메뉴 건너뛰기




Volumn 137, Issue 3, 2011, Pages 225-237

Empirical analysis of the determinants of organizational flexibility in the construction business

Author keywords

Business strategies; Construction firms; Flexibility; Operational flexibility; Supply chain; Tactical flexibility and strategic flexibility

Indexed keywords

BUSINESS STRATEGY; CONSTRUCTION FIRMS; FLEXIBILITY; OPERATIONAL FLEXIBILITY; TACTICAL FLEXIBILITY;

EID: 79952309193     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000272     Document Type: Article
Times cited : (63)

References (64)
  • 1
    • 0002853166 scopus 로고
    • The need for strategic flexibility
    • Aaker, D. A., and Mascarenhas, B. (1984). The need for strategic flexibility.. J. Bus. Strategy, 5 (2), 74-82.
    • (1984) J. Bus. Strategy , vol.5 , Issue.2 , pp. 74-82
    • Aaker, D.A.1    Mascarenhas, B.2
  • 2
    • 41649112685 scopus 로고
    • Structural equation modeling in practice: A review and recommended two-step approach
    • 0033-2909 10.1037/0033-2909.103.3.411
    • Anderson, J. C., and Gerbing, D. W. (1988). Structural equation modeling in practice: A review and recommended two-step approach.. Psychol. Bull., 103 (3), 411-423. 0033-2909 10.1037/0033-2909.103.3.411
    • (1988) Psychol. Bull. , vol.103 , Issue.3 , pp. 411-423
    • Anderson, J.C.1    Gerbing, D.W.2
  • 4
    • 0037577154 scopus 로고    scopus 로고
    • Valuing Tactical and Strategic Flexibility
    • Buckley, A. (1997). Valuing tactical and strategic flexibility.. J. Gen. Manage., 22 (3), 74-91. (Pubitemid 127049204)
    • (1997) Journal of general management , vol.22 , Issue.3 , pp. 74-91
    • Buckley, A.1
  • 5
    • 0042023811 scopus 로고
    • Flexibility and the theory of the firm
    • Carlsson, B. (1989). Flexibility and the theory of the firm.. Int. J. Ind. Organ., 7 (2), 179-203.
    • (1989) Int. J. Ind. Organ. , vol.7 , Issue.2 , pp. 179-203
    • Carlsson, B.1
  • 7
    • 33744870364 scopus 로고
    • Organizational structure, environment and performance: The role of strategic choice
    • Child, J. (1972). Organizational structure, environment and performance: The role of strategic choice.. Sociology, 6 (1), 1-22.
    • (1972) Sociology , vol.6 , Issue.1 , pp. 1-22
    • Child, J.1
  • 8
    • 0003095695 scopus 로고    scopus 로고
    • The partial least squares approach to structural equation modeling
    • G. A. Marcoulides, ed., Lawrence Erlbaum Associates, Mahwah, NJ.
    • Chin, W. W. (1998). The partial least squares approach to structural equation modeling.. Modern methods for business research, G. A. Marcoulides, ed., Lawrence Erlbaum Associates, Mahwah, NJ, 295-335.
    • (1998) Modern Methods for Business Research , pp. 295-335
    • Chin, W.W.1
  • 10
    • 3543107106 scopus 로고
    • The flexibility of technological and human resources in automotive manufacturing
    • 0957-6061 10.1108/09576069410050323
    • Correa, H. L. (1994). The flexibility of technological and human resources in automotive manufacturing.. Integr. Manuf. Syst., 5 (1), 33-40. 0957-6061 10.1108/09576069410050323
    • (1994) Integr. Manuf. Syst. , vol.5 , Issue.1 , pp. 33-40
    • Correa, H.L.1
  • 11
    • 0031232360 scopus 로고    scopus 로고
    • Fit for purpose' contractual relations: Determining a theoretical framework for construction projects
    • PII S0969701297000051
    • Cox, A., and Thompson, I. (1997). Fit for purpose' contractual relations: Determining a theoretical framework for construction projects.. Eur. J. Purch. Supply Manage., 3 (3), 127-135. (Pubitemid 127166710)
    • (1997) European Journal of Purchasing and Supply Management , vol.3 , Issue.3 , pp. 127-135
    • Cox, A.1    Thompson, I.2
  • 13
    • 0001788160 scopus 로고
    • Some comments on maximum likelihood and partial least squares methods
    • Dijkstra, T. (1983). Some comments on maximum likelihood and partial least squares methods.. J. Econometrics, 22 (1-2), 67-90.
