메뉴 건너뛰기




Volumn 38, Issue 5, 2011, Pages 5514-5524

Risk assessment for highway projects using jackknife technique

Author keywords

Highway projects; Jackknife; Non parametric resampling technique; Risk assessment

Indexed keywords

HIGHWAY PROJECTS; JACKKNIFE; NON-PARAMETRIC; NORMAL PROBABILITY PLOT; RESAMPLING TECHNIQUE; RISK RANKING; STANDARD DEVIATION; STATISTICAL DISTRIBUTION;

EID: 79151485088     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2010.10.085     Document Type: Article
Times cited : (37)

References (62)
  • 2
    • 41749097241 scopus 로고    scopus 로고
    • Resampling methods revisited: Advancing the understanding and applications in educational research
    • H. Bai, and W. Pan Resampling methods revisited: Advancing the understanding and applications in educational research International Journal of Research and Method in Education 31 1 2008 45 62
    • (2008) International Journal of Research and Method in Education , vol.31 , Issue.1 , pp. 45-62
    • Bai, H.1    Pan, W.2
  • 3
    • 34250199704 scopus 로고    scopus 로고
    • Comparison of hydrologically based instream flow methods using a resampling technique
    • D. Caissie, N. El-Jabi, and C. Hébert Comparison of hydrologically based instream flow methods using a resampling technique Canadian Journal of Civil Engineering 34 1 2007 66 74
    • (2007) Canadian Journal of Civil Engineering , vol.34 , Issue.1 , pp. 66-74
    • Caissie, D.1    El-Jabi, N.2    Hébert, C.3
  • 4
    • 79958120632 scopus 로고    scopus 로고
    • Caltrans California Department of Transportation (Caltrans), Office of Project Management Process Improvement, Sacramento, CA
    • Caltrans (2007). Project risk management handbook. California Department of Transportation (Caltrans), Office of Project Management Process Improvement, Sacramento, CA.
    • (2007) Project Risk Management Handbook
  • 6
    • 38349123279 scopus 로고    scopus 로고
    • Fuzzy logic pavement maintenance and rehabilitation triggering approach for probabilistic life-cycle cost analysis
    • C. Chen, and G.W. Flintsch Fuzzy logic pavement maintenance and rehabilitation triggering approach for probabilistic life-cycle cost analysis Transportation Research Record 1990 2007 80 91
    • (2007) Transportation Research Record , vol.1990 , pp. 80-91
    • Chen, C.1    Flintsch, G.W.2
  • 7
    • 53349129734 scopus 로고    scopus 로고
    • Variance models for project financial risk analysis with applications to greenfield BOT highway projects
    • N. Chiara, and M.J. Garvin Variance models for project financial risk analysis with applications to greenfield BOT highway projects Construction Management and Economics 26 9 2008 925 939
    • (2008) Construction Management and Economics , vol.26 , Issue.9 , pp. 925-939
    • Chiara, N.1    Garvin, M.J.2
  • 9
    • 34547205260 scopus 로고    scopus 로고
    • Improved errors-in-variables estimators for grouped data
    • P.J. Devereux Improved errors-in-variables estimators for grouped data Journal of Business and Economic Statistics 25 3 2007 278 287
    • (2007) Journal of Business and Economic Statistics , vol.25 , Issue.3 , pp. 278-287
    • Devereux, P.J.1
  • 11
    • 0033536169 scopus 로고    scopus 로고
    • Hierarchical testing of three rainfall-runoff models in small forested catchments
    • L.M. Donnelly-Makowecki, and R.D. Moore Hierarchical testing of three rainfall-runoff models in small forested catchments Journal of Hydrology 219 3-4 1999 136 152
    • (1999) Journal of Hydrology , vol.219 , Issue.34 , pp. 136-152
    • Donnelly-Makowecki, L.M.1    Moore, R.D.2
  • 12
    • 0035480039 scopus 로고    scopus 로고
    • Jackknife and bootstrap methods in the identification of dynamic models
    • C. Duchesne, and J.F. MacGregor Jackknife and bootstrap methods in the identification of dynamic models Journal of Process Control 11 2001 553 564
    • (2001) Journal of Process Control , vol.11 , pp. 553-564
    • Duchesne, C.1    MacGregor, J.F.2
  • 16
    • 70349448102 scopus 로고    scopus 로고
    • Risk identification and assessment for build-operate-transfer projects: A fuzzy multi attribute decision making model
