-
5
-
-
79251607870
-
-
HSE. The Offshore Installations (Safety Case) Regulations, 2005. [cited: 20 September, 2010]
-
HSE. The Offshore Installations (Safety Case) Regulations, 2005. [cited: 20 September, 2010]. Available at: 〈 http://www.opsi.gov.uk/si/si2005/ 20053117.htm 〉.
-
-
-
-
6
-
-
38949105462
-
Theories of (safety) culture revisited - An anthropological approach
-
K. Haukelid Theories of (safety) culture revisited - An anthropological approach Safety Science 46 2008 413 426
-
(2008)
Safety Science
, vol.46
, pp. 413-426
-
-
Haukelid, K.1
-
9
-
-
0032108483
-
Evaluation of methodology for QRA in offshore operations
-
J.E. Vinnem Evaluation of methodology for QRA in offshore operations Reliability Engineering and System Safety. 61 1998 39 52
-
(1998)
Reliability Engineering and System Safety.
, vol.61
, pp. 39-52
-
-
Vinnem, J.E.1
-
15
-
-
77952873276
-
-
Esrel Stavanger Norway
-
J.E. Vinnem, S. Haugen, T. Kongsvik, J. Seljelid, S. Steen, and S. Sklet Operational Safety ConditionConcept Development 2007 Esrel Stavanger Norway
-
(2007)
Operational Safety ConditionConcept Development
-
-
Vinnem, J.E.1
Haugen, S.2
Kongsvik, T.3
Seljelid, J.4
Steen, S.5
Sklet, S.6
-
16
-
-
1642521855
-
Human and Organizational factors in design and operation of deepwater structures
-
Houston, USA
-
Bea R. Human and Organizational factors in design and operation of deepwater structures. Offshore Technology Conference, Houston, USA; 2002.
-
(2002)
Offshore Technology Conference
-
-
Bea, R.1
-
17
-
-
0036193385
-
Human and organizational factors in reliability assessment and management of offshore structures
-
R. Bea Human and organizational factors in reliability assessment and management of offshore structures Risk Analysis 22 2002 29 45
-
(2002)
Risk Analysis
, vol.22
, pp. 29-45
-
-
Bea, R.1
-
21
-
-
0032108840
-
The contribution of human factors to accidents in the offshore oil industry
-
R.P.E. Gordon The contribution of human factors to accidents in the offshore oil industry. Reliability Engineering and System Safety 61 1998 95 108
-
(1998)
Reliability Engineering and System Safety
, vol.61
, pp. 95-108
-
-
Gordon, R.P.E.1
-
23
-
-
75149172868
-
Human and organisational factors in the operational phase of safety instrumented systems: A new approach
-
M. Schnbeck, M. Rausand, and J. Rouvroye Human and organisational factors in the operational phase of safety instrumented systems: A new approach Safety Science 48 2010 310 318
-
(2010)
Safety Science
, vol.48
, pp. 310-318
-
-
Schnbeck, M.1
Rausand, M.2
Rouvroye, J.3
-
25
-
-
38949176312
-
Development of a functional model which integrates human factors, safety management systems and wider organisational issues
-
L.J. Bellamy, T.A.W. Geyer, and J. Wilkinson Development of a functional model which integrates human factors, safety management systems and wider organisational issues Safety Science 46 2008 461 492
-
(2008)
Safety Science
, vol.46
, pp. 461-492
-
-
Bellamy, L.J.1
Geyer, T.A.W.2
Wilkinson, J.3
-
27
-
-
0348042916
-
Model-based human reliability analysis: Prospects and requirements
-
A. Mosleh, and Y.H. Chang Model-based human reliability analysis: Prospects and requirements Reliability Engineering and System Safety. 83 2004 241 253
-
(2004)
Reliability Engineering and System Safety.
, vol.83
, pp. 241-253
-
-
Mosleh, A.1
Chang, Y.H.2
-
28
-
-
0027047845
-
Incorporating management and organisational factors into probabilistic safety assessment
-
D.E. Embrey Incorporating management and organisational factors into probabilistic safety assessment Reliability Engineering and System Safety. 38 1992 199 208
-
(1992)
Reliability Engineering and System Safety.
, vol.38
, pp. 199-208
-
-
Embrey, D.E.1
-
30
-
-
0028565737
-
Incorporating organizational factors into risk assessment through the analysis of work processes
-
K. Davoudian, J.-S. Wu, and G. Apostolakis Incorporating organizational factors into risk assessment through the analysis of work processes Reliability Engineering and System Safety. 45 1994 85 105
-
(1994)
Reliability Engineering and System Safety.