    • (1983) J. Econometrics , vol.22 , Issue.12 , pp. 67-90
    • Dijkstra, T.1
  • 14
    • 12744265206 scopus 로고    scopus 로고
    • Prediction of organizational effectiveness in construction companies
    • DOI 10.1061/(ASCE)0733-9364(2005)131:2(252)
    • Dikmen, I., Birgonul, M. T., and Kiziltas, S. (2005). Prediction of organizational effectiveness in construction companies.. J. Constr. Eng. Manage., 131 (2), 252-261. 0733-9364 10.1061/(ASCE)0733-9364(2005)131:2(252) (Pubitemid 40155185)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.2 , pp. 252-261
    • Dikmen, I.1    Birgonul, M.T.2    Kiziltas, S.3
  • 16
    • 84923818429 scopus 로고
    • Better bootstrap confidence intervals
    • 0162-145910.2307/2289144
    • Efron, B. (1987). Better bootstrap confidence intervals.. J. Am. Stat. Assoc. 0162-1459, 82 (397), 171-185. 10.2307/2289144
    • (1987) J. Am. Stat. Assoc. , vol.82 , Issue.397 , pp. 171-185
    • Efron, B.1
  • 17
    • 84980248442 scopus 로고
    • Strategic flexibility for high technology manoeuvres: A conceptual framework
    • Evans, J. S. (1991). Strategic flexibility for high technology manoeuvres: A conceptual framework.. J. Manage. Stud., 28 (1), 69-89.
    • (1991) J. Manage. Stud. , vol.28 , Issue.1 , pp. 69-89
    • Evans, J.S.1
  • 19
    • 0000356178 scopus 로고
    • Two structural equation models: LISREL and PLS applied to consumer exit-voice theory
    • Fornell, C., and Bookstein, F. L. (1982). Two structural equation models: LISREL and PLS applied to consumer exit-voice theory.. J. Mark. Res., 19 (4), 440-452.
    • (1982) J. Mark. Res. , vol.19 , Issue.4 , pp. 440-452
    • Fornell, C.1    Bookstein, F.L.2
  • 20
    • 0000009769 scopus 로고
    • Evaluating structural equation models with unobserved variables and measurement error
    • Fornell, C., and Larcker, D. F. (1981). Evaluating structural equation models with unobserved variables and measurement error.. J. Mark. Res., 18 (1), 39-50.
    • (1981) J. Mark. Res. , vol.18 , Issue.1 , pp. 39-50
    • Fornell, C.1    Larcker, D.F.2
  • 21
    • 21844451860 scopus 로고    scopus 로고
    • Infusing flexibility into business-to-business firms: A contingency theory and resource-based view perspective and practical implications
    • DOI 10.1016/j.indmarman.2004.09.022, PII S0019850105000210
    • Fredericks, E. (2005). Infusing flexibility into business-to-business firms: A contingency theory and resource-based view perspective and practical implications.. Ind. Mark. Manage., 34 (6), 555-565. (Pubitemid 40960106)
    • (2005) Industrial Marketing Management , vol.34 , Issue.6 SPEC. ISS. , pp. 555-565
    • Fredericks, E.1
  • 23
    • 0027580682 scopus 로고
    • Manufacturing flexibility: A strategic perspective
    • 0025-1909 10.1287/mnsc.39.4.395
    • Gerwin, D. (1993). Manufacturing flexibility: A strategic perspective.. Manage. Sci., 39 (4), 395-410. 0025-1909 10.1287/mnsc.39.4.395
    • (1993) Manage. Sci. , vol.39 , Issue.4 , pp. 395-410
    • Gerwin, D.1
  • 24
    • 15944418637 scopus 로고    scopus 로고
    • Embodying product and process flexibility to cope with challenging project deliveries
    • DOI 10.1061/(ASCE)0733-9364(2005)131:4(439)
    • Gil, N., Tommelein, I. D., Stout, A., and Garrett, T. (2005). Embodying product and process flexibility to cope with challenging project deliveries.. J. Constr. Eng. Manage., 131 (4), 439-448. 0733-9364 10.1061/(ASCE)0733-9364(2005) 131:4(439) (Pubitemid 40430140)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.4 , pp. 439-448
    • Gill, N.1    Tommelein, I.D.2    Stout, A.3    Garrett, T.4
  • 25
    • 79952301976 scopus 로고    scopus 로고
    • Construction markets in a changing world economy
    • L. Ruddock, ed., Taylor and Francis, New York.
