메뉴 건너뛰기




Volumn 67, Issue 1, 2000, Pages 63-76

A data deficiency based parameter estimating problem and case study in delay time PM modeling

Author keywords

[No Author keywords available]

Indexed keywords

CORRELATION METHODS; DATA STRUCTURES; INSPECTION; MATHEMATICAL MODELS; MAXIMUM LIKELIHOOD ESTIMATION; PARAMETER ESTIMATION; PREVENTIVE MAINTENANCE; PROBLEM SOLVING; PROCESS ENGINEERING; QUALITY ASSURANCE; QUALITY CONTROL; REPAIR;

EID: 0034250626     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(00)00010-4     Document Type: Article
Times cited : (25)

References (12)
  • 2
    • 0033366210 scopus 로고    scopus 로고
    • Development in delay time analysis for modeling plant maintenance
    • Christer A.H. Development in delay time analysis for modeling plant maintenance. Journal of the Operational Research Society. 50:2000;1120-1137.
    • (2000) Journal of the Operational Research Society , vol.50 , pp. 1120-1137
    • Christer, A.H.1
  • 3
    • 0021522019 scopus 로고
    • An operational research approach to planned maintenance: Modeling P.M. for a vehicle fleet
    • Christer A.H., Waller W.M. An operational research approach to planned maintenance. Modeling P.M. for a vehicle fleet Journal of the Operational Research Society. 35:1984;967-984.
    • (1984) Journal of the Operational Research Society , vol.35 , pp. 967-984
    • Christer, A.H.1    Waller, W.M.2
  • 5
    • 0013101884 scopus 로고
    • Ph.D. Thesis, Department of Mathematics and Computer Science, University of Salford, UK
    • M.I. Desa, Bus fleet maintenance modeling in a developing country, Ph.D. Thesis, Department of Mathematics and Computer Science, University of Salford, UK, 1995.
    • (1995) Bus Fleet Maintenance Modeling in a Developing Country
    • Desa, M.I.1
  • 6
    • 0000936628 scopus 로고
    • Estimating the delay-time distribution of faults in repairable machinery from failure data
    • Baker R.D., Wang W. Estimating the delay-time distribution of faults in repairable machinery from failure data. IMA Journal of Mathematics Applied in Business and Industry. 3:1992;259-281.
    • (1992) IMA Journal of Mathematics Applied in Business and Industry , vol.3 , pp. 259-281
    • Baker, R.D.1    Wang, W.2
  • 11
    • 0020844127 scopus 로고
    • An operational research approach to breakdown maintenance: Problem recognition
    • Christer A.H., Whitelaw J. An operational research approach to breakdown maintenance. Problem recognition Journal of the Operational Research Society. 34:1983;1041-1052.
    • (1983) Journal of the Operational Research Society , vol.34 , pp. 1041-1052
    • Christer, A.H.1    Whitelaw, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.