    • S. Ebrahimnejad, S.M. Mousavi, and H. Seyrafianpour Risk identification and assessment for build-operate-transfer projects: A fuzzy multi attribute decision making model Expert Systems with Applications 37 2010 575 586
    • (2010) Expert Systems with Applications , vol.37 , pp. 575-586
    • Ebrahimnejad, S.1    Mousavi, S.M.2    Seyrafianpour, H.3
  • 19
    • 79151483500 scopus 로고    scopus 로고
    • Engineering & Urban Construction Organization of Tehran (EUCOT)
    • Engineering & Urban Construction Organization of Tehran (EUCOT) (2009). Construction project reports. http://omran.tehran.ir/Default.aspx?tabid= 9490&language=fa-IR.
    • (2009) Construction Project Reports
  • 21
    • 34547309470 scopus 로고    scopus 로고
    • A fuzzy multi-criteria model applied to the management of the environmental restoration of paved highways
    • S. Filippo, P.C.M. Ribeiro, and S.K. Ribeiro A fuzzy multi-criteria model applied to the management of the environmental restoration of paved highways Transportation Research Part D: Transport and Environment 12 6 2007 423 436
    • (2007) Transportation Research Part D: Transport and Environment , vol.12 , Issue.6 , pp. 423-436
    • Filippo, S.1    Ribeiro, P.C.M.2    Ribeiro, S.K.3
  • 22
    • 33847328396 scopus 로고    scopus 로고
    • Rainfall stochastic disaggregation models: Calibration and validation of a multiplicative cascade model
    • E. Gaume, N. Mouhous, and H. Andrieu Rainfall stochastic disaggregation models: Calibration and validation of a multiplicative cascade model Advances in Water Resources 30 5 2007 1301 1319
    • (2007) Advances in Water Resources , vol.30 , Issue.5 , pp. 1301-1319
    • Gaume, E.1    Mouhous, N.2    Andrieu, H.3
  • 23
    • 35748939728 scopus 로고    scopus 로고
    • Subsampling techniques and the Jackknife methodology in the estimation of the extremal index
    • M.I. Gomes, A. Hall, and M.C. Miranda Subsampling techniques and the Jackknife methodology in the estimation of the extremal index Computational Statistics and Data Analysis 52 4 2008 2022 2041
    • (2008) Computational Statistics and Data Analysis , vol.52 , Issue.4 , pp. 2022-2041
    • Gomes, M.I.1    Hall, A.2    Miranda, M.C.3
  • 25
    • 17444426298 scopus 로고    scopus 로고
    • Reliability confidence intervals for ceramic components as obtained from bootstrap methods and neural networks
    • K. Heiermann, H. Riesch-Oppermann, and N. Huber Reliability confidence intervals for ceramic components as obtained from bootstrap methods and neural networks Computational Materials Science 34 2005 1 13
    • (2005) Computational Materials Science , vol.34 , pp. 1-13
    • Heiermann, K.1    Riesch-Oppermann, H.2    Huber, N.3
  • 26
    • 23644442557 scopus 로고    scopus 로고
    • The bootstrap: A technique for data-driven statistics. Using computer-intensive analyzes to explore experimental data
    • A.R. Henderson The bootstrap: A technique for data-driven statistics. Using computer-intensive analyzes to explore experimental data Clinica Chimica Acta 359 1-2 2005 1 26
    • (2005) Clinica Chimica Acta , vol.359 , Issue.12 , pp. 1-26
    • Henderson, A.R.1
  • 27
    • 84948493784 scopus 로고
    • Jackknifing in unbalanced situations
    • D.V. Hinkley Jackknifing in unbalanced situations Technometrics 19 1977 285 292
    • (1977) Technometrics , vol.19 , pp. 285-292
    • Hinkley, D.V.1
  • 29
    • 38849113943 scopus 로고    scopus 로고
    • Measurement of ERP latency differences: A comparison of single-participant and jackknife-based scoring methods
    • A. Kiesel, J. Miller, P. Jolicoeur, and B. Brisson Measurement of ERP latency differences: A comparison of single-participant and jackknife-based scoring methods Psychophysiology 45 2 2008 250 274
    • (2008) Psychophysiology , vol.45 , Issue.2 , pp. 250-274
    • Kiesel, A.1    Miller, J.2    Jolicoeur, P.3    Brisson, B.4
  • 31
    • 58349115825 scopus 로고    scopus 로고
    • Large engineering project risk management using a Bayesian belief network
