메뉴 건너뛰기




Volumn , Issue , 2007, Pages 689-698

Flexibility management in the changing competitive environment

Author keywords

Competitiveness; Management of change; Management of firm

Indexed keywords

COMPETITIVE ENVIRONMENT; COMPETITIVENESS; CONSTRUCTION BUSINESS; FUNDAMENTAL PRINCIPLES; MANAGEMENT OF CHANGE; MANUFACTURING FLEXIBILITY; REAL OPTION APPROACHES; SUPPLY CHAIN RELATIONSHIPS;

EID: 84877614550     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (4)

References (51)
  • 2
    • 4243130940 scopus 로고
    • Achieving and measuring flexibility in project information retrieval
    • Betts, M (1991) Achieving and measuring flexibility in project information retrieval. Construction Management and Economics, 9(3), 231-45.
    • (1991) Construction Management and Economics , vol.9 , Issue.3 , pp. 231-245
    • Betts, M.1
  • 3
    • 29144532233 scopus 로고    scopus 로고
    • Towards best management practices for implementing manufacturing flexibility
    • Boyle, T A (2006) Towards best management practices for implementing manufacturing flexibility. Journal of Manufacturing Technology Management, 17 (1), 6-21.
    • (2006) Journal of Manufacturing Technology Management , vol.17 , Issue.1 , pp. 6-21
    • Boyle, T.A.1
  • 6
    • 33746242380 scopus 로고    scopus 로고
    • Supplier involvement and manufacturing flexibility
    • Chang, S C, Chen, R H, Lin, R J, Tien, S W and Sheu, C (2006) Supplier involvement and manufacturing flexibility. Technovation, 26(10), 1136-46.
    • (2006) Technovation , vol.26 , Issue.10 , pp. 1136-1146
    • Chang, S.C.1    Chen, R.H.2    Lin, R.J.3    Tien, S.W.4    Sheu, C.5
  • 7
    • 3543107106 scopus 로고
    • The flexibility of technological and human resources in automotive manufacturing
    • Correa, H L (1994) The flexibility of technological and human resources in automotive manufacturing. Integrated Manufacturing System, 5(1), 33-40.
    • (1994) Integrated Manufacturing System , vol.5 , Issue.1 , pp. 33-40
    • Correa, H.L.1
  • 10
    • 0036274295 scopus 로고    scopus 로고
    • An audit tool for determining flexibility requirements in a manufacturing facility
    • Das, S K and Patel, P (2002) An audit tool for determining flexibility requirements in a manufacturing facility. Integrated Manufacturing Systems, 13(4), 264-74.
    • (2002) Integrated Manufacturing Systems , vol.13 , Issue.4 , pp. 264-274
    • Das, S.K.1    Patel, P.2
  • 13
    • 15944365887 scopus 로고    scopus 로고
    • Valuing flexibility in architectural, engineering, and construction information technology investment
    • Ekstrom, M A and Bjornsson, H C (2005) Valuing flexibility in architectural, engineering, and construction information technology investment. Journal of Construction Engineering and Management, 131(4), 431-8.
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.4 , pp. 431-438
    • Ekstrom, M.A.1    Bjornsson, H.C.2
  • 14
    • 84980248442 scopus 로고
    • Strategic flexibility for high technology manoeuvres: A conceptual framework
    • Evan, J S (1991) Strategic flexibility for high technology manoeuvres: a conceptual framework. Journal of Management Studies, 28(1), 69-89.
    • (1991) Journal of Management Studies , vol.28 , Issue.1 , pp. 69-89
    • Evan, J.S.1
  • 15
    • 84989095992 scopus 로고
    • Output flexibility - A competitive advantage for small firms
    • Fiegenbaum, A and Karnani, A (1991) Output flexibility - a competitive advantage for small firms. Strategic Management Journal, 12(2), 101-14.
    • (1991) Strategic Management Journal , vol.12 , Issue.2 , pp. 101-114
    • Fiegenbaum, A.1    Karnani, A.2
  • 16
    • 0036604189 scopus 로고    scopus 로고
    • A real options approach to value strategic flexibility in uncertain construction projects
    • Ford, D N, Lander, D M and Voyer, J J (2002) A real options approach to value strategic flexibility in uncertain construction projects. Construction Management and Economics, 20(4), 343-51.
    • (2002) Construction Management and Economics , vol.20 , Issue.4 , pp. 343-351
    • Ford, D.N.1    Lander, D.M.2    Voyer, J.J.3
  • 20
    • 84968099966 scopus 로고
    • The resource based theory of competitive advantage: Implications of strategy formulation
    • Spring
    • Grant, R M (1991) The resource based theory of competitive advantage: implications of strategy formulation. California Management Review, 33(3) Spring, 114-35.
    • (1991) California Management Review , vol.33 , Issue.3 , pp. 114-135
    • Grant, R.M.1
  • 21
    • 0002507155 scopus 로고    scopus 로고
    • Business strategy, manufacturing flexibility, and organizational performance relationships: A path analysis approach