    • Gruneberg, S. L. (2009). Construction markets in a changing world economy.. Economics for the modern built environment, L. Ruddock, ed., Taylor and Francis, New York, 153-167.
    • (2009) Economics for the Modern Built Environment , pp. 153-167
    • Gruneberg, S.L.1
  • 27
    • 0038123954 scopus 로고    scopus 로고
    • Predicting the level of organizational effectiveness: A methodology for the construction firm
    • Handa, V., and Adas, A. (1996). Predicting the level of organizational effectiveness: A methodology for the construction firm.. Constr. Manage. Econ., 14 (4), 341-352. 0144-6193 10.1080/014461996373412 (Pubitemid 126662994)
    • (1996) Construction Management and Economics , vol.14 , Issue.4 , pp. 341-352
    • Handa, V.1    Adas, A.2
  • 31
    • 0141581601 scopus 로고    scopus 로고
    • How to evaluate and invest in emerging A/E/C technologies under uncertainty
    • 0733-9364 10.1061/(ASCE)0733-9364(2003)129:1(16)
    • Ho, S. P., and Liu, L. Y. (2003). How to evaluate and invest in emerging A/E/C technologies under uncertainty.. J. Constr. Eng. Manage., 129 (1), 16-24. 0733-9364 10.1061/(ASCE)0733-9364(2003)129:1(16)
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.1 , pp. 16-24
    • Ho, S.P.1    Liu, L.Y.2
  • 32
    • 0000230521 scopus 로고    scopus 로고
    • Use of partial least squares (PLS) in strategic management research: A review of four recent studies
    • Hulland, J. (1999). Use of partial least squares (PLS) in strategic management research: A review of four recent studies.. Strategic Manage. J., 20 (2), 195-204. 0143-2095 10.1002/(SICI)1097-0266(199902)20:2<195::AID- SMJ13>3.0.CO;2-7 (Pubitemid 129545447)
    • (1999) Strategic Management Journal , vol.20 , Issue.2 , pp. 195-204
    • Hulland, J.1
  • 33
    • 0001877955 scopus 로고
    • The ML and PLS technique for modeling with latent variables: Historical and comparative aspects
    • K. G. Joreskog and H. Wold, eds., North Holland, Amsterdam, The Netherlands.
    • Joreskog, K. G., and Wold, H. (1982). The ML and PLS technique for modeling with latent variables: Historical and comparative aspects.. System under indirect observation: Causality, structure, prediction-Part 1, K. G. Joreskog, and, H. Wold, eds., North Holland, Amsterdam, The Netherlands, 263-270.
    • (1982) System under Indirect Observation: Causality, Structure, Prediction-Part 1 , pp. 263-270
    • Joreskog, K.G.1    Wold, H.2
  • 34
    • 0032206692 scopus 로고    scopus 로고
    • Business failures: Liabilities of newness, adolescence, and smallness
    • Kale, S., and Arditi, D. (1998). Business failure: Liabilities of newness, adolescence, and smallness.. J. Constr. Eng. Manage., 124 (6), 458-464. 0733-9364 10.1061/(ASCE)0733-9364(1998)124:6(458) (Pubitemid 128592657)
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.6 , pp. 458-464
    • Kale, S.1    Arditi, D.2
  • 35
    • 0035452559 scopus 로고    scopus 로고
    • General contractors' relationships with subcontractors: A strategic asset
    • DOI 10.1080/01446190110049839
    • Kale, S., and Arditi, D. (2001). General contractors' relationships with subcontractors: A strategic asset.. Constr. Manage. Econ., 19 (5), 541-549. 0144-6193 (Pubitemid 32635995)
    • (2001) Construction Management and Economics , vol.19 , Issue.5 , pp. 541-549
    • Kale, S.1    Arditi, D.2
  • 36
    • 0033283986 scopus 로고    scopus 로고
    • Theoretical framework for analyzing the dimensions of manufacturing flexibility
    • DOI 10.1016/S0272-6963(99)00010-8
    • Koste, L. L., and Malhotra, M. K. (1999). A theoretical framework for analyzing the dimension of manufacturing flexibility.. J. Oper. Manage., 18 (1), 75-93. (Pubitemid 32080768)
    • (1999) Journal of Operations Management , vol.18 , Issue.1 , pp. 75-93
    • Koste, L.L.1    Malhotra, M.K.2
  • 37
    • 0034369927 scopus 로고    scopus 로고
    • Trade-offs among the elements of flexibility: A comparison from the automotive industry
    • Koste, L. L., and Malhotra, M. K. (2000). Trade-offs among the elements of flexibility: A comparison from the automotive industry.. Omega, 28 (6), 693-710.
