메뉴 건너뛰기




Volumn 130, Issue 2, 2011, Pages 230-235

Group scheduling and due date assignment on a single machine

Author keywords

Due date assignment; Earlinesstardiness; Group technology; Single machine scheduling

Indexed keywords

COMMON DUE DATE; DUE DATES; DUE-DATE ASSIGNMENT; EARLINESSTARDINESS; EQUAL FLOW; FLOW-TIME; GROUP SCHEDULING; JOB SCHEDULING; OBJECTIVE FUNCTIONS; OPTIMAL COMBINATION; OPTIMIZATION ALGORITHMS; PRODUCTION EFFICIENCY; SET-UP TIME; SINGLE MACHINES; SINGLE-MACHINE SCHEDULING;

EID: 79951720643     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2010.12.023     Document Type: Article
Times cited : (42)

References (33)
  • 2
    • 36849082395 scopus 로고    scopus 로고
    • A survey of scheduling problems with setup times or costs
    • DOI 10.1016/j.ejor.2006.06.060, PII S0377221706008174
    • A. Allahverdi, C.T. Ng, T.C.E. Cheng, and M.Y. Kovalyov A survey of scheduling problems with setup times or costs European Journal of Operational Research 187 2008 985 1032 (Pubitemid 350236619)
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 985-1032
    • Allahverdi, A.1    Ng, C.T.2    Cheng, T.C.E.3    Kovalyov, M.Y.4
  • 5
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • K.R. Baker, and G.D. Scudder Sequencing with earliness and tardiness penalties: a review Operations Research 38 1990 22 36
    • (1990) Operations Research , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 6
    • 84910732893 scopus 로고
    • Determination of an optimal common due date and optimal sequence in a single job shop
    • C.R. Bector, Y.P. Gupta, and M.C. Gupta Determination of an optimal common due date and optimal sequence in a single job shop International Journal of Production Research 26 1988 613 628
    • (1988) International Journal of Production Research , vol.26 , pp. 613-628
    • Bector, C.R.1    Gupta, Y.P.2    Gupta, M.C.3
  • 7
    • 58149145431 scopus 로고    scopus 로고
    • A note on due-date assignment and single machine scheduling with a learning/aging effect
    • P.C. Chang, S.H. Chen, and V. Mani A note on due-date assignment and single machine scheduling with a learning/aging effect International Journal of Production Economics 117 2009 142 149
    • (2009) International Journal of Production Economics , vol.117 , pp. 142-149
    • Chang, P.C.1    Chen, S.H.2    Mani, V.3
  • 8
    • 0031077981 scopus 로고    scopus 로고
    • Single machine scheduling with common due date assignment in a group technology environment
    • D.W. Chen, S.L. Li, and G.C. Tang Single machine scheduling with common due date assignment in a group technology environment Mathematical and Computer Modelling 25 1997 81 90
    • (1997) Mathematical and Computer Modelling , vol.25 , pp. 81-90
    • Chen, D.W.1    Li, S.L.2    Tang, G.C.3
  • 9
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • T.C.E. Cheng, and M.C. Gupta Survey of scheduling research involving due date determination decisions European Journal of Operational Research 38 1989 156 166
    • (1989) European Journal of Operational Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 10
    • 0008346991 scopus 로고    scopus 로고
    • Batch scheduling and common due-date assignment on a single machine
    • DOI 10.1016/0166-218X(96)80468-9
    • T.C.E. Cheng, and M.Y. Kovalyov Batch scheduling and common due-date assignment on a single machine Discrete Applied Mathematics 70 1996 231 245 (Pubitemid 126399090)
    • (1996) Discrete Applied Mathematics , vol.70 , Issue.3 , pp. 231-245
    • Cheng, T.C.E.1    Kovalyov, M.Y.2
  • 12
    • 0037118177 scopus 로고    scopus 로고
    • A survey of the state-of-the-art of common due date assignment and scheduling research
    • V.S. Gordon, J.M. Proth, and C.B. Chu A survey of the state-of-the-art of common due date assignment and scheduling research European Journal of Operational Research 139 2002 1 25
    • (2002) European Journal of Operational Research , vol.139 , pp. 1-25
    • Gordon, V.S.1    Proth, J.M.2    Chu, C.B.3
  • 13
    • 0036507457 scopus 로고    scopus 로고
    • Due date assignment and scheduling: SLK, TWK and other due date assignment models
    • DOI 10.1080/09537280110069621
    • V.S. Gordon, J.M. Proth, and C.B. Chu Due date assignment and scheduling: SLK, TWK and other due date assignment models Production Planning and Control 13 2002 117 132 (Pubitemid 34586389)
    • (2002) Production Planning and Control , vol.13 , Issue.2 , pp. 117-132
    • Gordon, V.S.1    Proth, J.-M.2    Chu, C.3
  • 18
    • 85034239852 scopus 로고    scopus 로고
    • Due date quotation models and algorithms
    • P. Kaminsky, and D. Hochbaum Due date quotation models and algorithms J.Y.T. Leung, Handbook of Scheduling 2004 CRC Press Boca Raton, FL 20-1 20-22
    • (2004) Handbook of Scheduling , pp. 201-2022
    • Kaminsky, P.1    Hochbaum, D.2
  • 19
    • 77950371029 scopus 로고    scopus 로고
    • A unified approach for scheduling with convex resource consumption functions using positional penalties
