메뉴 건너뛰기




Volumn 129, Issue 1, 2011, Pages 79-85

Due date assignment in repetitive projects

Author keywords

PERT networks; Project management; Queueing

Indexed keywords

ACTIVITY DURATION; AGGREGATE COSTS; COMPLETION TIME; CONTINUOUS TIME MARKOV CHAIN; DISTRIBUTED RANDOM VARIABLES; DUE DATES; DUE-DATE ASSIGNMENT; ERLANG DISTRIBUTION; LEADTIME; LINEAR FUNCTIONS; MONTE CARLO SIMULATION; OPTIMAL CONSTANT; PENALTY COST; PERT NETWORKS; PROJECT COMPLETION; QUEUEING; RENEWAL PROCESS; SERVICE TIME;

EID: 78649316570     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2010.09.004     Document Type: Article
Times cited : (12)

References (21)
  • 1
    • 0000858254 scopus 로고
    • From project to process management: An empirically-based framework for analyzing product development time
    • P.S. Adler, A. Mandelbaum, V. Nguyen, and E. Schwerer From project to process management: an empirically-based framework for analyzing product development time Management Science 41 1995 458 484
    • (1995) Management Science , vol.41 , pp. 458-484
    • Adler, P.S.1    Mandelbaum, A.2    Nguyen, V.3    Schwerer, E.4
  • 3
    • 15244342527 scopus 로고    scopus 로고
    • Distribution function of the shortest path in networks of queues
    • A. Azaron, and M. Modarres Distribution function of the shortest path in networks of queues OR Spectrum 27 2005 123 144
    • (2005) OR Spectrum , vol.27 , pp. 123-144
    • Azaron, A.1    Modarres, M.2
  • 5
    • 84985756243 scopus 로고
    • A comparison of due-date setting resource assignment and job preemption heuristics for the multi-project scheduling problem
    • D.B. Bock, and J.H. Patterson A comparison of due-date setting resource assignment and job preemption heuristics for the multi-project scheduling problem Decision Sciences 21 1990 387 402
    • (1990) Decision Sciences , vol.21 , pp. 387-402
    • Bock, D.B.1    Patterson, J.H.2
  • 6
    • 0005350580 scopus 로고
    • Critical path analysis via chance constrained and stochastic programming
    • A. Charnes, W. Cooper, and G. Thompson Critical path analysis via chance constrained and stochastic programming Operations Research 12 1964 460 470
    • (1964) Operations Research , vol.12 , pp. 460-470
    • Charnes, A.1    Cooper, W.2    Thompson, G.3
  • 8
    • 0023824517 scopus 로고
    • Evaluating project scheduling and due-date assignment procedures: An experimental analysis
    • E.J. Dumond, and V.A. Mabert Evaluating project scheduling and due-date assignment procedures: an experimental analysis Management Sciences 34 1988 101 118
    • (1988) Management Sciences , vol.34 , pp. 101-118
    • Dumond, E.J.1    Mabert, V.A.2
  • 9
    • 0000788322 scopus 로고
    • On the expected duration of PERT type networks
    • S. Elmaghraby On the expected duration of PERT type networks Management Science 13 1967 299 306
    • (1967) Management Science , vol.13 , pp. 299-306
    • Elmaghraby, S.1
  • 10
    • 0033132231 scopus 로고    scopus 로고
    • A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network
    • S.M.T. Fatemi Ghomi, and S. Hashemin A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network European Journal of Operational Research 114 1999 610 625
    • (1999) European Journal of Operational Research , vol.114 , pp. 610-625
    • Fatemi Ghomi, S.M.T.1    Hashemin, S.2
  • 12
    • 0001287631 scopus 로고
    • Expected critical path lengths in PERT networks
    • D. Fulkerson Expected critical path lengths in PERT networks Operations Research 10 1962 808 817
    • (1962) Operations Research , vol.10 , pp. 808-817
    • Fulkerson, D.1
  • 14
    • 0022785024 scopus 로고
    • Markov and Markov-regenerative PERT networks
    • V. Kulkarni, and V. Adlakha Markov and Markov-regenerative PERT networks Operations Research 34 1986 769 781
    • (1986) Operations Research , vol.34 , pp. 769-781
    • Kulkarni, V.1    Adlakha, V.2
  • 16
    • 0003107787 scopus 로고
    • Distribution of the time through a directed acyclic network
    • J. Martin Distribution of the time through a directed acyclic network Operations Research 13 1965 46 66
    • (1965) Operations Research , vol.13 , pp. 46-66
    • Martin, J.1
  • 17
    • 0000446325 scopus 로고
    • Estimating the mean and variance of subjective distributions in PERT and decision analysis
    • C. Perry, and I. Creig Estimating the mean and variance of subjective distributions in PERT and decision analysis Management Science 21 1975 1477 1480
    • (1975) Management Science , vol.21 , pp. 1477-1480
    • Perry, C.1    Creig, I.2
  • 18
    • 0001082875 scopus 로고
    • Expected completion time in PERT networks
    • P. Robillard Expected completion time in PERT networks Operations Research 24 1976 177 182
    • (1976) Operations Research , vol.24 , pp. 177-182
    • Robillard, P.1
  • 19
    • 0034326162 scopus 로고    scopus 로고
    • The exact overall time distribution of a project with uncertain task durations
    • C. Schmit, and I. Grossmann The exact overall time distribution of a project with uncertain task durations European Journal of Operational Research 126 2000 614 636
    • (2000) European Journal of Operational Research , vol.126 , pp. 614-636
    • Schmit, C.1    Grossmann, I.2
  • 20
    • 0019560165 scopus 로고
    • Due date assignment for production systems
    • A. Seidman, and M.L. Smith Due date assignment for production systems Management Science 27 1981 571 581
    • (1981) Management Science , vol.27 , pp. 571-581
    • Seidman, A.1    Smith, M.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.