    • Gupta, Y P and Somers, T M (1996) Business strategy, manufacturing flexibility, and organizational performance relationships: a path analysis approach. Production and Operations Management, 5(3), 204-33.
    • (1996) Production and Operations Management , vol.5 , Issue.3 , pp. 204-233
    • Gupta, Y.P.1    Somers, T.M.2
  • 22
    • 0001944856 scopus 로고
    • A framework for understanding flexibility of manufacturing system
    • Gupta, Y P and Buzacott, J A (1989) A framework for understanding flexibility of manufacturing system. Journal of Manufacturing System, 8(2), 89-97.
    • (1989) Journal of Manufacturing System , vol.8 , Issue.2 , pp. 89-97
    • Gupta, Y.P.1    Buzacott, J.A.2
  • 23
    • 0024765077 scopus 로고
    • Flexibility of manufacturing systems: Concepts and measurement
    • Gupta, Y P and Goyal, S (1989) Flexibility of manufacturing systems: concepts and measurement. European Journal of Operational Research, 43(2), 119-35.
    • (1989) European Journal of Operational Research , vol.43 , Issue.2 , pp. 119-135
    • Gupta, Y.P.1    Goyal, S.2
  • 24
    • 0038123954 scopus 로고    scopus 로고
    • Predicting the level of organizational effectiveness: A methodology for the construction firm
    • Handa, V and Adas, A (1996) Predicting the level of organizational effectiveness: a methodology for the construction firm. Construction Management and Economics, 14(4), 341-52.
    • (1996) Construction Management and Economics , vol.14 , Issue.4 , pp. 341-352
    • Handa, V.1    Adas, A.2
  • 25
  • 27
    • 0033283986 scopus 로고    scopus 로고
    • A theoretical framework for analyzing the dimension of manufacturing flexibility
    • Koste, L L and Malhotra, M K (1999) A theoretical framework for analyzing the dimension of manufacturing flexibility. Journal of Operations Management, 18(1), 75-93.
    • (1999) Journal of Operations Management , vol.18 , Issue.1 , pp. 75-93
    • Koste, L.L.1    Malhotra, M.K.2
  • 29
    • 0016268146 scopus 로고
    • Organization structure, management style and company performance
    • Lansley, P R, Sadler, P and Webb, T (1974) Organization structure, management style and company performance. Omega, 2(4), 468-85.
    • (1974) Omega , vol.2 , Issue.4 , pp. 468-485
    • Lansley, P.R.1    Sadler, P.2    Webb, T.3
  • 30
    • 49549138870 scopus 로고
    • Organization structure, management style and company performance: Some recent results
    • Lansley, P R, Sadler, P and Webb, T (1975) Organization structure, management style and company performance: some recent results. Omega, 3(5), 615-17.
    • (1975) Omega , vol.3 , Issue.5 , pp. 615-617
    • Lansley, P.R.1    Sadler, P.2    Webb, T.3
  • 31
    • 84947859920 scopus 로고
    • A practical approach to auditing organizational flexibility
    • Lansley, P R (1983) A practical approach to auditing organizational flexibility. Construction Management and Economics, 1(2), 145-56.
    • (1983) Construction Management and Economics , vol.1 , Issue.2 , pp. 145-156
    • Lansley, P.R.1
  • 32
    • 0001430908 scopus 로고
    • Corporate strategy and survival in the UK construction industry
    • Lansley, P R (1987) Corporate strategy and survival in the UK construction industry. Construction Management and Economics, 5(2), 141-51.
    • (1987) Construction Management and Economics , vol.5 , Issue.2 , pp. 141-151
    • Lansley, P.R.1
  • 33
    • 84986129934 scopus 로고    scopus 로고
    • Preparing for an uncertain future
    • McGregor, W (2000) Preparing for an uncertain future. Facilities, 18 (10-12), 402-10.
    • (2000) Facilities , vol.18 , Issue.10-12 , pp. 402-410
    • McGregor, W.1
  • 34
    • 0026850471 scopus 로고
    • Some performance measures of flexible manufacturing systems
    • Nagarur, N (1992) Some performance measures of flexible manufacturing systems. International Journal of Production Research, 30(4), 799-809.
    • (1992) International Journal of Production Research , vol.30 , Issue.4 , pp. 799-809
    • Nagarur, N.1
  • 35
    • 0001180888 scopus 로고    scopus 로고
    • Flexible management of workers: Review of employment practices in the construction industry in Singapore
    • Ofori, G and Debrah, Y A (1998) Flexible management of workers: review of employment practices in the construction industry in Singapore. Construction Management and Economics, 16(4), 397-408.
    • (1998) Construction Management and Economics , vol.16 , Issue.4 , pp. 397-408
    • Ofori, G.1    Debrah, Y.A.2
  • 38
    • 0032681956 scopus 로고    scopus 로고
    • Manufacturing flexibility: Measures and relationships
