Volumn 5, Issue 3, 2008, Pages 594-604

Group sequencing around a common due date

Author keywords

Dynamic programming; Earliness tardiness; Group technology; Single machine scheduling

Indexed keywords

ALGORITHMS; COMPUTATIONAL METHODS; DYNAMIC PROGRAMMING; LARGE SCALE SYSTEMS; OPTIMAL SYSTEMS; PROBLEM SOLVING;

EID: 43849108156     PISSN: 15725286     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.disopt.2006.04.003     Document Type: Article
Times cited : (9)

References (25)
  • 1
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • Baker K.R., and Scudder G.D. Sequencing with earliness and tardiness penalties: A review. Operations Research 38 (1990) 22-36
    • (1990) Operations Research , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 2
    • 0037118177 scopus 로고    scopus 로고
    • A survey of the state-of-the-art of common due date assignment and scheduling research
    • Chu C., Gordon V.S., and Proth J.-M. A survey of the state-of-the-art of common due date assignment and scheduling research. European Journal of Operational Research 139 (2002) 1-25
    • (2002) European Journal of Operational Research , vol.139 , pp. 1-25
    • Chu, C.1    Gordon, V.S.2    Proth, J.-M.3
  • 6
    • 0026223827 scopus 로고
    • Earliness-tardiness scheduling problems, II: Deviation of completion times about a restrictive common due date
    • Hall N.G., Kubiak W., and Sethi S.P. Earliness-tardiness scheduling problems, II: Deviation of completion times about a restrictive common due date. Operations Research 39 (1991) 847-857
    • (1991) Operations Research , vol.39 , pp. 847-857
    • Hall, N.G.1    Kubiak, W.2    Sethi, S.P.3
  • 7
    • 0026223840 scopus 로고
    • Earliness-tardiness scheduling problems, I: Weighted deviation of completion times about a common due date
    • Hall N.G., and Posner M.E. Earliness-tardiness scheduling problems, I: Weighted deviation of completion times about a common due date. Operations Research 39 (1991) 836-846
    • (1991) Operations Research , vol.39 , pp. 836-846
    • Hall, N.G.1    Posner, M.E.2
  • 9
    • 21844489413 scopus 로고
    • Single machine group scheduling with ordered criteria
    • Janiak A., and Kovalyov M.Y. Single machine group scheduling with ordered criteria. Annals of Operations Research 57 (1995) 191-201
    • (1995) Annals of Operations Research , vol.57 , pp. 191-201
    • Janiak, A.1    Kovalyov, M.Y.2
  • 10
  • 11
    • 0347138143 scopus 로고    scopus 로고
    • Sequencing with ordered criteria, precedence and group technology constraints
    • Janiak A., Shafransky Y.M., and Tuzikov A.V. Sequencing with ordered criteria, precedence and group technology constraints. Informatica 12 (2001) 61-88
    • (2001) Informatica , vol.12 , pp. 61-88
    • Janiak, A.1    Shafransky, Y.M.2    Tuzikov, A.V.3
  • 12
    • 0033685372 scopus 로고    scopus 로고
    • Scheduling with inserted idle time: Problem taxonomy and literature review
    • Kanet J.J., and Sridharan V. Scheduling with inserted idle time: Problem taxonomy and literature review. Operations Research 48 (2000) 99-110
    • (2000) Operations Research , vol.48 , pp. 99-110
    • Kanet, J.J.1    Sridharan, V.2
  • 15
    • 0041542981 scopus 로고    scopus 로고
    • Minimizing the number of late jobs under the group technology assumption
    • Liu Z., and Yu W. Minimizing the number of late jobs under the group technology assumption. Journal of Combinatorial Optimization 3 (1999) 5-15
    • (1999) Journal of Combinatorial Optimization , vol.3 , pp. 5-15
    • Liu, Z.1    Yu, W.2
  • 16
    • 0004082771 scopus 로고
    • (Harris E. Yorkshire Trans.), National Lending Library for Science and Technology, Boston Spa, Yorks
    • Mitrofanov S.P. Scientific Principles of Group Technology. (Harris E. Yorkshire Trans.) (1966), National Lending Library for Science and Technology, Boston Spa, Yorks
    • (1966) Scientific Principles of Group Technology
    • Mitrofanov, S.P.1
  • 21
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
    • Potts C.N., and Van Wassenhove L.N. Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity. Journal of the Operations Research Society 43 (1992) 395-406
    • (1992) Journal of the Operations Research Society , vol.43 , pp. 395-406
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 22
    • 0026916831 scopus 로고
    • Adoption and implementation of group technology classification and coding systems: Insights from seven case studies
    • Tatikonda M.V., and Wemmerlöv U. Adoption and implementation of group technology classification and coding systems: Insights from seven case studies. International Journal of Production Research 30 (1992) 2087-2110
    • (1992) International Journal of Production Research , vol.30 , pp. 2087-2110
    • Tatikonda, M.V.1    Wemmerlöv, U.2
  • 23
    • 0031075338 scopus 로고    scopus 로고
    • The complexity of scheduling job families about a common due date
    • Webster S.T. The complexity of scheduling job families about a common due date. Operations Research Letters 20 (1997) 65-74
    • (1997) Operations Research Letters , vol.20 , pp. 65-74
    • Webster, S.T.1
  • 24
    • 0024731850 scopus 로고
    • Cellular manufacturing in the US industry, a survey of current practices
    • Wemmerlöv U., and Hyer N.L. Cellular manufacturing in the US industry, a survey of current practices. International Journal of Production Research 27 (1989) 1511-1530
    • (1989) International Journal of Production Research , vol.27 , pp. 1511-1530
    • Wemmerlöv, U.1    Hyer, N.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.