-
1
-
-
0034893391
-
Repair contract decision model through additive utility function
-
Almeida A.T. Repair contract decision model through additive utility function. Journal of Quality in Maintenance Engineering 7 (2001) 42-48
-
(2001)
Journal of Quality in Maintenance Engineering
, vol.7
, pp. 42-48
-
-
Almeida, A.T.1
-
2
-
-
24144481467
-
Multicriteria modelling of repair contract based on utility and ELECTRE I method with dependability and service quality criteria
-
Almeida A.T. Multicriteria modelling of repair contract based on utility and ELECTRE I method with dependability and service quality criteria. Annals of Operations Research 128 (2005) 113-126
-
(2005)
Annals of Operations Research
, vol.128
, pp. 113-126
-
-
Almeida, A.T.1
-
4
-
-
0034974655
-
Pricing and managing a maintenance contract for a fleet of aircraft engines
-
Bowman R.A. Pricing and managing a maintenance contract for a fleet of aircraft engines. Simulation 6 (2001) 69-77
-
(2001)
Simulation
, vol.6
, pp. 69-77
-
-
Bowman, R.A.1
-
5
-
-
0000936628
-
Determining the delay time distribution of faults in repairable machinery from failure data
-
Baker R.D., and Wang W. Determining the delay time distribution of faults in repairable machinery from failure data. IMA Journal of Mathematics Applied in Business and Industry 3 (1991) 259-282
-
(1991)
IMA Journal of Mathematics Applied in Business and Industry
, vol.3
, pp. 259-282
-
-
Baker, R.D.1
Wang, W.2
-
7
-
-
0002382158
-
Modelling maintenance practice of production plant using the delay-time concept
-
Christer A.H., Wang W., Baker R.D., and Sharp J. Modelling maintenance practice of production plant using the delay-time concept. IMA J Management Mathematics 6 (1995) 67-83
-
(1995)
IMA J Management Mathematics
, vol.6
, pp. 67-83
-
-
Christer, A.H.1
Wang, W.2
Baker, R.D.3
Sharp, J.4
-
10
-
-
39649111750
-
Optimal maintenance service contract negotiation with aging equipment
-
387-398.1
-
Jackson C., and Pascual R. Optimal maintenance service contract negotiation with aging equipment. Euro Journal of Operational Research 189 (2008) 387-398.1
-
(2008)
Euro Journal of Operational Research
, vol.189
-
-
Jackson, C.1
Pascual, R.2
-
11
-
-
37249057823
-
BAE system wins Eurofighters typhoon repair service contracts
-
(November issue)
-
Jenning G. BAE system wins Eurofighters typhoon repair service contracts. Jane's Defense Industry (2007) (November issue)
-
(2007)
Jane's Defense Industry
-
-
Jenning, G.1
-
18
-
-
33645155244
-
Generalized proportional intensities models for repairable systems
-
Percy D.F., and Alkali B.M. Generalized proportional intensities models for repairable systems. IMA Journal of Management Mathematics 17 (2006) 171-185
-
(2006)
IMA Journal of Management Mathematics
, vol.17
, pp. 171-185
-
-
Percy, D.F.1
Alkali, B.M.2
-
19
-
-
70249095894
-
Solution algorithms for a multi-component system inspection model
-
Wang W., and Christer A.H. Solution algorithms for a multi-component system inspection model. Computers and OR 30 (2003) 134-190
-
(2003)
Computers and OR
, vol.30
, pp. 134-190
-
-
Wang, W.1
Christer, A.H.2
-
20
-
-
84951861240
-
Delay time modelling
-
Murthy D.N.P., and Kobbacy A.K.S. (Eds), Springer
-
Wang W. Delay time modelling. In: Murthy D.N.P., and Kobbacy A.K.S. (Eds). Complex System Maintenance Handbook (2008), Springer 345-370
-
(2008)
Complex System Maintenance Handbook
, pp. 345-370
-
-
Wang, W.1
|