A development of next generation intelligent construction liftcar toolkit for vertical material movement management
-
C. Cho, T. Shin, S. Kwon, S. Chin, Y. Kim, and J. Lee A development of next generation intelligent construction liftcar toolkit for vertical material movement management Conference Proceeding of ICCEM 2009
-
(2009)
Conference Proceeding of ICCEM
-
-
Cho, C.1
Shin, T.2
Kwon, S.3
Chin, S.4
Kim, Y.5
Lee, J.6
-
2
-
-
84863766827
-
Basic study of smart robotic construction lift for increasing resource lifting efficiency in high-rise building construction
-
C. Cho, S. Kwon, J. Lee, S. You, S. Chin, and Y. Kim Basic study of smart robotic construction lift for increasing resource lifting efficiency in high-rise building construction Conference Proceeding of ISARC 2009
-
(2009)
Conference Proceeding of ISARC
-
-
Cho, C.1
Kwon, S.2
Lee, J.3
You, S.4
Chin, S.5
Kim, Y.6
-
3
-
-
78649334312
-
Hoist scheduling chart and lifting load leveling method for applying JIT in construction
-
S. Shin Hoist scheduling chart and lifting load leveling method for applying JIT in construction Journal of AIK 25 2 2009
-
(2009)
Journal of AIK
, vol.25
, Issue.2
-
-
Shin, S.1
-
4
-
-
78649327839
-
A development of mechanism on supply chain information recognition among intelligent equipment for USN based construction supply chain management process
-
S. Kwon A development of mechanism on supply chain information recognition among intelligent equipment for USN based construction supply chain management process Conference Proceeding of KICEM 2008
-
(2008)
Conference Proceeding of KICEM
-
-
Kwon, S.1
-
5
-
-
39349114541
-
-
S. Chin, S. Yoon, C. Choi, and C. Cho RFID + 4D CAD for Progress Management of Structural Steel Works in High-Rise Buildings vol. 22, No. 2 2008 74 89
-
(2008)
RFID + 4D CAD for Progress Management of Structural Steel Works in High-Rise Buildings
, vol.222
, pp. 74-89
-
-
Chin, S.1
Yoon, S.2
Choi, C.3
Cho, C.4
-
6
-
-
78649330560
-
Procurement management impact on scheduling
-
J. Lee Procurement management impact on scheduling Journal of AIK 23 12 2007 143
-
(2007)
Journal of AIK
, vol.23
, Issue.12
, pp. 143
-
-
Lee, J.1
-
7
-
-
78649315884
-
Real-time construction operation tracking from resource positions
-
Y. Su, and L. Liu Real-time construction operation tracking from resource positions Computing in Engineering 2007 2007 200 207
-
(2007)
Computing in Engineering
, vol.2007
, pp. 200-207
-
-
Su, Y.1
Liu, L.2
-
8
-
-
70350207027
-
Realtime 4d Cad + Rfid for project progress management
-
S. Chin, S. Yoon, Y. Kim, J. Ryu, C. Choi, and C. Cho Realtime 4d Cad + Rfid for project progress management Construction Research Congress 2005 2005 1 10
-
(2005)
Construction Research Congress
, vol.2005
, pp. 1-10
-
-
Chin, S.1
Yoon, S.2
Kim, Y.3
Ryu, J.4
Choi, C.5
Cho, C.6
-
11
-
-
78649330357
-
Developing the tower cranes planning process in high-rise building project
-
H. Chae, M. Jang, and H. Lee Developing the tower cranes planning process in high-rise building project Conference Proceeding of KICEM 2 2001 387 395
-
(2001)
Conference Proceeding of KICEM
, Issue.2
, pp. 387-395
-
-
Chae, H.1
Jang, M.2
Lee, H.3
-
12
-
-
78649315790
-
A location model for tower cranes of high-rise building construction
-
J. Park, H. Lee, C. Hyun, and K. Koo A location model for tower cranes of high-rise building construction Conference Proceeding of KICEM 4 2003 614 617
-
(2003)
Conference Proceeding of KICEM
, Issue.4
, pp. 614-617
-
-
Park, J.1
Lee, H.2
Hyun, C.3
Koo, K.4
-
13
-
-
78649328016
-
Planning an optimized horizontal move for finishing material in high-rise building construction
-
B. Ahn, J. Kim, and N. Jee Planning an optimized horizontal move for finishing material in high-rise building construction Journals of AIK 17 8 2001 119 131
-
(2001)
Journals of AIK
, vol.17
, Issue.8
, pp. 119-131
-
-
Ahn, B.1
Kim, J.2
Jee, N.3
-
14
-
-
78649329083
-
A Study of the high-rise building's lift-up management: Though division of loading factors of equipment materials
-
Y. Jung, E. Kim, H. Seo, and C. Kim A Study of the high-rise building's lift-up management: though division of loading factors of equipment materials Conference Proceeding of KICEM 5 2004 539 553
-
(2004)
Conference Proceeding of KICEM
, Issue.5
, pp. 539-553
-
-
Jung, Y.1
Kim, E.2
Seo, H.3
Kim, C.4
-
17
-
-
78649327916
-
Field experiments of an automated materials identification and localization model
-
D. Torrent, and C. Caldas Field experiments of an automated materials identification and localization model Computing in Engineering 2007 2007 689 696
-
(2007)
Computing in Engineering 2007
, pp. 689-696
-
-
Torrent, D.1
Caldas, C.2
-
18
-
-
58149259941
-
Methodology for automating the identification and localization of construction components on industrial projects
-
D. Torrent, and C. Caldas Methodology for automating the identification and localization of construction components on industrial projects Journal of Computing in Civil Engineering 23 1 2009 3 13
-
(2009)
Journal of Computing in Civil Engineering
, vol.23
, Issue.1
, pp. 3-13
-
-
Torrent, D.1
Caldas, C.2
-
19
-
-
78649323790
-
A vertical movement plan for labors in high rise building construction using discrete event simulation
-
B. Ahn A vertical movement plan for labors in high rise building construction using discrete event simulation Journal fo KICEM 5 1 2004 47 54
-
(2004)
Journal Fo KICEM
, vol.5
, Issue.1
, pp. 47-54
-
-
Ahn, B.1
|