    • (2000) Omega , vol.28 , Issue.6 , pp. 693-710
    • Koste, L.L.1    Malhotra, M.K.2
  • 38
    • 0028498228 scopus 로고
    • Introducing new process technologies into construction companies
    • 0733-9364 10.1061/(ASCE)0733-9364(1994)120:3(488)
    • Laborde, M., and Sanvido, V. (1994). Introducing new process technologies into construction companies.. J. Constr. Eng. Manage., 120 (3), 488-508. 0733-9364 10.1061/(ASCE)0733-9364(1994)120:3(488)
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.3 , pp. 488-508
    • Laborde, M.1    Sanvido, V.2
  • 40
    • 84947859920 scopus 로고
    • A practical approach to auditing organizational flexibility
    • 0144-6193
    • Lansley, P. R. (1983). A practical approach to auditing organizational flexibility.. Constr. Manage. Econ., 1 (2), 145-156. 0144-6193
    • (1983) Constr. Manage. Econ. , vol.1 , Issue.2 , pp. 145-156
    • Lansley, P.R.1
  • 41
    • 0001430908 scopus 로고
    • Corporate strategy and survival in the UK construction industry
    • 0144-6193
    • Lansley, P. R. (1987). Corporate strategy and survival in the UK construction industry.. Constr. Manage. Econ., 5 (2), 141-155. 0144-6193
    • (1987) Constr. Manage. Econ. , vol.5 , Issue.2 , pp. 141-155
    • Lansley, P.R.1
  • 42
    • 0342850318 scopus 로고
    • The Final Re on a Research Project with Financial Support of the Dept. of the Environment, Building Industry Group, Ashridge Management Research Unit, Hertfordshire, UK.
    • Lansley, P., Quince, T., and Lea, E. (1979). Flexibility and efficiency in construction management.. The Final Rep. on a Research Project with Financial Support of the Dept. of the Environment, Building Industry Group, Ashridge Management Research Unit, Hertfordshire, UK.
    • (1979) Flexibility and Efficiency in Construction Management
    • Lansley, P.1    Quince, T.2    Lea, E.3
  • 43
    • 79952289302 scopus 로고    scopus 로고
    • Flexibility: A uni- or multi-dimensional concept for construction business?
    • Faculty of Architecture, Planning and Surveying (FSPU), Univ. Teknologi MARA, Shah Alam, Selangor, Malaysia.
    • Lim, B. T. H., and Oo, B. L. (2007). Flexibility: A uni- or multi-dimensional concept for construction business? Proc., Management in Construction and Researchers Association (MICRA) Meetings and Conf., Faculty of Architecture, Planning and Surveying (FSPU), Univ. Teknologi MARA, Shah Alam, Selangor, Malaysia.
    • (2007) Proc., Management in Construction and Researchers Association (MICRA) Meetings and Conf.
    • Lim, B.T.H.1    Oo, B.L.2
  • 44
    • 84877614550 scopus 로고    scopus 로고
    • Flexibility management in the changing competitive environment
    • Univ. of Reading, Reading, UK.
    • Lim, B. T. H., Ling, F. Y. Y., and Ofori, G. (2007). Flexibility management in the changing competitive environment.. Proc., CME 25th Anniversary Int. Conf., Univ. of Reading, Reading, UK.
