메뉴 건너뛰기




Volumn 201, Issue 1, 2010, Pages 239-246

A model for maintenance service contract design, negotiation and optimization

Author keywords

Delay time; Inspection; Maintenance; Reliability; Repair; Service contract

Indexed keywords

CONTRACT DESIGN; DEFENSE SECTORS; DELAY TIME; INFORMATION ASYMMETRY; MAINTENANCE SERVICES; NUMERICAL EXAMPLE; ORIGINAL EQUIPMENT MANUFACTURERS; OUTSOURCED MAINTENANCE; SERVICE CONTRACT; SERVICE PROVIDER;

EID: 70249124645     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2009.02.018     Document Type: Article
Times cited : (73)

References (20)
  • 1
    • 0034893391 scopus 로고    scopus 로고
    • Repair contract decision model through additive utility function
    • Almeida A.T. Repair contract decision model through additive utility function. Journal of Quality in Maintenance Engineering 7 (2001) 42-48
    • (2001) Journal of Quality in Maintenance Engineering , vol.7 , pp. 42-48
    • Almeida, A.T.1
  • 2
    • 24144481467 scopus 로고    scopus 로고
    • Multicriteria modelling of repair contract based on utility and ELECTRE I method with dependability and service quality criteria
    • Almeida A.T. Multicriteria modelling of repair contract based on utility and ELECTRE I method with dependability and service quality criteria. Annals of Operations Research 128 (2005) 113-126
    • (2005) Annals of Operations Research , vol.128 , pp. 113-126
    • Almeida, A.T.1
  • 4
    • 0034974655 scopus 로고    scopus 로고
    • Pricing and managing a maintenance contract for a fleet of aircraft engines
    • Bowman R.A. Pricing and managing a maintenance contract for a fleet of aircraft engines. Simulation 6 (2001) 69-77
    • (2001) Simulation , vol.6 , pp. 69-77
    • Bowman, R.A.1
  • 5
    • 0000936628 scopus 로고
    • Determining the delay time distribution of faults in repairable machinery from failure data
    • Baker R.D., and Wang W. Determining the delay time distribution of faults in repairable machinery from failure data. IMA Journal of Mathematics Applied in Business and Industry 3 (1991) 259-282
    • (1991) IMA Journal of Mathematics Applied in Business and Industry , vol.3 , pp. 259-282
    • Baker, R.D.1    Wang, W.2
  • 7
    • 0002382158 scopus 로고
    • Modelling maintenance practice of production plant using the delay-time concept
    • Christer A.H., Wang W., Baker R.D., and Sharp J. Modelling maintenance practice of production plant using the delay-time concept. IMA J Management Mathematics 6 (1995) 67-83
    • (1995) IMA J Management Mathematics , vol.6 , pp. 67-83
    • Christer, A.H.1    Wang, W.2    Baker, R.D.3    Sharp, J.4
  • 10
    • 39649111750 scopus 로고    scopus 로고
    • Optimal maintenance service contract negotiation with aging equipment
    • 387-398.1
    • Jackson C., and Pascual R. Optimal maintenance service contract negotiation with aging equipment. Euro Journal of Operational Research 189 (2008) 387-398.1
    • (2008) Euro Journal of Operational Research , vol.189
    • Jackson, C.1    Pascual, R.2
  • 11
    • 37249057823 scopus 로고    scopus 로고
    • BAE system wins Eurofighters typhoon repair service contracts
    • (November issue)
    • Jenning G. BAE system wins Eurofighters typhoon repair service contracts. Jane's Defense Industry (2007) (November issue)
    • (2007) Jane's Defense Industry
    • Jenning, G.1
  • 15
  • 18
    • 33645155244 scopus 로고    scopus 로고
    • Generalized proportional intensities models for repairable systems
    • Percy D.F., and Alkali B.M. Generalized proportional intensities models for repairable systems. IMA Journal of Management Mathematics 17 (2006) 171-185
    • (2006) IMA Journal of Management Mathematics , vol.17 , pp. 171-185
    • Percy, D.F.1    Alkali, B.M.2
  • 19
    • 70249095894 scopus 로고    scopus 로고
    • Solution algorithms for a multi-component system inspection model
    • Wang W., and Christer A.H. Solution algorithms for a multi-component system inspection model. Computers and OR 30 (2003) 134-190
    • (2003) Computers and OR , vol.30 , pp. 134-190
    • Wang, W.1    Christer, A.H.2
  • 20
    • 84951861240 scopus 로고    scopus 로고
    • Delay time modelling
    • Murthy D.N.P., and Kobbacy A.K.S. (Eds), Springer
    • Wang W. Delay time modelling. In: Murthy D.N.P., and Kobbacy A.K.S. (Eds). Complex System Maintenance Handbook (2008), Springer 345-370
    • (2008) Complex System Maintenance Handbook , pp. 345-370
    • Wang, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.