    • E. Lee, Y. Park, and J.G. Shin Large engineering project risk management using a Bayesian belief network Expert Systems with Applications 36 3 2009 5880 5887
    • (2009) Expert Systems with Applications , vol.36 , Issue.3 , pp. 5880-5887
    • Lee, E.1    Park, Y.2    Shin, J.G.3
  • 33
    • 43849107352 scopus 로고    scopus 로고
    • Quantifying uncertainty in extreme values of design parameters with resampling techniques
    • Y. Li, D. Simmonds, and D. Reeve Quantifying uncertainty in extreme values of design parameters with resampling techniques Ocean Engineering 35 10 2008 1029 1038
    • (2008) Ocean Engineering , vol.35 , Issue.10 , pp. 1029-1038
    • Li, Y.1    Simmonds, D.2    Reeve, D.3
  • 34
    • 38349147994 scopus 로고    scopus 로고
    • Probabilistic approach to the identification of input variables to estimate hydraulic conductivity
    • A. Lilly, A. Nemes, W.J. Rawls, and Y.A. Pachepsky Probabilistic approach to the identification of input variables to estimate hydraulic conductivity Soil Science Society of America Journal 72 1 2008 16 24
    • (2008) Soil Science Society of America Journal , vol.72 , Issue.1 , pp. 16-24
    • Lilly, A.1    Nemes, A.2    Rawls, W.J.3    Pachepsky, Y.A.4
  • 36
    • 60049084425 scopus 로고    scopus 로고
    • Why jackknifing yields good latency estimates
    • J. Miller, R. Ulrich, and W. Schwarz Why jackknifing yields good latency estimates Psychophysiology 46 2 2009 300 312
    • (2009) Psychophysiology , vol.46 , Issue.2 , pp. 300-312
    • Miller, J.1    Ulrich, R.2    Schwarz, W.3
  • 38
    • 63049113735 scopus 로고    scopus 로고
    • A non-parametric statistical approach for analyzing risk factor data in risk management process
    • S.M.H. Mojtahedi, S.M. Mousavi, and A. Aminian A non-parametric statistical approach for analyzing risk factor data in risk management process Journal of Applied Sciences 9 1 2009 113 120
    • (2009) Journal of Applied Sciences , vol.9 , Issue.1 , pp. 113-120
    • Mojtahedi, S.M.H.1    Mousavi, S.M.2    Aminian, A.3
  • 39
    • 76749119364 scopus 로고    scopus 로고
    • Project risk identification and assessment simultaneously using multi-attribute group decision making technique
    • S.M.H. Mojtahedi, S.M. Mousavi, and A. Makui Project risk identification and assessment simultaneously using multi-attribute group decision making technique Safety Science 48 2010 499 507
    • (2010) Safety Science , vol.48 , pp. 499-507
    • Mojtahedi, S.M.H.1    Mousavi, S.M.2    Makui, A.3
  • 44
    • 79151483500 scopus 로고    scopus 로고
    • President Deputy Strategic Planning and Control (PDSPC)
    • President Deputy Strategic Planning and Control (PDSPC) (2009). Construction project reports. http://tec.mporg.ir/.
    • (2009) Construction Project Reports
  • 46
    • 37349061320 scopus 로고    scopus 로고
    • Comparing sire and dam estimates of heritability: Jackknife and likelihood approaches
    • D.A. Roff Comparing sire and dam estimates of heritability: Jackknife and likelihood approaches Heredity 100 1 2008 32 38
    • (2008) Heredity , vol.100 , Issue.1 , pp. 32-38
    • Roff, D.A.1
  • 47
    • 0001514453 scopus 로고
    • A general theory for Jackknife variance estimation
    • J. Shao, and C.F.J. Wu A general theory for Jackknife variance estimation The Annals of Statistics 17 1989 1176 1197
    • (1989) The Annals of Statistics , vol.17 , pp. 1176-1197
    • Shao, J.1    Wu, C.F.J.2
  • 48
    • 64749100837 scopus 로고    scopus 로고
    • Predicting DNA- and RNA-binding proteins from sequences with kernel methods
    • X. Shao, Y. Tian, L. Wu, Y. Wang, L. Jing, and N. Deng Predicting DNA- and RNA-binding proteins from sequences with kernel methods Journal of Theoretical Biology 258 2 2009 289 293
    • (2009) Journal of Theoretical Biology , vol.258 , Issue.2 , pp. 289-293
    • Shao, X.1    Tian, Y.2    Wu, L.3    Wang, Y.4    Jing, L.5    Deng, N.6
  • 50
    • 0029269122 scopus 로고
    • The new biostatistics of resampling
    • J.L. Simon, and P. Bruce The new biostatistics of resampling MD computing 12 1995 115 121
