
    • Scheduling continuous casting of aluminium using a multiple objective ant colony optimization metaheuristic
    • Gravel M., Price W.L., and Gagné C. Scheduling continuous casting of aluminium using a multiple objective ant colony optimization metaheuristic. European Journal of Operational Research 143 (2002) 218-229
    • (2002) European Journal of Operational Research , vol.143 , pp. 218-229
    • Gravel, M.1    Price, W.L.2    Gagné, C.3
  • 12
    • 0028448723 scopus 로고    scopus 로고
    • Huang, S.H., Zhang, H.C., 1994. Artificial neural networks in manufacturing: Concepts, applications and perspectives. IEEE Transactions on Components, Packaging and Manufacturing Technology, Part A 212-228.
  • 13
    • 0001180180 scopus 로고
    • A heuristic approach to solving travelling salesman problem
    • Karg R., and Thompson G.L. A heuristic approach to solving travelling salesman problem. Management Science 10 (1964) 225-248
    • (1964) Management Science , vol.10 , pp. 225-248
    • Karg, R.1    Thompson, G.L.2
  • 14
    • 0000482108 scopus 로고    scopus 로고
    • Scheduling jobs on parallel machines with sequence dependent setup time
    • Lee H.L., and Pinedo M. Scheduling jobs on parallel machines with sequence dependent setup time. European Journal of Operational Research 100 (1997) 464-474
    • (1997) European Journal of Operational Research , vol.100 , pp. 464-474
    • Lee, H.L.1    Pinedo, M.2
  • 15
    • 0027146758 scopus 로고
    • Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling
    • MacCarthy B.L., and Liu J. Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling. International Journal of Production Research 31 (1993) 59-79
    • (1993) International Journal of Production Research , vol.31 , pp. 59-79
    • MacCarthy, B.L.1    Liu, J.2
  • 17
    • 0028368126 scopus 로고
    • Scheduling in a sequence dependent setup environment with genetic search
    • Rubin P.A., and Ragatz G.L. Scheduling in a sequence dependent setup environment with genetic search. Computers and Operations Research 22 (1995) 85-99
    • (1995) Computers and Operations Research , vol.22 , pp. 85-99
    • Rubin, P.A.1    Ragatz, G.L.2
  • 19
    • 33748755218 scopus 로고    scopus 로고
    • Stützle, T., 1998. An ant approach to the flow shop problem. Proceedings of the Sixth European Congress on Intelligent Techniques and Soft Computing, vol. 3, pp. 1560-1564.
  • 20
    • 0003386121 scopus 로고    scopus 로고
    • The Max-min Ant System and local search for the traveling salesman problem
    • Voss S., Martello S., Osman I.H., and Runcairol C. (Eds), Kluwer, Boston
    • Stützle T., and Hoos H. The Max-min Ant System and local search for the traveling salesman problem. In: Voss S., Martello S., Osman I.H., and Runcairol C. (Eds). Meta-Heuristic: Advances and Trends in Local Search Paradigms for Optimization (1998), Kluwer, Boston 137-154
    • (1998) Meta-Heuristic: Advances and Trends in Local Search Paradigms for Optimization , pp. 137-154
    • Stützle, T.1    Hoos, H.2
  • 21
    • 0033741404 scopus 로고    scopus 로고
    • A multiple travelling salesman problem model for hot rolling scheduling in Schangai Baoshan Iron and Steel Complex
    • Tang L., Liu J., Rong A., and Yang Z. A multiple travelling salesman problem model for hot rolling scheduling in Schangai Baoshan Iron and Steel Complex. European Journal of Operational Research 124 (2000) 267-282
    • (2000) European Journal of Operational Research , vol.124 , pp. 267-282
    • Tang, L.1    Liu, J.2    Rong, A.3    Yang, Z.4
  • 22
    • 0035899628 scopus 로고    scopus 로고
    • A review of planning and scheduling systems and methods for integrated steel production
    • Tang L., Liu J., Rong A., and Yang Z. A review of planning and scheduling systems and methods for integrated steel production. European Journal of Operational Research 133 (2001) 1-20
    • (2001) European Journal of Operational Research , vol.133 , pp. 1-20
    • Tang, L.1    Liu, J.2    Rong, A.3    Yang, Z.4
  • 23
    • 0037053021 scopus 로고    scopus 로고
    • Modelling and a genetic algorithm solution for the slab stack shuffling problem when implementing steel rolling schedules
    • Tang L., Liu J., Rong A., and Yang Z. Modelling and a genetic algorithm solution for the slab stack shuffling problem when implementing steel rolling schedules. International Journal of Production Research 40 (2002) 1583-1595
    • (2002) International Journal of Production Research , vol.40 , pp. 1583-1595
    • Tang, L.1    Liu, J.2    Rong, A.3    Yang, Z.4
  • 24
    • 0040789449 scopus 로고
    • A linear programming model of integrated iron and steel production
    • Tibor F. A linear programming model of integrated iron and steel production. Management Science 4 (1958) 415-449
    • (1958) Management Science , vol.4 , pp. 415-449
    • Tibor, F.1
  • 25
    • 0142258724 scopus 로고    scopus 로고
    • An Ant colony system approach for scheduling problems
    • Ying K.C., and Liao C.J. An Ant colony system approach for scheduling problems. Production Planning and Control 14 (2003) 69-75
    • (2003) Production Planning and Control , vol.14 , pp. 69-75
    • Ying, K.C.1    Liao, C.J.2
  • 26
    • 9544243707 scopus 로고    scopus 로고
    • Model and analysis of integrated production-inventory system: The case of steel production
    • Zanoni S., and Zavanella L. Model and analysis of integrated production-inventory system: The case of steel production. International Journal of Production Economics 93/94 (2005) 197-205
    • (2005) International Journal of Production Economics , vol.93-94 , pp. 197-205
    • Zanoni, S.1    Zavanella, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.