, vol.45
, pp. 85-105
-
-
Davoudian, K.1
Wu, J.-S.2
Apostolakis, G.3
-
31
-
-
0030205540
-
Human and management factors in probabilistic risk analysis: The SAM approach and observations from recent applications
-
M. Elisabeth Pat-Cornell, and D.M. Murphy Human and management factors in probabilistic risk analysis: the SAM approach and observations from recent applications Reliability Engineering and System Safety. 53 1996 115 126
-
(1996)
Reliability Engineering and System Safety.
, vol.53
, pp. 115-126
-
-
Elisabeth Pat-Cornell, M.1
Murphy, D.M.2
-
32
-
-
4243394089
-
An approach for assessing the impact of organizational factors on risk
-
Center for Technology Risk Studies, University of Maryland at College Park, MD, USA
-
Mosleh A, Golfeiz E. An approach for assessing the impact of organizational factors on risk. Technical Research Report. Center for Technology Risk Studies, University of Maryland at College Park, MD, USA; 1999.
-
(1999)
Technical Research Report.
-
-
Mosleh, A.1
Golfeiz, E.2
-
33
-
-
0142248887
-
I-Risk: Development of an integrated technical and management risk methodology for chemical installations
-
I.A. Papazoglou, L.J. Bellamy, A.R. Hale, O.N. Aneziris, B.J.M. Ale, and J.G. Post I-Risk: development of an integrated technical and management risk methodology for chemical installations Journal of Loss Prevention in the Process Industries 16 2003 575 591
-
(2003)
Journal of Loss Prevention in the Process Industries
, vol.16
, pp. 575-591
-
-
Papazoglou, I.A.1
Bellamy, L.J.2
Hale, A.R.3
Aneziris, O.N.4
Ale, B.J.M.5
Post, J.G.6
-
34
-
-
0001301667
-
The I-Risk project: Development of an integrated technical and management risk control and monitoring methodology for managing and quantifying on-site and off-site risks
-
Springer London
-
J. Oh, W. Brouwer, L. Bellamy, A. Hale, B. Ale, and I. Papazoglou The I-Risk project: development of an integrated technical and management risk control and monitoring methodology for managing and quantifying on-site and off-site risks Probabilistic Safety Assessment and Management 1998 Springer London p. 248591
-
(1998)
Probabilistic Safety Assessment and Management
-
-
Oh, J.1
Brouwer, W.2
Bellamy, L.3
Hale, A.4
Ale, B.5
Papazoglou, I.6
-
35
-
-
4243412052
-
-
US Nuclear Regulatory Commission, Washington DC, USA
-
Wreathall J, Schurman D, Modarres M, Anderson N, Roush M, Mosleh A. US Nuclear Regulatory Commission: A framework and method for the amalgamation of performance indicators at nuclear power plants 1 and 2. US Nuclear Regulatory Commission, Washington DC, USA; 1992.
-
(1992)
US Nuclear Regulatory Commission: A Framework and Method for the Amalgamation of Performance Indicators at Nuclear Power Plants 1 and 2
-
-
Wreathall, J.1
Schurman, D.2
Modarres, M.3
Anderson, N.4
Roush, M.5
Mosleh, A.6
-
36
-
-
33747087758
-
Towards a causal model for air transport safety - An ongoing research project
-
B.J.M. Ale, L.J. Bellamy, R.M. Cooke, L.H.J. Goossens, A.R. Hale, and A.L.C. Roelen Towards a causal model for air transport safety - an ongoing research project Safety Science 44 2006 657 673
-
(2006)
Safety Science
, vol.44
, pp. 657-673
-
-
Ale, B.J.M.1
Bellamy, L.J.2
Cooke, R.M.3
Goossens, L.H.J.4
Hale, A.R.5
Roelen, A.L.C.6
-
37
-
-
0035501173
-
A framework for the establishment of organizational risk indicators
-
K. Øien A framework for the establishment of organizational risk indicators Reliability Engineering and System Safety. 74 2001 147 167
-
(2001)
Reliability Engineering and System Safety.
