메뉴 건너뛰기




Volumn 209, Issue 1, 2011, Pages 51-56

A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times

Author keywords

Cyclic scheduling; Efficient algorithms; Graph theoretic models; Polynomial models; Robotic scheduling

Indexed keywords

CYCLIC SCHEDULING; EFFICIENT ALGORITHMS; GRAPH-THEORETIC MODELS; POLYNOMIAL MODELS; ROBOTIC SCHEDULING;

EID: 78649472963     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2010.10.002     Document Type: Article
Times cited : (34)

References (24)
  • 1
    • 0033871635 scopus 로고    scopus 로고
    • Scheduling no-wait robotic cells with two and three machines
    • A. Agnetis Scheduling no-wait robotic cells with two and three machines European Journal of Operational Research 123 2 2000 303 314
    • (2000) European Journal of Operational Research , vol.123 , Issue.2 , pp. 303-314
    • Agnetis, A.1
  • 4
    • 67349222218 scopus 로고    scopus 로고
    • Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots
    • A. Che, and C. Chu Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots European Journal of Operational Research 199 1 2009 77 88
    • (2009) European Journal of Operational Research , vol.199 , Issue.1 , pp. 77-88
    • Che, A.1    Chu, C.2
  • 5
    • 0037448766 scopus 로고    scopus 로고
    • A polynomial algorithm for 2-degree cyclic robot scheduling
    • A. Che, C. Chu, and E. Levner A polynomial algorithm for 2-degree cyclic robot scheduling European Journal of Operational Research 145 1 2003 31 44
    • (2003) European Journal of Operational Research , vol.145 , Issue.1 , pp. 31-44
    • Che, A.1    Chu, C.2    Levner, E.3
  • 7
    • 33745207776 scopus 로고    scopus 로고
    • A faster polynomial algorithm for 2-cyclic robotic scheduling
    • C. Chu A faster polynomial algorithm for 2-cyclic robotic scheduling Journal of Scheduling 9 5 2006 453 468
    • (2006) Journal of Scheduling , vol.9 , Issue.5 , pp. 453-468
    • Chu, C.1
  • 10
    • 78649479964 scopus 로고    scopus 로고
    • Cyclic scheduling in 3-machine robotic flow shops
    • Maastricht Research School of Economics of Technology and Organization
    • Crama, Y., Klundert van de, J., Cyclic scheduling in 3-machine robotic flow shops, Research Memorandum RM 97018, Maastricht Research School of Economics of Technology and Organization, 1997.
    • (1997) Research Memorandum RM 97018
    • Crama, Y.1    Van De, K.J.2
  • 13
    • 0021372387 scopus 로고
    • Linear time algorithms for two- and three-variable linear programming
    • M.E. Dyer Linear time algorithms for two- and three-variable linear programming SIAM Journal on Computing 13 1 1984 31 45
    • (1984) SIAM Journal on Computing , vol.13 , Issue.1 , pp. 31-45
    • Dyer, M.E.1
  • 15
    • 85215356632 scopus 로고    scopus 로고
    • Operations research techniques for robotic systems
    • N.G. Hall Operations research techniques for robotic systems S.Y. Nof, Handbook of Industrial Robotics second ed. 1999 John Wiley New York 543 577
    • (1999) Handbook of Industrial Robotics , pp. 543-577
    • Hall, N.G.1
  • 17
    • 37049026687 scopus 로고    scopus 로고
    • Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence and time-window constraints
    • V. Kats, L. Lei, and E. Levner Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence and time-window constraints European Journal of Operational Research 187 3 2008 1196 1211
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 1196-1211
    • Kats, V.1    Lei, L.2    Levner, E.3
  • 18
    • 79958090459 scopus 로고    scopus 로고
    • Parametric algorithms for 2-cyclic robot scheduling with interval processing times
    • 10.1007/s10951-010-0166-0
    • V. Kats, and E. Levner Parametric algorithms for 2-cyclic robot scheduling with interval processing times Journal of Scheduling 2010 10.1007/s10951-010-0166-0
    • (2010) Journal of Scheduling
    • Kats, V.1    Levner, E.2
  • 19
    • 56349083345 scopus 로고    scopus 로고
    • A polynomial algorithm for 2-cyclic robotic scheduling: A non-Euclidean case
    • V. Kats, and E. Levner A polynomial algorithm for 2-cyclic robotic scheduling: a non-Euclidean case Discrete Applied Mathematics 157 2 2009 339 355
    • (2009) Discrete Applied Mathematics , vol.157 , Issue.2 , pp. 339-355
    • Kats, V.1    Levner, E.2
  • 20
    • 0001391363 scopus 로고
    • A characterization of the minimum cycle mean in a digraph
    • R.M. Karp A characterization of the minimum cycle mean in a digraph Discrete Mathematics 23 3 1978 309 311
    • (1978) Discrete Mathematics , vol.23 , Issue.3 , pp. 309-311
    • Karp, R.M.1
  • 21
    • 0027684058 scopus 로고
    • Determining the optimal starting times in a cyclic schedule with a given route
    • L. Lei Determining the optimal starting times in a cyclic schedule with a given route Computers and Operations Research 20 8 1993 807 816
    • (1993) Computers and Operations Research , vol.20 , Issue.8 , pp. 807-816
    • Lei, L.1
  • 22
    • 0000136120 scopus 로고    scopus 로고
    • A parametric critical path problem and an application for cyclic scheduling
    • E. Levner, and V. Kats A parametric critical path problem and an application for cyclic scheduling Discrete Applied Mathematics 87 1998 149 158
    • (1998) Discrete Applied Mathematics , vol.87 , pp. 149-158
    • Levner, E.1    Kats, V.2
  • 24
    • 0000423548 scopus 로고
    • Linear time algorithms for linear programming in R3 and related problems
    • N. Meggido Linear time algorithms for linear programming in R3 and related problems SIAM Journal on Computing 12 4 1983 759 776
    • (1983) SIAM Journal on Computing , vol.12 , Issue.4 , pp. 759-776
    • Meggido, N.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.