메뉴 건너뛰기




Volumn 16, Issue 10, 2010, Pages 2271-2276

Maintenance outsourcing cost model for key equipments in mechanical manufacturing enterprises

Author keywords

Delay time; Inspection interval; Key equipments; Maintenance; Mechanical manufacturing enterprises; Outsourcing

Indexed keywords

COST MODELS; DELAY TIME; EQUIPMENT MANAGEMENT; EXPECTED NUMBER OF FAILURES; EXPECTED PROFITS; INSPECTION INTERVAL; INSPECTION INTERVALS; KEY EQUIPMENT; MAINTENANCE OUTSOURCING; MECHANICAL MANUFACTURING; NUMERICAL EXAMPLE; OUTSOURCED MAINTENANCE; RESEARCH OBJECT; SERVICE CONTRACT;

EID: 78649728819     PISSN: 10065911     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (3)

References (10)
  • 2
    • 78649752153 scopus 로고    scopus 로고
    • The risk analysis for outsourcing in small and medium-sized enterprises on equipment maintenance
    • (in Chinese).
    • Li Tingxi, Gu Ligang. The risk analysis for outsourcing in small and medium-sized enterprises on equipment maintenance[J]. Science Mosaic, 2009(2): 27-29(in Chinese).
    • (2009) Science Mosaic , Issue.2 , pp. 27-29
    • Li, T.1    Gu, L.2
  • 3
  • 5
    • 39649111750 scopus 로고    scopus 로고
    • Optimal maintenance service contract negotiatio with aging equipment
    • Jackson C, Pascual R. Optimal maintenance service contract negotiatio with aging equipment[J]. European Journal of Operational Research, 2008, 189(2): 387-398.
    • (2008) European Journal of Operational Research , vol.189 , Issue.2 , pp. 387-398
    • Jackson, C.1    Pascual, R.2
  • 6
    • 70249124645 scopus 로고    scopus 로고
    • A model for maintenance service contract design, negotiation and optimization
    • Wang Wenbin. A model for maintenance service contract design, negotiation and optimization[J]. European Journal of Operational Research, 2010, 201(1): 239-246.
    • (2010) European Journal of Operational Research , vol.201 , Issue.1 , pp. 239-246
    • Wang, W.1
  • 9
    • 0034250626 scopus 로고    scopus 로고
    • A data deficiency based parameter estimating problem and case study in delay-time PM modelling
    • Christer A H, Lee C, Wang W. A data deficiency based parameter estimating problem and case study in delay-time PM modelling[J]. International Journal of Production Economics, 2000, 67(1): 63-76.
    • (2000) International Journal of Production Economics , vol.67 , Issue.1 , pp. 63-76
    • Christer, A.H.1    Lee, C.2    Wang, W.3
  • 10
    • 43549114586 scopus 로고    scopus 로고
    • Modelling preventive maintenance of production plant given estimated PM data and actual failure times
    • Washington, D.C., USA: IEEE
    • Lu Wenyuan, Wang W. Modelling preventive maintenance of production plant given estimated PM data and actual failure times[C]//Proceedings of the International Conference on Management Science and Engineering 2006. Washington, D.C., USA: IEEE, 2006: 387-390.
    • (2006) Proceedings of the International Conference on Management Science and Engineering 2006 , pp. 387-390
    • Lu, W.1    Wang, W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.