    • (2007) Proc., CME 25th Anniversary Int. Conf.
    • Lim, B.T.H.1    Ling, F.Y.Y.2    Ofori, G.3
  • 45
    • 26444465546 scopus 로고    scopus 로고
    • Flexibility of manufacturing systems, strategic change and performance
    • DOI 10.1016/j.ijpe.2004.05.011, PII S0925527304004165
    • Llorens, F. J., Molina, L. M., and Verdu, A. J. (2005). Flexibility of manufacturing systems, strategic change and performance.. Int. J. Prod. Econ. 0925-5273, 98 (3), 273-289. 10.1016/j.ijpe.2004.05.011 (Pubitemid 41430328)
    • (2005) International Journal of Production Economics , vol.98 , Issue.3 , pp. 273-289
    • Llorens, F.J.1    Molina, L.M.2    Verdu, A.J.3
  • 47
    • 0034269299 scopus 로고    scopus 로고
    • Forces driving adoption of new information technologies
    • 0733-9364 10.1061/(ASCE)0733-9364(2000)126:5(340)
    • Mitropoulos, P., and Tatum, C. B. (2000). Forces driving adoption of new information technologies.. J. Constr. Eng. Manage., 126 (5), 340-348. 0733-9364 10.1061/(ASCE)0733-9364(2000)126:5(340)
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.5 , pp. 340-348
    • Mitropoulos, P.1    Tatum, C.B.2
  • 49
    • 0001180888 scopus 로고    scopus 로고
    • Flexible management of workers: Review of employment practices in the construction industry in Singapore
    • Ofori, G., and Debrah, Y. A. (1998). Flexible management of workers: Review of employment practices in the construction industry in Singapore.. Constr. Manage. Econ., 16 (4), 397-408. 0144-6193 10.1080/014461998372187 (Pubitemid 128650978)
    • (1998) Construction Management and Economics , vol.16 , Issue.4 , pp. 397-408
    • Ofori, G.1    Debrah, Y.A.2
  • 50
    • 24944520503 scopus 로고    scopus 로고
    • A framework for analyzing manufacturing flexibility
    • Oke, A. (2005). A framework for analyzing manufacturing flexibility.. Int. J. Oper. Prod. Manage., 25 (10), 973-996.
    • (2005) Int. J. Oper. Prod. Manage. , vol.25 , Issue.10 , pp. 973-996
    • Oke, A.1
  • 53
    • 84989078094 scopus 로고
    • Strategic flexibility in product competition
    • 0143-2095 10.1002/smj.4250160921
    • Sanchez, R. (1995). Strategic flexibility in product competition.. Strategic Manage. J., 16 (summer-special issue), 135-159. 0143-2095 10.1002/smj.4250160921
    • (1995) Strategic Manage. J. , vol.16 , Issue.SUMMER-SPECIAL ISSUE , pp. 135-159
    • Sanchez, R.1
  • 54
    • 34248539177 scopus 로고
    • Flexibility in manufacturing: A survey
    • 0920-6299 10.1007/BF00186471
    • Sethi, A. K., and Sethi, P. S. (1990). Flexibility in manufacturing: A survey.. Int. J. Flexible Manuf. Syst., 2 (4), 289-328. 0920-6299 10.1007/BF00186471
    • (1990) Int. J. Flexible Manuf. Syst. , vol.2 , Issue.4 , pp. 289-328
    • Sethi, A.K.1    Sethi, P.S.2
  • 55
    • 0031495464 scopus 로고    scopus 로고
    • A framework for market-based organizational learning: Linking values, knowledge, and behaviour
    • Sinkula, J. M., Baker, W. E., and Noordewier, T. (1997). A framework for market-based organizational learning: Linking values, knowledge, and behaviour.. J. Acad. Mark. Sci., 25 (4), 305-318.
    • (1997) J. Acad. Mark. Sci. , vol.25 , Issue.4 , pp. 305-318
    • Sinkula, J.M.1    Baker, W.E.2    Noordewier, T.3
  • 56
    • 28344457393 scopus 로고    scopus 로고
    • The changing nature of operations flexibility-Update
    • Slack, N. (2005). The changing nature of operations flexibility-Update.. Int. J. Oper. Prod. Manage., 25 (12), 1201-1210.
