메뉴 건너뛰기




Volumn 14, Issue , 2002, Pages 103-108

Meta-raps approach for solving the resource allocation problem

Author keywords

Computer heuristic; PSPLIB; Resource allocation problem

Indexed keywords

COMBINATORIAL PROBLEM; HEURISTIC RULES; METAHEURISTIC; NEW APPROACHES; PRECEDENCE CONSTRAINTS; PROJECT SCHEDULING; PSPLIB; RESOURCE ALLOCATION PROBLEM; RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM; TEST SETS; TOTAL COMPLETION TIME;

EID: 78650229345     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (6)

References (25)
  • 1
    • 0001849846 scopus 로고
    • Heuristic Algorithms for Resource Constrained Project Scheduling: A Review and Empirical Analysis
    • Amsterdam: Elsevier
    • Alvarez-Valdes, A., and Tamarit, J.M. "Heuristic Algorithms for Resource Constrained Project Scheduling: A Review and Empirical Analysis." Advances in Project Scheduling Edited by Slowinski and Weglarz. Amsterdam: Elsevier (1989), pp. 113-134.
    • (1989) Advances in Project Scheduling Edited by Slowinski and Weglarz , pp. 113-134
    • Alvarez-Valdes, A.1    Tamarit, J.M.2
  • 2
    • 40849130689 scopus 로고
    • COMSOAL: A Computer method of sequencing operations for assembly lines
    • Arcus, A.L. "COMSOAL: A Computer method of sequencing operations for assembly lines." International Journal of Production Research, 4, (1966), 259-277.
    • (1966) International Journal of Production Research , vol.4 , pp. 259-277
    • Arcus, A.L.1
  • 3
    • 84989743918 scopus 로고
    • A New Heuristic Solution Method in Resource Constrained Project Scheduling Problems
    • Bell, CE. and Han, J. "A New Heuristic Solution Method in Resource Constrained Project Scheduling Problems." Naval Research Logistics, 38, (1991), 315-331.
    • (1991) Naval Research Logistics , vol.38 , pp. 315-331
    • Bell, C.E.1    Han, J.2
  • 6
    • 0032096810 scopus 로고    scopus 로고
    • A Branch and Bound Algorithm for the Resource-Constrained Project Scheduling Problem
    • Brucker, P., Knust, S., Schoo, A., and Thiele, O. "A Branch and Bound Algorithm for the Resource-Constrained Project Scheduling Problem." European Journal of Operational Research, 107, (1998), 272-288.
    • (1998) European Journal of Operational Research , vol.107 , pp. 272-288
    • Brucker, P.1    Knust, S.2    Schoo, A.3    Thiele, O.4
  • 8
    • 0000813734 scopus 로고
    • An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
    • Davis, E.W. and Heidorn, G.E. "An Algorithm for Optimal Project Scheduling Under Multiple Resource Constraints." Management Science, 17, (1971), B803-B816.
    • (1971) Management Science , vol.17
    • Davis, E.W.1    Heidorn, G.E.2
  • 9
    • 0016498438 scopus 로고
    • A Comparison of Heuristics and Optimum Solutions in Resource Constrained Project Scheduling
    • Davis, E.W. and Patterson, J.H. "A Comparison of Heuristics and Optimum Solutions in Resource Constrained Project Scheduling." Management Science, 21, (1975), 944-955.
    • (1975) Management Science , vol.21 , pp. 944-955
    • Davis, E.W.1    Patterson, J.H.2
  • 10
    • 0002907360 scopus 로고
    • A Branch and Bound Procedure for the Multiple Resource Constrained Project Scheduling Problem
    • Demeulumeester, E. and Herroelen, W. "A Branch and Bound Procedure for the Multiple Resource Constrained Project Scheduling Problem." Management Science, 38, (1992), 1803-1818.
    • (1992) Management Science , vol.38 , pp. 1803-1818
    • Demeulumeester, E.1    Herroelen, W.2
  • 11
    • 0034296450 scopus 로고    scopus 로고
    • Applying the COMSOAL Computer Heuristic to the Constrained Resource Allocation Problem
