메뉴 건너뛰기




Volumn 26, Issue 9, 2008, Pages 925-939

Variance models for project financial risk analysis with applications to greenfield BOT highway projects

Author keywords

Build operate transfer; Monte Carlo simulation; Risk analysis; Stochastic models

Indexed keywords

AGGLOMERATION; ERROR ANALYSIS; FLOW SIMULATION; HIGHWAY ENGINEERING; HIGHWAY PLANNING; MATHEMATICAL MODELS; MONTE CARLO METHODS; OCEAN STRUCTURES; RISK ANALYSIS; RISK ASSESSMENT; RISK MANAGEMENT; RISK PERCEPTION; SAFETY FACTOR; STOCHASTIC PROGRAMMING; TRANSPORTATION ROUTES; UNCERTAINTY ANALYSIS;

EID: 53349129734     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446190802259027     Document Type: Article
Times cited : (33)

References (25)
  • 1
    • 33244495734 scopus 로고    scopus 로고
    • Generalized economic modeling for infrastructure and capital investment projects
    • Aziz, A. M. A. and Russell, A. D. (2006) Generalized economic modeling for infrastructure and capital investment projects. Journal of Infrastructure Systems, 12:1, pp. 18-32.
    • (2006) Journal of Infrastructure Systems , vol.12 , Issue.1 , pp. 18-32
    • Aziz, A.M.A.1    Russell, A.D.2
  • 4
    • 33745103777 scopus 로고    scopus 로고
    • Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation
    • Cheah, C. Y. J. and Liu, J. (2006) Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation. Construction Management and Economics, 24:5, pp. 545-554.
    • (2006) Construction Management and Economics , vol.24 , Issue.5 , pp. 545-554
    • Cheah, C.Y.J.1    Liu, J.2
  • 8
    • 0009903133 scopus 로고    scopus 로고
    • Improved techniques for valuing large scale projects
    • Esty, B. C. (1999) Improved techniques for valuing large scale projects. Journal of Project Finance, 5:1, pp. 9-25.
    • (1999) Journal of Project Finance , vol.5 , Issue.1 , pp. 9-25
    • Esty, B.C.1
  • 10
    • 0028131950 scopus 로고
    • Propagation of uncertainty in risk assessments: The need to distinguish between uncertainty due to lack of knowledge and uncertainty due to variability
    • Hoffman, F. O. and Hammonds, J. S. (1994) Propagation of uncertainty in risk assessments: The need to distinguish between uncertainty due to lack of knowledge and uncertainty due to variability. Risk Analysis, 14:5, pp. 707-712.
    • (1994) Risk Analysis , vol.14 , Issue.5 , pp. 707-712
    • Hoffman, F.O.1    Hammonds, J.S.2
  • 11
    • 0030284123 scopus 로고    scopus 로고
    • Aleatory and epistemic uncertainty in probability elicitation with an example from hazardous waste management
    • Hora, S. C. (1996) Aleatory and epistemic uncertainty in probability elicitation with an example from hazardous waste management. Reliability Engineering and System Safety, 54:2, pp. 217-223.
    • (1996) Reliability Engineering and System Safety , vol.54 , Issue.2 , pp. 217-223
    • Hora, S.C.1
  • 13
    • 0032029383 scopus 로고    scopus 로고
    • Risk analysis of traffic and revenue forecasts for road investment projects
    • Lam, W. H. K. and Tam, M. L. (1998) Risk analysis of traffic and revenue forecasts for road investment projects. Journal of Infrastructure Systems, 4:1, pp. 19-27.
    • (1998) Journal of Infrastructure Systems , vol.4 , Issue.1 , pp. 19-27
    • Lam, W.H.K.1    Tam, M.L.2
  • 15
    • 0032630817 scopus 로고    scopus 로고
    • Build operate transfer municipal bridge projects in India
    • Malini, E. (1999) Build operate transfer municipal bridge projects in India. Journal of Management in Engineering, 15:4, pp. 51-58.
    • (1999) Journal of Management in Engineering , vol.15 , Issue.4 , pp. 51-58
    • Malini, E.1
  • 19
    • 0030286892 scopus 로고    scopus 로고
    • Uncertainties in risk analysis: Six levels of treatment
    • Pate-Cornell, M. E. (1996) Uncertainties in risk analysis: Six levels of treatment. Reliability Engineering and System Safety, 54:2, pp. 95-111.
    • (1996) Reliability Engineering and System Safety , vol.54 , Issue.2 , pp. 95-111
    • Pate-Cornell, M.E.1
  • 20
    • 0031225023 scopus 로고    scopus 로고
    • Transportation infrastructure financing: Evaluation of alternatives
    • Seneviratne, P. N. and Ranasinghe, M. (1997) Transportation infrastructure financing: Evaluation of alternatives. Journal of Infrastructure Systems, 3:3, pp. 111-118.
    • (1997) Journal of Infrastructure Systems , vol.3 , Issue.3 , pp. 111-118
    • Seneviratne, P.N.1    Ranasinghe, M.2
  • 21
    • 12744271519 scopus 로고    scopus 로고
    • Risk concession model for build/operate/transfer contract projects
    • Shen, L. Y. and Wu, Y. Z. (2005) Risk concession model for build/operate/ transfer contract projects. Journal of Construction Engineering and Management, 131:2, pp. 211-220.
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.2 , pp. 211-220
    • Shen, L.Y.1    Wu, Y.Z.2
  • 22
    • 23044512544 scopus 로고    scopus 로고
    • Estimating general threshold traffic levels of typical build, operate, and transfer toll road projects in Indonesia
    • Wibowo, A. (2005) Estimating general threshold traffic levels of typical build, operate, and transfer toll road projects in Indonesia. Construction Management and Economics, 23:6, pp. 621-630.
    • (2005) Construction Management and Economics , vol.23 , Issue.6 , pp. 621-630
    • Wibowo, A.1
  • 24
    • 0008563034 scopus 로고    scopus 로고
    • NPV-at-risk method in infrastructure project investment evaluation
    • Ye, S. and Tiong, R. L. K. (2000) NPV-at-risk method in infrastructure project investment evaluation. Journal of Construction Engineering and Management, 126:3, pp. 227-233.
    • (2000) Journal of Construction Engineering and Management , vol.126 , Issue.3 , pp. 227-233
    • Ye, S.1    Tiong, R.L.K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.