    • (2005) Int. J. Oper. Prod. Manage. , vol.25 , Issue.12 , pp. 1201-1210
    • Slack, N.1
  • 57
    • 79952305518 scopus 로고    scopus 로고
    • [Computer software]. Hamburg Univ. of Technology, Institute for Human Resource Management Organizations, Hamburg, Germany.
    • SmartPLS 2.0 M3. [Computer software]. Hamburg Univ. of Technology, Institute for Human Resource Management Organizations, Hamburg, Germany.
    • SmartPLS 2.0 M3
  • 58
    • 0002790386 scopus 로고
    • An empirical study of flexibility in manufacturing
    • 0019-848X
    • Suarez, F. F., Cusumano, M. A., and Fine, C. H. (1995). An empirical study of flexibility in manufacturing.. Sloan Manage. Rev. Bank Mark., 37 (1), 25-32. 0019-848X
    • (1995) Sloan Manage. Rev. Bank Mark. , vol.37 , Issue.1 , pp. 25-32
    • Suarez, F.F.1    Cusumano, M.A.2    Fine, C.H.3
  • 59
    • 0033159664 scopus 로고    scopus 로고
    • Why good companies go bad
    • Sull, D. N. (1999). Why good companies go bad.. Harvard Bus. Rev., 77 (4), 42-50.
    • (1999) Harvard Bus. Rev. , vol.77 , Issue.4 , pp. 42-50
    • Sull, D.N.1
  • 60
    • 29144483522 scopus 로고    scopus 로고
    • The antecedents of supply chain agility of a firm: Scale development and model testing
    • DOI 10.1016/j.jom.2005.05.002, PII S0272696305000975
    • Swafford, P. M., Ghosh, S., and Murthy, N. (2006). The antecedents of supply chain agility of a firm: Scale development and model testing.. J. Oper. Manage., 24 (2), 170-188. (Pubitemid 41808261)
    • (2006) Journal of Operations Management , vol.24 , Issue.2 , pp. 170-188
    • Swafford, P.M.1    Ghosh, S.2    Murthy, N.3
  • 61
    • 0033249248 scopus 로고    scopus 로고
    • A resource-based view of product development
    • Verona, G. A. (1999). A resource-based view of product development.. Acad. Manage. Rev., 24 (1), 132-142.
    • (1999) Acad. Manage. Rev. , vol.24 , Issue.1 , pp. 132-142
    • Verona, G.A.1
  • 62
    • 0001402041 scopus 로고    scopus 로고
    • Institutional reform in British construction: Partnering and private finance
    • 0961-3218 10.1080/096132100369046
    • Winch, G. M. (2000). Institutional reform in British construction: Partnering and private finance.. Build. Res. Inf., 28 (2), 141-155. 0961-3218 10.1080/096132100369046
    • (2000) Build. Res. Inf. , vol.28 , Issue.2 , pp. 141-155
    • Winch, G.M.1
  • 63
    • 3142640705 scopus 로고    scopus 로고
    • The strategic implications of flexibility in manufacturing systems
    • Yadav, R. N., Narain, R., Sarkis, J., and Cordeiro, J. J. (2000). The strategic implications of flexibility in manufacturing systems.. Int. J. Agile Manage. Syst., 2 (3), 202-213.
    • (2000) Int. J. Agile Manage. Syst. , vol.2 , Issue.3 , pp. 202-213
    • Yadav, R.N.1    Narain, R.2    Sarkis, J.3    Cordeiro, J.J.4
  • 64
    • 0037358091 scopus 로고    scopus 로고
    • Manufacturing flexibility: Defining and analyzing relationships among competence, capability and customer satisfaction
    • Zhang, Q. Y., Vonderembse, M. A., and Lim, J. S. (2003). Manufacturing flexibility: Defining and analyzing relationships among competence, capability and customer satisfaction.. J. Oper. Manage., 21 (2), 173-191.
    • (2003) J. Oper. Manage. , vol.21 , Issue.2 , pp. 173-191
    • Zhang, Q.Y.1    Vonderembse, M.A.2    Lim, J.S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.