    • (1995) MD Computing , vol.12 , pp. 115-121
    • Simon, J.L.1    Bruce, P.2
  • 52
    • 19544394871 scopus 로고    scopus 로고
    • Applying resampling methods to neurophysiological data
    • E. Stark, and M. Abeles Applying resampling methods to neurophysiological data Journal of Neuroscience Methods 145 1-2 2005 133 144
    • (2005) Journal of Neuroscience Methods , vol.145 , Issue.12 , pp. 133-144
    • Stark, E.1    Abeles, M.2
  • 54
    • 79151484956 scopus 로고    scopus 로고
    • Tehran municipality (TM) (2009). http://www.tehran.ir/Default.aspx?tabid= 16428&language=fa-IR.
    • (2009) Tehran Municipality (TM)
  • 55
    • 85032751338 scopus 로고    scopus 로고
    • Jackknifing multitaper spectrum estimates
    • D.J. Thomson Jackknifing multitaper spectrum estimates IEEE Signal Processing Magazine 24 4 2007 20 30
    • (2007) IEEE Signal Processing Magazine , vol.24 , Issue.4 , pp. 20-30
    • Thomson, D.J.1
  • 56
    • 44949233167 scopus 로고    scopus 로고
    • Utilize bootstrap in small data set learning for pilot run modeling of manufacturing systems
    • T.-I. Tsai, and D.-C. Li Utilize bootstrap in small data set learning for pilot run modeling of manufacturing systems Expert Systems with Applications 35 3 2008 1293 1300
    • (2008) Expert Systems with Applications , vol.35 , Issue.3 , pp. 1293-1300
    • Tsai, T.-I.1    Li, D.-C.2
  • 57
    • 0001617782 scopus 로고
    • Bias and confidence in not quite so large samples
    • J. Tukey Bias and confidence in not quite so large samples Annals of Mathematical Statistics 29 1958 614
    • (1958) Annals of Mathematical Statistics , vol.29 , pp. 614
    • Tukey, J.1
  • 58
    • 14744304262 scopus 로고    scopus 로고
    • Risk allocation and risk handling of highway projects in Taiwan
    • M.-T. Wang, and H.-Y. Chou Risk allocation and risk handling of highway projects in Taiwan Journal of Management in Engineering 19 2 2003 60 68
    • (2003) Journal of Management in Engineering , vol.19 , Issue.2 , pp. 60-68
    • Wang, M.-T.1    Chou, H.-Y.2
  • 59
    • 67650496528 scopus 로고    scopus 로고
    • A simulation comparison study for estimating the process capability index Cpm with asymmetric tolerances
    • S.-F. Wu A simulation comparison study for estimating the process capability index Cpm with asymmetric tolerances International Journal of Information and Management Sciences 20 2 2009 243 253
    • (2009) International Journal of Information and Management Sciences , vol.20 , Issue.2 , pp. 243-253
    • Wu, S.-F.1
  • 60
    • 60549107698 scopus 로고    scopus 로고
    • Assessment of lifetime cumulative sun exposure using a self-administered questionnaire: Reliability of two approaches
    • C.-L. Yu, Y. Li, D.M. Freedman, T.R. Fears, R. Kwok, and G. Chodick Assessment of lifetime cumulative sun exposure using a self-administered questionnaire: Reliability of two approaches Cancer Epidemiology Biomarkers and Prevention 18 2 2009 464 471
    • (2009) Cancer Epidemiology Biomarkers and Prevention , vol.18 , Issue.2 , pp. 464-471
    • Yu, C.-L.1    Li, Y.2    Freedman, D.M.3    Fears, T.R.4    Kwok, R.5    Chodick, G.6
  • 61
    • 61349111302 scopus 로고    scopus 로고
    • Evaluation of clinical image processing algorithms used in digital mammography
    • F. Zanca, J. Jacobs, C. Van Ongeval, F. Claus, V. Celis, and C. Geniets Evaluation of clinical image processing algorithms used in digital mammography Medical Physics 36 3 2009 765 775
    • (2009) Medical Physics , vol.36 , Issue.3 , pp. 765-775
    • Zanca, F.1    Jacobs, J.2    Van Ongeval, C.3    Claus, F.4    Celis, V.5    Geniets, C.6
  • 62
    • 44049083501 scopus 로고    scopus 로고
    • Assessing risk and uncertainty inherent in Chinese highway projects using AHP
    • T. Zayed, M. Amer, and J. Pan Assessing risk and uncertainty inherent in Chinese highway projects using AHP International Journal of Project Management 26 4 2008 408 419
    • (2008) International Journal of Project Management , vol.26 , Issue.4 , pp. 408-419
    • Zayed, T.1    Amer, M.2    Pan, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.