    • DePuy G., and Whitehouse G., "Applying the COMSOAL Computer Heuristic to the Constrained Resource Allocation Problem," Computers and Industrial Engineering, 38, (2000), 413-422.
    • (2000) Computers and Industrial Engineering , vol.38 , pp. 413-422
    • DePuy, G.1    Whitehouse, G.2
  • 12
    • 0035922493 scopus 로고    scopus 로고
    • A simple and effective heuristic for the resource constrained project scheduling problem
    • DOI 10.1080/00207540110060608
    • DePuy G., and Whitehouse G., "A Simple and Effective Heuristic for the Multiple Resource Allocation Problem," International Journal of Production Research, Vol. 39, No. 14, (2001), pp. 3275-3287. (Pubitemid 35165542)
    • (2001) International Journal of Production Research , vol.39 , Issue.14 , pp. 3275-3287
    • DePuy, G.W.1    Whitehouse, G.E.2
  • 16
    • 0001896880 scopus 로고    scopus 로고
    • Adaptive Search for Solving Hard Project Scheduling Problems
    • Kolisch, R. and Drexl, A. "Adaptive Search for Solving Hard Project Scheduling Problems." Naval Research Logistics, 43, (1996), 23-40.
    • (1996) Naval Research Logistics , vol.43 , pp. 23-40
    • Kolisch, R.1    Drexl, A.2
  • 20
    • 0029393209 scopus 로고
    • A Survey on the Resource-constrained Project Scheduling Problem
    • Ozdamar, L. and Ulusoy, G. "A Survey on the Resource-constrained Project Scheduling Problem." IIE Transactions, 27, (1995), 574-586.
    • (1995) IIE Transactions , vol.27 , pp. 574-586
    • Ozdamar, L.1    Ulusoy, G.2
  • 21
    • 0021460636 scopus 로고
    • Comparison of Exact Approaches for Solving the Multiple Constrained Resource Project Scheduling Problem
    • Patterson, J.H. "Comparison of Exact Approaches for Solving the Multiple Constrained Resource Project Scheduling Problem." Management Science, 30, (1984), 854-867.
    • (1984) Management Science , vol.30 , pp. 854-867
    • Patterson, J.H.1
  • 22
    • 84989730007 scopus 로고
    • Local Search Techniques for the Generalized Resource Constrained Project Scheduling Problem
    • Sampson, S.E., and Weiss, E.N. "Local Search Techniques for the Generalized Resource Constrained Project Scheduling Problem." Naval Research Logistics, 40, (1993), 365-375.
    • (1993) Naval Research Logistics , vol.40 , pp. 365-375
    • Sampson, S.E.1    Weiss, E.N.2
  • 23
    • 0018011301 scopus 로고
    • Multiple-resource Constrained Scheduling Using Branch and Bound
    • Stinson, J.P., Davis, E.W., and Khumawala, B.W. "Multiple-resource Constrained Scheduling Using Branch and Bound. " AIIE Transactions, 10, (1978), 252-259.
    • (1978) AIIE Transactions , vol.10 , pp. 252-259
    • Stinson, J.P.1    Davis, E.W.2    Khumawala, B.W.3
  • 24
    • 0017997005 scopus 로고
    • An Efficient Integer Programming Algorithm with Network cuts for Solving Resource Constrained Scheduling Problems
    • Talbot, F.B. and Patterson, J.H. "An Efficient Integer Programming Algorithm with Network cuts for Solving Resource Constrained Scheduling Problems." Management Science, 24, (1978), 1163-1174.
    • (1978) Management Science , vol.24 , pp. 1163-1174
    • Talbot, F.B.1    Patterson, J.H.2
  • 25
    • 0010908011 scopus 로고    scopus 로고
    • Solving Constrained Multiple Resource Networks Both Forward and Backward Using Brooks Algorithm
    • Whitehouse, G.E., and G.W. DePuy. "Solving Constrained Multiple Resource Networks Both Forward and Backward Using Brooks Algorithm," Project Management Journal, Vol. 32, No. 4, (2001), pp. 24-31.
    • (2001) Project Management Journal , vol.32 , Issue.4 , pp. 24-31
    • Whitehouse, G.E.1    DePuy, G.W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.