    • Parker, R P and Wirth, A (1999) Manufacturing flexibility: measures and relationships. European Journal of Operational Research, 118(3), 429-49.
    • (1999) European Journal of Operational Research , vol.118 , Issue.3 , pp. 429-449
    • Parker, R.P.1    Wirth, A.2
  • 39
    • 1642477963 scopus 로고    scopus 로고
    • Re-exploring the relationship between flexibility and the external environment
    • Pagell, M and Krause, D R (2004) Re-exploring the relationship between flexibility and the external environment. Journal of Operations Management, 21(6), 629-49.
    • (2004) Journal of Operations Management , vol.21 , Issue.6 , pp. 629-649
    • Pagell, M.1    Krause, D.R.2
  • 42
    • 0029776287 scopus 로고    scopus 로고
    • An empirical study of manufacturing flexibility in printed circuit board assembly
    • Suarez, F F, Cusumano, M A, Fine, C H (1996) An empirical study of manufacturing flexibility in printed circuit board assembly. Operations Research, 44(1), 223-40.
    • (1996) Operations Research , vol.44 , Issue.1 , pp. 223-240
    • Suarez, F.F.1    Cusumano, M.A.2    Fine, C.H.3
  • 43
    • 29144483522 scopus 로고    scopus 로고
    • The antecedents of supply chain agility of a firm: Scale development and model testing
    • Swafford, P M, Ghosh, S and Murthy, N (2006) The antecedents of supply chain agility of a firm: scale development and model testing. Journal of Operations Management, 24(2), 170-88.
    • (2006) Journal of Operations Management , vol.24 , Issue.2 , pp. 170-188
    • Swafford, P.M.1    Ghosh, S.2    Murthy, N.3
  • 44
    • 0009335734 scopus 로고    scopus 로고
    • Shifting paradigms: From newton to chaos
    • Tetenbaum, T J (1998) Shifting paradigms: from Newton to chaos. Organizational Dynamics, 26(4), 21-32.
    • (1998) Organizational Dynamics , vol.26 , Issue.4 , pp. 21-32
    • Tetenbaum, T.J.1
  • 45
    • 0000991529 scopus 로고
    • Flexibility as process mobility: The management of plant capabilities for quick response manufacturing
    • Upton, D M (1995) Flexibility as process mobility: the management of plant capabilities for quick response manufacturing. Journal of Operations Management, 12(3-4), 205-24.
    • (1995) Journal of Operations Management , vol.12 , Issue.3-4 , pp. 205-224
    • Upton, D.M.1
  • 46
    • 0031197670 scopus 로고    scopus 로고
    • Process range in manufacturing: An empirical study of flexibility
    • Upton, D M (1997) Process range in manufacturing: an empirical study of flexibility. Management Science, 43(8), 1079-92.
    • (1997) Management Science , vol.43 , Issue.8 , pp. 1079-1092
    • Upton, D.M.1
  • 47
    • 0033737562 scopus 로고    scopus 로고
    • A review of empirical research on manufacturing flexibility
    • Vokurka, R J and O'Leary-Kelly, S W (2000) A review of empirical research on manufacturing flexibility. Journal of Operations Management, 18(4), 485-501.
    • (2000) Journal of Operations Management , vol.18 , Issue.4 , pp. 485-501
    • Vokurka, R.J.1    O'Leary-Kelly, S.W.2
  • 48
    • 84986079134 scopus 로고    scopus 로고
    • Flexible problem solving in construction project on the national museum of Australia project
    • Walker, D H T and Loosemore, M (2003) Flexible problem solving in construction project on the National Museum of Australia project. Team Performance Management: An International Journal, 9(1-2), 5-15.
    • (2003) Team Performance Management: An International Journal , vol.9 , Issue.1-2 , pp. 5-15
    • Walker, D.H.T.1    Loosemore, M.2
  • 49
    • 0036140889 scopus 로고    scopus 로고
    • Project understanding, planning flexibility of management action and construction performance: Two Australian case studies
    • Walker, D H T and Shen, Y J (2002) Project understanding, planning flexibility of management action and construction performance: two Australian case studies. Construction Management and Economics, 20(1), 31-44.
    • (2002) Construction Management and Economics , vol.20 , Issue.1 , pp. 31-44
    • Walker, D.H.T.1    Shen, Y.J.2
  • 51
    • 0037358091 scopus 로고    scopus 로고
    • Manufacturing flexibility: Defining and analyzing relationships among competence, capability and customer satisfaction
    • Zhang, Q Y, Vonderembse, M A and Lim, J S (2003) Manufacturing flexibility: defining and analyzing relationships among competence, capability and customer satisfaction. Journal of Operations Management, 21(2), 173-91.
    • (2003) Journal of Operations Management , vol.21 , Issue.2 , pp. 173-191
    • Zhang, Q.Y.1    Vonderembse, M.A.2    Lim, J.S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.