메뉴 건너뛰기




Volumn 14, Issue 3, 2011, Pages 267-279

Parametric algorithms for 2-cyclic robot scheduling with interval processing times

Author keywords

Binary search; Cyclic scheduling; Efficient algorithms; Graph theoretic models; Polynomial models; Robotic scheduling

Indexed keywords

BINARY SEARCH; CYCLIC SCHEDULING; EFFICIENT ALGORITHM; GRAPH-THEORETIC MODELS; POLYNOMIAL MODELS; ROBOTIC SCHEDULING;

EID: 79958090459     PISSN: 10946136     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10951-010-0166-0     Document Type: Article
Times cited : (13)

References (29)
  • 1
    • 0003810468 scopus 로고
    • Scheduling of robot moves and parts in a robotic cell
    • K. E. Stecke R. Suri (eds). Elsevier Amsterdam
    • Blazewicz, J.; Sethi, S. P.; & Sriskandarajah, C. (1989). Scheduling of robot moves and parts in a robotic cell. In K. E. Stecke & R. Suri (Eds.), Operations research models and applications (pp. 281-286). Amsterdam: Elsevier.
    • (1989) Operations Research Models and Applications , pp. 281-286
    • Blazewicz, J.1    Sethi, S.P.2    Sriskandarajah, C.3
  • 2
    • 49749086485 scopus 로고    scopus 로고
    • Identical part production in cyclic robotic cells: Concepts, overview and open questions
    • 10.1016/j.dam.2008.03.021
    • N. Brauner 2008 Identical part production in cyclic robotic cells: Concepts, overview and open questions Discrete Applied Mathematics 156 2480 2492 10.1016/j.dam.2008.03.021
    • (2008) Discrete Applied Mathematics , vol.156 , pp. 2480-2492
    • Brauner, N.1
  • 3
    • 0035816116 scopus 로고    scopus 로고
    • Cycles and permutations in robotic cells
    • DOI 10.1016/S0895-7177(01)00084-X, PII S089571770100084X
    • N. Brauner G. Finke 2001 Cycles and permutations in robotic cells Mathematical and Computer Modeling 34 565 591 10.1016/S0895-7177(01)00084-X (Pubitemid 32770356)
    • (2001) Mathematical and Computer Modelling , vol.34 , Issue.5-6 , pp. 565-591
    • Brauner, N.1    Finke, G.2
  • 4
    • 0035546060 scopus 로고    scopus 로고
    • Optimal moves of the material handling system in a robotic cell
    • DOI 10.1016/S0925-5273(01)00132-3, PII S0925527301001323
    • N. Brauner G. Finke 2001 Optimal moves of the material handling system in a robotic cell International Journal of Production Economics 74 269 277 10.1016/S0925-5273(01)00132-3 (Pubitemid 32998211)
    • (2001) International Journal of Production Economics , vol.74 , Issue.1-3 , pp. 269-277
    • Brauner, N.1    Finke, G.2
  • 5
    • 3543073493 scopus 로고    scopus 로고
    • Complexity of one-cycle robotic flow shops
    • 10.1023/A:1024008726557
    • N. Brauner G. Finke W. Kubiak 2003 Complexity of one-cycle robotic flow shops Journal of Scheduling 6 4 355 371 10.1023/A:1024008726557
    • (2003) Journal of Scheduling , vol.6 , Issue.4 , pp. 355-371
    • Brauner, N.1    Finke, G.2    Kubiak, W.3
  • 7
    • 0036476753 scopus 로고    scopus 로고
    • Multicyclic hoist scheduling with constant processing times
    • DOI 10.1109/70.988976, PII S1042296X02017780
    • A. Che C. Chu F. Chu 2002 Multicyclic hoist scheduling with constant processing times IEEE Transactions on Robotics and Automation 18 1 69 80 10.1109/70.988976 (Pubitemid 34414687)
    • (2002) IEEE Transactions on Robotics and Automation , vol.18 , Issue.1 , pp. 69-80
    • Che, A.1    Chu, C.2    Chu, F.3
  • 8
    • 0037448766 scopus 로고    scopus 로고
    • A polynomial algorithm for 2-degree cyclic robot scheduling
    • 10.1016/S0377-2217(02)00175-3
    • A. Che C. Chu E. Levner 2003 A polynomial algorithm for 2-degree cyclic robot scheduling European Journal of Operational Research 145 1 31 44 10.1016/S0377-2217(02)00175-3
    • (2003) European Journal of Operational Research , vol.145 , Issue.1 , pp. 31-44