, vol.74
, pp. 147-167
-
-
Øien, K.1
-
38
-
-
33748419016
-
Barrier and operational risk analysis of hydrocarbon releases (BORA-Release) Part I. Method description
-
T. Aven, S. Sklet, and J.E. Vinnem Barrier and operational risk analysis of hydrocarbon releases (BORA-Release) Part I. Method description Journal of Hazardous Materials 137 2006 681 691
-
(2006)
Journal of Hazardous Materials
, vol.137
, pp. 681-691
-
-
Aven, T.1
Sklet, S.2
Vinnem, J.E.3
-
39
-
-
33748424513
-
Barrier and operational risk analysis of hydrocarbon releases (BORA-Release) Part II: Results from a case study
-
S. Sklet, J.E. Vinnem, and T. Aven Barrier and operational risk analysis of hydrocarbon releases (BORA-Release) Part II: results from a case study Journal of Hazardous Materials 137 2006 692 708
-
(2006)
Journal of Hazardous Materials
, vol.137
, pp. 692-708
-
-
Sklet, S.1
Vinnem, J.E.2
Aven, T.3
-
40
-
-
66049123824
-
Incorporating organizational factors into probabilistic risk assessment of complex socio-technical systems: Principles and theoretical foundations
-
Z. Mohaghegh, and A. Mosleh Incorporating organizational factors into probabilistic risk assessment of complex socio-technical systems: Principles and theoretical foundations Safety Science 47 2009 1139 1158
-
(2009)
Safety Science
, vol.47
, pp. 1139-1158
-
-
Mohaghegh, Z.1
Mosleh, A.2
-
43
-
-
47349128195
-
-
Baker J, Bowman F, Erwin G, Gorton S, Hendershot D, Leveson N. The report of the BP U.S. Refineries independent safety review panel; 2007.
-
(2007)
The Report of the BP U.S. Refineries Independent Safety Review Panel
-
-
Baker, J.1
Bowman, F.2
Erwin, G.3
Gorton, S.4
Hendershot, D.5
Leveson, N.6
-
47
-
-
34948901686
-
-
Petroleum Safety Authority, Norway
-
Brattbakk M, Østvold L, Zwaag C, Hiim H. Investigation of gas blowout on Snorre A, Well 34/7-P31A, 28 November 2004. Petroleum Safety Authority, Norway; 2005. p. 53.
-
(2005)
Investigation of Gas Blowout on Snorre A, Well 34/7-P31A, 28 November 2004
, pp. 53
-
-
Brattbakk, M.1
Østvold, L.2
Zwaag, C.3
Hiim, H.4
-
48
-
-
79251646237
-
-
Petroleum Safety Authority Norway [Internet]. The Continental Shelf. Stavanger; 2010 [cited: 17 September 2010]
-
Petroleum Safety Authority Norway [Internet]. The Continental Shelf. Stavanger; 2010 [cited: 17 September 2010]. Available at: 〈 http://www.ptil.no/regulations/the-continental-shelf-article4246-87.html 〉.
-
-
-
-
55
-
-
47349103553
-
Human-technical interface of collision risk under dynamic conditions: An exploratory learning case from the North Sea
-
J.E. Vinnem, and J.P. Liyanage Human-technical interface of collision risk under dynamic conditions: an exploratory learning case from the North Sea International Journal of Technology and Human Interaction 4 2008 34 47
-
(2008)
International Journal of Technology and Human Interaction
, vol.4
, pp. 34-47
-
-
Vinnem, J.E.1
Liyanage, J.P.2
-
59
-
-
56849125016
-
Performance of European crosscountry oil pipelines. Statistical summary of reported spillages in 2006 and since 1971
-
P.M. Davis, J. Dubois, G. Levi, and F. Uhlig Performance of European crosscountry oil pipelines. Statistical summary of reported spillages in 2006 and since 1971 CONCAWE, Oil Pipelines Management Group 2008 54
-
(2008)
CONCAWE, Oil Pipelines Management Group
, pp. 54
-
-
Davis, P.M.1
Dubois, J.2
Levi, G.3
Uhlig, F.4
-
60
-
-
33645318443
-
New tool for human error probability calculation for offshore operation
-
F.I. Khan, and A. HEPI new tool for human error probability calculation for offshore operation Safety Science 44 2006 313
-
(2006)
Safety Science
, vol.44
, pp. 313
-
-
Khan, F.I.1
Hepi, A.2
-
63
-
-
77951046172
-
Risk indicators for major hazards on offshore installations
-
J. Vinnem Risk indicators for major hazards on offshore installations Safety Science 48 2010 770 787
-
(2010)
Safety Science
, vol.48
, pp. 770-787
-
-
Vinnem, J.1
-
66
-
-
79251613035
-
Organisational factors, their definition and influence on nuclear safety
-
B. Wahlstrm Organisational factors, their definition and influence on nuclear safety Technical Research Centre of Finland 2000 22
-
(2000)
Technical Research Centre of Finland
, pp. 22
-
-
Wahlstrm, B.1
-
68
-
-
79957660503
-
-
Standards Norway Z-013 Draft edition 3rd ed., Norwegian Technology Centre, Oslo
-
Standards Norway. Norsok Standard: Risk and emergency preparedness analysis, Z-013 Draft edition 3rd ed., Norwegian Technology Centre, Oslo; 2010.
-
(2010)
Norsok Standard: Risk and Emergency Preparedness Analysis
-
-
|