    • Y. Leyvand, D. Shabtay, and G. Steiner A unified approach for scheduling with convex resource consumption functions using positional penalties European Journal of Operational Research 206 2010 301 312
    • (2010) European Journal of Operational Research , vol.206 , pp. 301-312
    • Leyvand, Y.1    Shabtay, D.2    Steiner, G.3
  • 22
    • 15244358285 scopus 로고    scopus 로고
    • Group scheduling with controllable setup and processing times: Minimizing total weighted completion time
    • DOI 10.1007/s10479-004-5030-1
    • C.T. Ng, T.C.E. Cheng, A. Janiak, and M.Y. Kovalyov Group scheduling with controllable setup and processing times: minimizing total weighted completion time Annals of Operations Research 133 2005 163 174 (Pubitemid 40389746)
    • (2005) Annals of Operations Research , vol.133 , Issue.1-4 , pp. 163-174
    • Ng, C.T.1    Cheng, T.C.E.2    Janiak, A.3    Kovalyov, M.Y.4
  • 23
    • 0037410951 scopus 로고    scopus 로고
    • Single machine scheduling with a variable common due date and resource-dependent processing times
    • DOI 10.1016/S0305-0548(02)00066-7, PII S0305054802000667
    • C.T. Ng, T.C.E. Cheng, M.Y. Kovalyov, and S.S. Lam Single machine scheduling with a variable common due date and resource-dependent processing times Computers and Operations Research 30 2003 1173 1185 (Pubitemid 36346003)
    • (2003) Computers and Operations Research , vol.30 , Issue.8 , pp. 1173-1185
    • Ng Daniel, C.T.D.1    Cheng, T.C.E.2    Kovalyov, M.Y.3    Lam, S.S.4
  • 24
    • 0020103079 scopus 로고
    • Common due date assignment to minimize total penalty for the one machine scheduling problem
    • S.S. Panwalkar, M.L. Smith, and A. Seidmann Common due date assignment to minimize total penalty for the one machine scheduling problem Operations Research 30 1982 391 399
    • (1982) Operations Research , vol.30 , pp. 391-399
    • Panwalkar, S.S.1    Smith, M.L.2    Seidmann, A.3
  • 25
    • 0033895628 scopus 로고    scopus 로고
    • Scheduling with batching: A review
    • DOI 10.1016/S0377-2217(99)00153-8
    • C.N. Potts, and M.Y. Kovalyov Scheduling with batching: a review European Journal of Operational Research 120 2000 228 249 (Pubitemid 30542656)
    • (2000) European Journal of Operational Research , vol.120 , Issue.2 , pp. 228-249
    • Potts, C.N.1    Kovalyov, M.Y.2
  • 26
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
    • C.N. Potts, and L.N. Van Wassenhove Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity Journal of the Operational Research Society 43 1992 395 406
    • (1992) Journal of the Operational Research Society , vol.43 , pp. 395-406
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 28
    • 70449520162 scopus 로고    scopus 로고
    • Scheduling and due date assignment to minimize earliness, tardiness, holding, due date assignment and batch delivery costs
    • D. Shabtay Scheduling and due date assignment to minimize earliness, tardiness, holding, due date assignment and batch delivery costs International Journal of Production Economics 123 2010 235 242
    • (2010) International Journal of Production Economics , vol.123 , pp. 235-242
    • Shabtay, D.1
  • 29
    • 77955275487 scopus 로고    scopus 로고
    • Optimal due date assignment and resource allocation in a group technology scheduling environment
    • D. Shabtay, Y. Itskovich, L. Yedidsion, and D. Oron Optimal due date assignment and resource allocation in a group technology scheduling environment Computers and Operations Research 37 2010 2218 2228
    • (2010) Computers and Operations Research , vol.37 , pp. 2218-2228
    • Shabtay, D.1    Itskovich, Y.2    Yedidsion, L.3    Oron, D.4
  • 30
    • 43149124396 scopus 로고    scopus 로고
    • Optimal due date assignment in multi-machine scheduling environments
    • DOI 10.1007/s10951-007-0015-y
    • D. Shabtay, and G. Steiner Optimal due date assignment in multi-machine scheduling environments Journal of Scheduling 11 2008 217 228 (Pubitemid 351641249)
    • (2008) Journal of Scheduling , vol.11 , Issue.3 , pp. 217-228
    • Shabtay, D.1    Steiner, G.2
  • 31
    • 38749154324 scopus 로고    scopus 로고
    • The single-machine earlinesstardiness scheduling problem with due date assignment and resource-dependent processing times
    • D. Shabtay, and G. Steiner The single-machine earlinesstardiness scheduling problem with due date assignment and resource-dependent processing times Annals of Operations Research 159 2008 25 40
    • (2008) Annals of Operations Research , vol.159 , pp. 25-40
    • Shabtay, D.1    Steiner, G.2
  • 32
    • 0026916831 scopus 로고
    • Adoption and implementation of group technology classification and coding systems: Insights from seven case studies
    • M.V. Tatikonda, and U. Wemmerlv Adoption and implementation of group technology classification and coding systems: insights from seven case studies International Journal of Production Research 30 1992 2087 2110
    • (1992) International Journal of Production Research , vol.30 , pp. 2087-2110
    • Tatikonda, M.V.1    Wemmerlv, U.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.