    • Che, A.1    Chu, C.2    Levner, E.3
  • 9
    • 33745207776 scopus 로고    scopus 로고
    • A faster polynomial algorithm for 2-cyclic robotic scheduling
    • 10.1007/s10951-006-8501-1
    • C. Chu 2006 A faster polynomial algorithm for 2-cyclic robotic scheduling Journal of Scheduling 9 5 453 468 10.1007/s10951-006-8501-1
    • (2006) Journal of Scheduling , vol.9 , Issue.5 , pp. 453-468
    • Chu, C.1
  • 12
    • 23944522312 scopus 로고    scopus 로고
    • Sequencing and scheduling in robotic cells: Recent developments
    • DOI 10.1007/s10951-005-2861-9
    • M. Dawande H. N. Geismar S. P. Sethi C. Sriskandarajah 2005 Sequencing and scheduling in robotic cells: Recent developments Journal of Scheduling 8 387 426 10.1007/s10951-005-2861-9 (Pubitemid 41202890)
    • (2005) Journal of Scheduling , vol.8 , Issue.5 , pp. 387-426
    • Dawande, M.1    Geismar, H.N.2    Sethi, S.P.3    Sriskandarajah, C.4
  • 14
    • 77649308311 scopus 로고    scopus 로고
    • Throughput optimization in dual-gripper interval robotic cells
    • 10.1080/07408170902789092
    • M. W. Dawande H. N. Geismar M. Pinedo C. Sriskandarajah 2010 Throughput optimization in dual-gripper interval robotic cells IIE Transactions 42 1 1 15 10.1080/07408170902789092
    • (2010) IIE Transactions , vol.42 , Issue.1 , pp. 1-15
    • Dawande, M.W.1    Geismar, H.N.2    Pinedo, M.3    Sriskandarajah, C.4
  • 15
    • 9644308134 scopus 로고    scopus 로고
    • Approximation algorithms for k-unit cyclic solutions in robotic cells
    • 10.1016/j.ejor.2003.09.013
    • H. N. Geismar M. Dawande C. Sriskandarajah 2005 Approximation algorithms for k-unit cyclic solutions in robotic cells European Journal of Operational Research 162 2 291 309 10.1016/j.ejor.2003.09.013
    • (2005) European Journal of Operational Research , vol.162 , Issue.2 , pp. 291-309
    • Geismar, H.N.1    Dawande, M.2    Sriskandarajah, C.3
  • 16
    • 0012220631 scopus 로고    scopus 로고
    • Operations research techniques for robotic systems
    • S. Y. Nof (eds). Wiley New York
    • Hall, N. G. (2007). Operations research techniques for robotic systems. In S. Y. Nof (Ed.), Handbook of industrial robotics (Vol. II, pp. 543-577). New York: Wiley.
    • (2007) Handbook of Industrial Robotics II , pp. 543-577
    • Hall, N.G.1
  • 18
    • 0345757595 scopus 로고    scopus 로고
    • Cyclic scheduling on a robotic production line
    • 10.1002/jos.92
    • V. Kats E. Levner 2002 Cyclic scheduling on a robotic production line Journal of Scheduling 5 23 41 10.1002/jos.92
    • (2002) Journal of Scheduling , vol.5 , pp. 23-41
    • Kats, V.1    Levner, E.2
  • 19
    • 57049169652 scopus 로고    scopus 로고
    • Parametric algorithms for cyclic scheduling problems with applications to robotics
    • A. Gelbukh E. F. Morales (eds). Springer Berlin
    • Kats, V.; & Levner, E. (2008). Parametric algorithms for cyclic scheduling problems with applications to robotics. In A. Gelbukh & E. F. Morales (Eds.), Lecture notes in computer science : Vol. 5317. Proceedings of MICAI-2008 (pp. 653-663). Berlin: Springer.
    • (2008) Proceedings of MICAI-2008 Lecture Notes in Computer Science , vol.5317 , pp. 653-663
    • Kats, V.1    Levner, E.2
  • 20
    • 56349083345 scopus 로고    scopus 로고
    • A polynomial algorithm for 2-cyclic robotic scheduling: A non-Euclidean case
    • 10.1016/j.dam.2008.03.025
    • V. Kats E. Levner 2009 A polynomial algorithm for 2-cyclic robotic scheduling: A non-Euclidean case Discrete Applied Mathematics 157 2 339 355 10.1016/j.dam.2008.03.025
    • (2009) Discrete Applied Mathematics , vol.157 , Issue.2 , pp. 339-355
    • Kats, V.1    Levner, E.2
  • 21
    • 0032646146 scopus 로고    scopus 로고
    • Multiple-part cyclic hoist scheduling using a sieve method
    • 10.1109/70.781993
    • V. Kats E. Levner L. Meyzin 1999 Multiple-part cyclic hoist scheduling using a sieve method IEEE Transactions on Robotics and Automation 15 4 704 713 10.1109/70.781993
    • (1999) IEEE Transactions on Robotics and Automation , vol.15 , Issue.4 , pp. 704-713
    • Kats, V.1    Levner, E.2    Meyzin, L.3
  • 22
    • 37049026687 scopus 로고    scopus 로고
    • Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints
    • DOI 10.1016/j.ejor.2006.07.030, PII S0377221706008319
    • V. Kats L. Lei E. Levner 2008 Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence and time-window constraints European Journal of Operational Research 187 3 1196 1211 10.1016/j.ejor.2006.07.030 (Pubitemid 350245723)
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 1196-1211
    • Kats, V.1    Lei, L.2    Levner, E.3
  • 24
    • 0028396353 scopus 로고
    • Determining optimal cyclic hoist schedules in a single-hoist electroplating line
    • 10.1080/07408179408966593
    • L. Lei T. J. Wang 1994 Determining optimal cyclic hoist schedules in a single-hoist electroplating line IEE Transactions 26 2 25 33 10.1080/07408179408966593
    • (1994) IEE Transactions , vol.26 , Issue.2 , pp. 25-33
    • Lei, L.1    Wang, T.J.2
  • 25
    • 0000136120 scopus 로고    scopus 로고
    • A parametric critical path problem and an application for cyclic scheduling
    • PII S0166218X98000547
    • E. Levner V. Kats 1998 A parametric critical path problem and an application for cyclic scheduling Discrete Applied Mathematics 87 149 158 10.1016/S0166-218X(98)00054-7 (Pubitemid 128405703)
    • (1998) Discrete Applied Mathematics , vol.87 , Issue.1-3 , pp. 149-158
    • Levner, E.1    Kats, V.2
  • 26
    • 0013188060 scopus 로고    scopus 로고
    • A geometric algorithm for finding two-unit cyclic schedules in no-wait robotic flowshop
    • E. Levner (eds). HAIT Press Holon
    • Levner, E.; Kats, V.; & Sriskandarajah, C. (1996). A geometric algorithm for finding two-unit cyclic schedules in no-wait robotic flowshop. In E. Levner (Ed.), Intelligent scheduling of robots and FMS (pp. 101-112). Holon: HAIT Press.
    • (1996) Intelligent Scheduling of Robots and FMS , pp. 101-112
    • Levner, E.1    Kats, V.2    Sriskandarajah, C.3
  • 27
    • 0031095268 scopus 로고    scopus 로고
    • An improved algorithm for cyclic flowshop scheduling in a robotic cell
    • PII S037722179600272X
    • E. Levner V. Kats V. Levit 1997 An improved algorithm for cyclic flowshop scheduling in a robotic cell European Journal of Operational Research 97 500 508 10.1016/S0377-2217(96)00272-X (Pubitemid 127418514)
    • (1997) European Journal of Operational Research , vol.97 , Issue.3 , pp. 500-508
    • Levner, E.1    Kats, V.2    Levit, V.E.3
  • 28
    • 34250338898 scopus 로고    scopus 로고
    • Geometric intersection
    • J. E. Goodman J. O'Rourke (eds). Chapman&Hall/CRC Boca Raton
    • Mount, D. M. (2004). Geometric intersection. In J. E. Goodman & J. O'Rourke (Eds.), The handbook of discrete and computational geometry (pp. 857-876). Boca Raton: Chapman&Hall/CRC.
    • (2004) The Handbook of Discrete and Computational Geometry , pp. 857-876
    • Mount, D.M.1
  • 29
    • 0003224933 scopus 로고    scopus 로고
    • Mathematical problems for the next century
    • V. Arnold M. Atiyah P. Lax B. Mazur (eds). American Mathematics Society Providence
    • Smale, S. (2000). Mathematical problems for the next century. In V. Arnold, M. Atiyah, P. Lax, & B. Mazur (Eds.), Mathematics: frontiers and perspectives (pp. 271-294). Providence: American Mathematics Society.
    • (2000) Mathematics: Frontiers and Perspectives , pp. 271-294
    • Smale, S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.